Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-99-102, Forwards Typed,Final TS Pages for LARs 259 & 131.Summary of Description of Plant Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages,Encl + (ML20196G380)
- ML20196G381 + (ML20196G381)
- ML20196G383 + (ML20196G383)
- ML20196G386 + (ML20196G386)
- ML20196G387 + (ML20196G387)
- ML20196G389 + (ML20196G389)
- ML20196G391 + (ML20196G391)
- ML20196G392 + (ML20196G392)
- ML20196G393 + (ML20196G393)
- ML20196G394 + (ML20196G394)
- ML20196G396 + (ML20196G396)
- ML20196G397 + (ML20196G397)
- ML20196G400 + (ML20196G400)
- ML20196G401 + (ML20196G401)
- ML20196G402 + (ML20196G402)
- ML20196G404 + (ML20196G404)
- ML20196G405 + (ML20196G405)
- IR 05000313/1998008 + (ML20196G407)
- ML20196G413 + (ML20196G413)
- LD-99-035, Part 21 Rept Re ABB 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed + (ML20196G414)
- ML20196G415 + (ML20196G415)
- NUREG-1338, Responds to Ltr to Wd Travers, Re Small,Modular, pebble-bed Reactor Design.Some Background Info & Guidance on Licensing gas-cooled Reactor Designs Can Be Found in NRC Staff repts;NUREG-1226,NUREG-1338 & NUREG-1512 + (ML20196G416)
- ML20196G418 + (ML20196G418)
- ML20196G419 + (ML20196G419)
- ML20196G424 + (ML20196G424)
- ML20196G425 + (ML20196G425)
- RBG-27510, Forwards Semiannual Radioactive Effluent Release Rept,Jul- Dec 1987. Gaseous Pathway Dose Calculation Methodology Currently Being Evaluated + (ML20196G428)
- ML20196G430 + (ML20196G430)
- ML20196G432 + (ML20196G432)
- ML20196G433 + (ML20196G433)
- 05000456/LER-1988-005-01, :on 880204,diesel Generator 1A Start on Safety Injection Signal Instead of Undervoltage Signal.Caused by Miscommunication Between Operators.Generator Secured & Operators Counseled + (ML20196G434)
- 05000382/LER-1999-005, Forwards LER 99-005-00,providing Details of Discovery of Untested Electrical Contacts in safety-related Logic Circuits + (ML20196G435)
- ML20196G436 + (ML20196G436)
- ML20196G439 + (ML20196G439)
- ML20196G440 + (ML20196G440)
- ML20196G444 + (ML20196G444)
- ML20196G447 + (ML20196G447)
- ML20196G452 + (ML20196G452)
- ML20196G453 + (ML20196G453)
- NG-99-0880, Informs That Util Commits to Repeating Newly Established Sequence of Component Exams During Successive Insp Intervals for NDE-R035,in Response to NRC Re Inservice Insp Relief Requests + (ML20196G459)
- ML20196G460 + (ML20196G460)
- ML20196G461 + (ML20196G461)
- ML20196G462 + (ML20196G462)
- ML20196G463 + (ML20196G463)
- ML20196G466 + (ML20196G466)
- 05000293/LER-1988-005, :on 880202,automatic Actuation of Portions of Primary Containment & Reactor Bldg Isolation Control Sys (Pcis/Rbis) Occurred.Caused by Pcis/Rbis Logic Relay Coil Failure.Logic Relay Coil Replaced + (ML20196G467)
- 05000336/LER-1988-005-01, :on 880204,loss of Normal Power Occurred on Facility 1 Vital 4160 Volt Electrical Bus.Caused by Operator Error.Facility 1 Reactor Bldg Closed Cooling Water,Svc Water & Low Pressure Safety Injection Pumps Started + (ML20196G469)
- ML20196G470 + (ML20196G470)
- ML20196G473 + (ML20196G473)
- ML20196G475 + (ML20196G475)
- 05000382/LER-1999-005-01, :on 980702,determined That Four Contacts in Control Circuits of EFW Control Valves Were Untested.Caused by Personnel Error.Untested Contacts Have Been Tested + (ML20196G477)