Forwards Insp Rept 50-285/88-09 on 880222-26.Violations Noted.Enforcement Conference Scheduled for 880315 to Discuss Understanding of Violation,Reason for Occurrence & Corrective Actions
ML20196H715
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/08/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20196H718 List:
References
EA-88-082, EA-88-82, NUDOCS 8803140033
Download: ML20196H715 (2)


See also: IR 05000285/1988009

Text

.

--

i

,

.-

  • .

.

'I

'

-

.

.

i

.

In Reply Refer To:

8M

Docket:

50-285/88-09

t

'

EA 88-82

Omaha Public Power District

i

ATTN:

R. L. Andrews, Division Manager-

j

2

Nuclear Production

j

1623 Harney Street

Omaha, Nebraska 68102

-

,

]

Gentlemen:

This refers to the inspection conducted by Mr. R. P. Mullikin of this office-

.

,

during the period February 22-26, 1988, of activities authorized by NRC

Operating License DRP-40 for the Fort Calhoun Station, and to the discussion of

our findings with Mr. L. T. Kusek and other members of your staf f. at the

conclusion of the inspection,

j

,

l

The area inspected was penetration fire ~ barriers. Within this area, the

!

inspection consisted of selective examination of procedures and representative-

!

i

records, interviews with personnel, and observations by the NRC inspector.

The-

.

inspection findings are documented in the enclosed inspection report.

<

l

During this inspection, it was found that certain of your activities were in

violation of HRC requirements.

As discussed in the telephone conversation

i

,

between Mr. Westerman with Mr. Andrews of your staff, we have scheduled an

enforcement conference in our office at 9 a.m. on March 15, 1988, to discuss

j

your understanding of this apparent violation, the reasons for occurrence, and

!

your corrective actions. We will also discuss the enforcement policy, if

'

appropriate.

An agenda for this meeting is enclosed.

l

j

'

Should you have any questions concerning this inspection, we will be pleased to

!

'

]

discuss them with you.

l

Sincerely,

(

7

Cr! pal Sbxd Bf:

l

L. J. CALLAN

.

i

I

L. J. Callan, Director

!

Division of Reactor Projects

!

!

.

Enclosures:

i

1.

Appendix A - NRC Inspection Report

t

)

50-285/88-09

l

2.

Appendix B - Meeting Agenda

l

J

t

j

cc w/ enclosures:

(see next page)

i

b

t

ce^I

l

j

DR /B

DRP/B "

E0 df

D:DRP D

i

RPMullikin/cz

TFWesterman

DAPowers

LJCallan

i

4

l

7 / ;/88

S /7/88

3 /7 /88

3 / 7 /88

l

!

jgol

\\

j:!

8803140033 880308

t

PDR ADOCK 05000285 h

k

i

O

DCD

\\

,

'

l

l

-

.

q

-

.

,

,

.

Omaha Public Power District

-2-

cc w/ enclosures:

Fort Calhoun Station

ATTN:

W. G. Gates, Manager

P.O. Box 399

Fort Calhoun, Nebraska 68023

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, D. C.

20036

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bcc to DMB (IE01)

bec distrib. by RIV:

R.D. Martin, RA

  • RPSB-DRSS
  • Section Chief (DRP/B)
  • MIS System
  • RIV File
  • DRP
  • RSTS Operator
  • Project Engineer, DRP/B

Lisa Shea, RM/ALF

  • T. Bournia, NRR Project Manager
  • R. Hall
  • DRS
  • TSS
  • RRI

D. Powers

H. scott

J. Lieberman , OE

,

1

,

^