ML20197H480
| ML20197H480 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 12/04/1998 |
| From: | Alexander J BOSTON EDISON CO. |
| To: | Miller H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| BECO-2.98.156, NUDOCS 9812140115 | |
| Download: ML20197H480 (1) | |
Text
.
g O
====sw
=
Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360-5599 J.F. Alexander December 4, 1998 Nuclear Asses'sment Group Manager BECo Ltr.2.98.156 Mr. Hubert J. Miller l
Regional Administrator, Region I U.S. Nuclear Regulatory Commission
)
475 Allendale Road King of Prussia, PA 19406 j
Docket No. 50-293 License No.DPR-35
Subject:
NOTIFICATION OF CHANGE IN OPERATOR OR SENIOR OPERATOR STATUS
Dear Mr. Miller:
Pursuant to 10 CFR 50.74, this letter informs you of a change in status of one Boston Edison Company licensed operator. Mr. Paul E. Mastrangelo, NRC License No. SOP 2004-8, Docket No. 55-4124, effective January 1,1999, will be permanently reassigned to a non-licensed position within Boston Edison Company and will no longer participate in our licensed operator requalification training program. His license will not be renewed.
J If further information is required concerning this notification, please do not hesitate to contact Mr. Bob Cannon at (805) 830-8321.
nd.
RLC/bjt 298150 cc:
Mr. Richard J. Conte, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety, NRC Region i 475 Allendale Road King of Prussia, PA 19406 16 h
4
Sr. NRC Resident inspector U.S. Nuclear Regulator Commission Att: Document Control Desk
. Washington, DC 20555 9812140115 991204 I
PDR ADOCK 05000293 P
V PDR il