Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196H118 + (ML20196H118)
- TXX-4766, Responds to Observations & Concerns Noted in Insp Repts 50-445/85-12 & 50-446/85-08.SAFETEAM Designed as Mgt Tool to Concerns Expressed by Project Employees + (ML20196H122)
- ML20196H123 + (ML20196H123)
- ML20196H125 + (ML20196H125)
- NOC-AE-000571, Forwards Final Operating Exam Matls for STP Exam Scheduled for 990705.Revised Operating Exam Outline & post-validation Change Summary Has Been Included.Without Encls + (ML20196H126)
- RBG-44734, Forwards Final Requests for Relief from ASME Code,Section XI Re ISI Requirements for First ten-year Insp Interval.Revs Reflect Actual Percentages of Coverage Based on Completion of Exams + (ML20196H127)
- ML20196H129 + (ML20196H129)
- ML20196H130 + (ML20196H130)
- ML20196H135 + (ML20196H135)
- ML20196H138 + (ML20196H138)
- ML20196H139 + (ML20196H139)
- ML20196H140 + (ML20196H140)
- ML20196H141 + (ML20196H141)
- ML20196H144 + (ML20196H144)
- TXX-8825, Interim Deficiency Rept CP-86-41 Re Small Break LOCA Mode 4 Operation.Initially Reported on 860528.Westinghouse Owners Group Using PRA Method & Will Be Defining Operator Response Time for Accident.Next Report Will Be Submitted by 880812 + (ML20196H146)
- ML20196H147 + (ML20196H147)
- ML20196H148 + (ML20196H148)
- ML20196H151 + (ML20196H151)
- ML20196H154 + (ML20196H154)
- ML20196H155 + (ML20196H155)
- ML20196H156 + (ML20196H156)
- ML20196H159 + (ML20196H159)
- ML20196H160 + (ML20196H160)
- ML20196H162 + (ML20196H162)
- ML20196H163 + (ML20196H163)
- ML20196H166 + (ML20196H166)
- ML20196H168 + (ML20196H168)
- ML20196H169 + (ML20196H169)
- U-602787, Describes Schedule for Refurbishment of W Circuit Breakers as Committed in + (ML20196H172)
- ML20196H177 + (ML20196H177)
- ML20196H179 + (ML20196H179)
- ML20196H181 + (ML20196H181)
- ML20196H182 + (ML20196H182)
- IR 05000369/1999010 + (ML20196H184)
- ML20196H185 + (ML20196H185)
- ML20196H187 + (ML20196H187)
- ML20196H188 + (ML20196H188)
- ML20196H191 + (ML20196H191)
- SVP-99-122, Forwards Regulatory Commitment Change Summary Rept, Containing Summary Info from 980601 Through 990601 + (ML20196H197)
- ML20196H198 + (ML20196H198)
- ML20196H201 + (ML20196H201)
- PNO-I-88-024A, urine Analyses Taken on 880301-04 Revealed High Levels of P-32 in Female Graduate Student.Contrary to Earlier Info,Student Denied Using P-32 While Working in Lab. Responsible Investigator Labs All Shut Down as of 880304 + (ML20196H204)
- ML20196H205 + (ML20196H205)
- ML20196H207 + (ML20196H207)
- ML20196H209 + (ML20196H209)
- ML20196H211 + (ML20196H211)
- ML20196H213 + (ML20196H213)
- B16644, Forwards Revised NRC Forms 396, Certification of Medical Exam by Facility Licensee, for Five Licensed Operators Now Requiring Corrective Lenses for Performing watch-standing Duties.W/O Encl + (ML20196H219)
- IR 05000254/1988012 + (ML20196H220)
- B16482, Requests Deviation from NUREG-0737,Item II.F.6, Containment Hydrogen Monitor, for Mnps,Unit 2.Plant Considers That 30 Minute Requirement Is Overly Restrictive Time Frame in EOPs to Start Hydrogen Monitors + (ML20196H222)
- 05000245/LER-1997-013, :on 970217,discovered That Weight of Lower Mast Sections of Refueling Platform Fuel Grapple Were Not Added to Fuel Assembly Weight.Caused by Failure to Maintain Design Basis.Performed New Impact Load Analysis.With + (ML20196H223)