Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198A380 + (ML20198A380)
- ML20198A381 + (ML20198A381)
- ML20198A382 + (ML20198A382)
- ML20198A383 + (ML20198A383)
- ML20198A385 + (ML20198A385)
- ML20198A386 + (ML20198A386)
- ML20198A387 + (ML20198A387)
- 05000483/LER-1997-005-05, Forwards LER 97-005-05,re Situation in Which Surveillances Required by TS Were Missed Due to Misintepretation of SR, Per 10CFR50.73(a)(2)(i)(B) + (ML20198A388)
- ML20198A390 + (ML20198A390)
- ML20198A391 + (ML20198A391)
- ML20198A394 + (ML20198A394)
- ML20198A395 + (ML20198A395)
- ML20198A396 + (ML20198A396)
- ML20198A397 + (ML20198A397)
- PY-CEI-NRR-2343, Supplements 980630 LAR Submitted by Pnpp,Which Requested Increase in Boron Concentration in Slcs.Response to Questions,Encl + (ML20198A398)
- ML20198A399 + (ML20198A399)
- ML20198A400 + (ML20198A400)
- ML20198A402 + (ML20198A402)
- ML20198A403 + (ML20198A403)
- 05000528/LER-1985-073, :on 850915,step Determining RCS (AB) Flowrate Signed Off as Not Applicable.Flowrate Determination Also Missed in Surveillances on 850606 & 0705.Flowrate Verified Satisfactory by Completion of 41ST-12218 + (ML20198A410)
- ML20198A411 + (ML20198A411)
- IR 05000146/1998204 + (ML20198A412)
- ML20198A414 + (ML20198A414)
- 05000285/LER-1985-007, :on 851001,unplanned Actuation of Ventilation Isolation Actuation Sys Occurred.Esf Initiated by Containment Stack Radiation Gas Monitor RM-062.Caused by Flow of Containment Air in Ventilation Stack + (ML20198A415)
- ML20198A417 + (ML20198A417)
- ML20198A419 + (ML20198A419)
- ML20198A420 + (ML20198A420)
- ML20198A421 + (ML20198A421)
- ML20198A422 + (ML20198A422)
- ML20198A424 + (ML20198A424)
- 05000348/LER-1983-013-03, /03L-0:on 830329,instrumentation Loop Associated W/Steam Generator 1A Level Transmitter LT-475 Declared Inoperable Due to Low Indication.Caused by Failure of Power Supply Card.Card Replaced + (ML20198A425)
- ML20198A430 + (ML20198A430)
- ML20198A431 + (ML20198A431)
- ML20198A433 + (ML20198A433)
- ML20198A434 + (ML20198A434)
- PY-CEI-NRR-2348, Forwards Response to NRC RAI During 981119 Telcon Re License Amend Request for Extension of EDG TS Action Completion Time to 14 Days for Div 1 or 2 EDG + (ML20198A435)
- B17562, Submits Withdrawal of LAR Re Pressurizer Pressure for Shudown Cooling Sys Interlock.Util Had Previously Determined That Deviation Involved Unreviewed Safety Question (Usq),As Defined in 10CFR50.59 + (ML20198A438)
- IR 05000369/1985034 + (ML20198A440)
- ML20198A443 + (ML20198A443)
- ML20198A444 + (ML20198A444)
- ML20198A445 + (ML20198A445)
- ML20198A446 + (ML20198A446)
- 05000364/LER-1983-022, Forwards LERs 83-020/03L-0 & 83-022/03L-0.W/o LER 83-022/03L-0 + (ML20198A447)
- ML20198A448 + (ML20198A448)
- ML20198A452 + (ML20198A452)
- 05000364/LER-1983-020-03, /03L-0:on 830420,steam Generator Pressure Transmitter PT485 Instrumentation Loop Declared Inoperable. Caused by Setpoint Drift of Printed Circuit Card.Card Replaced & Instrument Loop Declared Operable + (ML20198A453)
- ML20198A454 + (ML20198A454)
- ML20198A458 + (ML20198A458)
- 05000458/LER-1985-009, :on 850926,reactor Water Cleanup Containment Isolation Initiated When Temp Reading Obtained from Leak Detection Differential Temp Switch.Caused by Flaw in Switch Design.Mfg Mod to Circuitry Recommended + (ML20198A459)
- 05000352/LER-1985-078, :on 850831,Tech Spec Surveillance Test for Control Rod Operability Not Performed.Caused by Personnel Error.Surveillance Test Performed on 851001.Test Now Listed on Weekly Schedule + (ML20198A461)
- ML20198A462 + (ML20198A462)