ML20196H726

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-498/88-14 & 50-499/88-14 on 880216-19.No Violations or Deviations Noted
ML20196H726
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/08/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20196H730 List:
References
NUDOCS 8803140041
Download: ML20196H726 (2)


See also: IR 05000498/1988014

Text

. . . .. . . _ ,

'

.

.. .

WsR - 81988

4

Iri Reply Refer To:

Dockets: 50-498/88-14

50-499/80-14

.

liouston Lighting & Power Company

' ATTN: J. H. Goldberg, Group Vice

President, Nuclear

P.O. Box 1700

Houston, Texas 7/001

Gentlemen:

This refers to the inspection conducted by Messrs. A. R. Johnson and

i T. O. McKernon during the period February 16-19, 1988, of activities authorized

by NRC Operating License NPF-71 and Construction Permit CPPR-129 for the

i South Texas Project. Units 1 and 2, and to the discussien of the findings with-

Mr. J. T. Westermeier and other members of your staff on February 19, 1988.

,

Areas examined during the inspection included a review of preoperational program

1 procedures for Unit 2. Within these areas, the inspection consisted of

j selective examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspectors. The inspection findings are

! documented in the enclosed inspection report.

4

Within the scope of the inspection, no violations or deviations were identified.

)

>

Should you have any questions concerning this inspection, we will be pleased to

j discuss them with you.

.

1 Sincerely,

! Signed By

I

J. Callan

'

L. J. Callan, Director

Division of Reactor Projects

Enclosure:

! Appendix - NRC Inspection Report

50-498/88-14

! 50-499/88-14

cc w/ enclosure:

i Houston Lighting & Power Company -

1 ATTN: M. Wisenberg, Manager 8803140041 880308

I Nuclear Licensing- PDR ADOCK 05000498

o DCD

P.O. Box 1700

Houston, Texas 77001

RIV:RI *RI [fF *C:TPS *D:DRS C:PS

'

pARJohn/ son:cs TOMcKe non/tw WCSeidle JLMilhoan GLConstable

7/1/88

3 / 1 /88 3/-f/88 3 /1 /88  ;/7/88

i D:DR Reconcur

i LJCallan WCSeidle *previously concurred ,\

g h /88 / /88

.

< .

s.

(

Houston Lighting & Power Company -2-

Houston Lighting & Power Corrpany

ATTN: Gerald E. Vaughn, Vice President

Nuclear Operations

P.O. Box 1700

Houston, Texas 77001

Houston Lighting & Power Company

ATTN: S. L. Rosen

P.O. Box 289

Houston, Texas 77483

Central Power & Light Company

ATTN: R. L. Range /R. P. Verret

P.O. Box 2121

Corpus Christi, Texas 78403

City Public Service Board

ATTN: R. J. Costello/M. T. Hardt

P.O. Box 1771

San Antnnio, Texas 78296

City of Austin Elec. Utility

ATTN: R. J. Miner, Chief Operating

Officer

721 Barton Springs Road

Austin, Texas 78704

Texas Radiation Control Program Director

bec to DMB (IE01)

bec distrib, by RIV:

  • DRP *RRI-0PS

R. D. Martin, RA *RRI-CONST.

*SectionChief(DRP/D) *RPSB-DRSS
  • MIS System *RIV File

Lisa Shea, RM/ALF *RSTS Operator

R. Bachmann, OGC *H. Bundy

  • P. Kadambi, NRR Project Manager *R. Taylor
  • TSS *R. Hall
  • DRS 0. Powers
  • T. McKernon *A. Johnson "
  • W. C. Seidle
  • w/766