Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000289/LER-1997-007, :on 970621,generator Output Breaker Failed Resulting in Loss of Offsite Power & Rt.Caused by Failure of Generator Breaker GB-102.Both Failed Breakers Were Replaced + (ML20196H707)
- ML20196H708 + (ML20196H708)
- ML20196H709 + (ML20196H709)
- ML20196H710 + (ML20196H710)
- ML20196H711 + (ML20196H711)
- ML20196H712 + (ML20196H712)
- U-602785, Provides Suppl to Which Provided 120-day Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During DBA Conditions. Util Intends to Modify Penetrations During Next Refueling Outage + (ML20196H713)
- ML20196H714 + (ML20196H714)
- ML20196H715 + (ML20196H715)
- ML20196H717 + (ML20196H717)
- IR 05000285/1988009 + (ML20196H719)
- ML20196H721 + (ML20196H721)
- ML20196H722 + (ML20196H722)
- ML20196H724 + (ML20196H724)
- ML20196H726 + (ML20196H726)
- ML20196H728 + (ML20196H728)
- U-602789, Provides Response to NRC Request for Addl Info Re Thermo-Lag Related Ampacity Derating Issues for GL 92-08, Thermo-Lag 330-1 Fire Barriers. Current Ampacity Analysis Has Adequately Demonstrated Acceptable Cable Loading at Plant + (ML20196H729)
- ML20196H731 + (ML20196H731)
- IR 05000498/1988014 + (ML20196H732)
- ML20196H734 + (ML20196H734)
- ML20196H735 + (ML20196H735)
- ML20196H736 + (ML20196H736)
- ML20196H737 + (ML20196H737)
- ML20196H738 + (ML20196H738)
- ML20196H742 + (ML20196H742)
- ML20196H744 + (ML20196H744)
- ML20196H746 + (ML20196H746)
- ML20196H747 + (ML20196H747)
- ML20196H748 + (ML20196H748)
- B16619, Responds to NRC Re Violations Noted in Insp Repts 50-245/97-02,50-336/97-02 & 50-423/97-02,respectively. Corrective Actions:Inititated Use of Condition Rept Sys to Document Adverse Conditions in Dosimetry Compliance + (ML20196H750)
- ML20196H751 + (ML20196H751)
- B16600, Documents Description of Core Spray Sys Test Performed W/O Necessary 10CFR50.59 Evaluations.List of Corrective Actions Taken to Ensure Similar Events Do Not Recur,Provided + (ML20196H754)
- ML20196H755 + (ML20196H755)
- IR 05000219/1984031 + (ML20196H757)
- ML20196H759 + (ML20196H759)
- ML20196H760 + (ML20196H760)
- 3F0797-34, Confirms Util Schedule for Completing CR-3 Thermo-Lag Resolution Program & to Address Open Requests for Exemptions Needed in Support of Licensee Schedule.Subj Program Will Be Completed on or Before 001229 + (ML20196H762)
- ML20196H763 + (ML20196H763)
- ML20196H764 + (ML20196H764)
- ML20196H768 + (ML20196H768)
- ML20196H769 + (ML20196H769)
- ML20196H770 + (ML20196H770)
- JPN-99-020, Submits Response to RAI Re ISI Program Relief Requests for Second 10-yr Interval Closeout & Summary Rept,Per 990426 Telcon with Nrc.Info Provided to Clarify or Withdraw Individual Relief Requests Contained in Summary Rept + (ML20196H771)
- ML20196H772 + (ML20196H772)
- ML20196H776 + (ML20196H776)
- ML20196H777 + (ML20196H777)
- ML20196H783 + (ML20196H783)
- ML20196H786 + (ML20196H786)
- ML20196H788 + (ML20196H788)
- ML20196H794 + (ML20196H794)
- ML20196H795 + (ML20196H795)