Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20197H414 + (ML20197H414)
- ML20197H420 + (ML20197H420)
- ML20197H421 + (ML20197H421)
- ML20197H422 + (ML20197H422)
- ML20197H423 + (ML20197H423)
- ML20197H426 + (ML20197H426)
- ML20197H429 + (ML20197H429)
- ML20197H432 + (ML20197H432)
- IR 05000456/1998018 + (ML20197H436)
- ML20197H442 + (ML20197H442)
- ML20197H444 + (ML20197H444)
- B16922, Ack Receipt of Transmitting Insp Rept 50-423/97-206 & Which Requested Info Re Evaluation of Scope & Effectiveness of CMP & Response to Nov.Extension of Response Date for Both Items Requested Until 980116 + (ML20197H446)
- ML20197H449 + (ML20197H449)
- ML20197H450 + (ML20197H450)
- ML20197H452 + (ML20197H452)
- IR 05000305/1990017 + (ML20197H453)
- ML20197H454 + (ML20197H454)
- ML20197H455 + (ML20197H455)
- ML20197H456 + (ML20197H456)
- ML20197H457 + (ML20197H457)
- 05000382/LER-1990-016-02, :on 901014,two Posted High Radiation Areas Greater than 1000 Mrems Discovered Not Locked Per Tech Spec 6.12.2.W/undated Ltr + (ML20197H458)
- ML20197H460 + (ML20197H460)
- 05000423/LER-1996-034-02, Forwards LER 96-034-02,documenting Condition That Was Initially Determined Reportable at Millstone Unit 3 on 960918.Commitments Made in Response to Event Also Encl + (ML20197H461)
- ML20197H462 + (ML20197H462)
- 05000424/LER-1990-020-01, :on 900808,personnel Error Led to Tech Spec Violation + (ML20197H464)
- ML20197H467 + (ML20197H467)
- ML20197H468 + (ML20197H468)
- 05000301/LER-1990-002-01, :on 901009,inadvertent Start of Auxiliary Feedwater Pumps Occurred + (ML20197H469)
- 05000423/LER-1996-034, :on 960918,RHR Pump Suction Relief Valve Setpoint Was Not IAW Ts.Caused by Insufficient Configuration Control within Design Control Program.Ts Change Was Implemented on 970710 That Revised Setpoint Value + (ML20197H470)
- ML20197H471 + (ML20197H471)
- 05000219/LER-1990-014, :on 901008,flow Biased APRM Scram & Rod Block Setpoints Found Higher than Tech Spec Limits + (ML20197H472)
- ML20197H473 + (ML20197H473)
- 05000414/LER-1990-013-03, :on 901007,main Feedwater Pump Tripped Due to Equipment Failure + (ML20197H474)
- ML20197H475 + (ML20197H475)
- ML20197H479 + (ML20197H479)
- ML20197H480 + (ML20197H480)
- IR 05000289/1986007 + (ML20197H481)
- 05000336/LER-1990-016-02, :on 901009,inadvertent ESAS Actuation Occurred in Violation of Tech Specs + (ML20197H482)
- ML20197H483 + (ML20197H483)
- ML20197H484 + (ML20197H484)
- PY-CEI-NRR-1257, Forwards LERs 90-029 & 90-030 + (ML20197H486)
- ML20197H488 + (ML20197H488)
- ML20197H489 + (ML20197H489)
- PY-CEI-NRR-2342, Supplements 980903 LAR Submitted by Pnpp,Which Request Extension of EDG TS Action Completion Time to 14 Days for Div 1 of 2 EDG & Allowance to Perform EDG 24 H TS SR Test in Modes 1 & 2.PSA Model Certification for Pnpp,Encl + (ML20197H490)
- ML20197H493 + (ML20197H493)
- RBG-44740, Forwards Original & Three Copies of Rev 13 to RBS Security Training & Qualification Plan,Per 10CFR50.54(p)(2).Util Has Determined That Changes Do Not Decrease Effectiveness of Security Plan + (ML20197H494)
- ML20197H499 + (ML20197H499)
- ML20197H500 + (ML20197H500)
- 05000440/LER-1990-030, :on 901011,failure to Perform Required Surveillance Prior to Resuming Fuel Movement Discovered + (ML20197H501)
- ML20197H505 + (ML20197H505)
- ML20197H506 + (ML20197H506)