ML20196G392
| ML20196G392 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 11/19/1998 |
| From: | Marschall C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Hutchinson C ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20196G398 | List: |
| References | |
| 50-313-98-08, 50-313-98-8, 50-368-98-08, 50-368-98-8, NUDOCS 9812070327 | |
| Download: ML20196G392 (5) | |
See also: IR 05000313/1998008
Text
' . '
.
..
.
'i'.,,
UNITED ST ATES
a'
s
[
.gi
NUCLEAR REGULATORY COMMISSION
J
(g
j
REGION IV
-
~
611 RYAN PLAZA DRIVE. SUITE 400
% . . . . . ./
AR LINGTON, T EXAS 76011 8064
NOV I 91998
' C.' Randy Hutchinson, Vice President
Operations
Arkansas Nuclear One
Entergy Operations, Inc.
1448 S.R. 333
Russellville, Arkansas 72801-0967
SUBJECT: NRC INSPECTION REPORT 50-313/98-08; 50-368/98-08 AND NOTICE OF
VIOLATION
Dear Mr. Hutchinson:
From September 13 through Cdober 24,1998, a routine inspection was conducted at your
Arkansas Nuci'sar One, Units 1 and 2, reactor facility. The enclosed report presents the scope
.
and results oi that inspection.
During the 6-week period covered by this inspection, your conduct of activities at the Arkansas
Nuclear One facility was generally characterized by safety-conscious operations, sound
engineering and maintenance practices, and appropriate radiological controls. One violation of
NRC requirements was identified. The violation resulted from failure to incorporate appropriate
requirements and acceptance limits as specified by applicable design documents to
demonstrate that Diesel Engine Fire Pump P-6B would perform satisfactorily while in service.
The NRC has concluded that information regarding the reason for the violation, including the
corrective actions taken and planned to correct the violation and prevent recurrence, is already
adequately addressed on the docket in the enclosed inspection report. Therefore, you are not
required to respond to this letter unless the description therein does not accurately reflect your
corrective actions or your position. In that case, or if you choose to provide additional
information, you should follow the instructions specified in the enciosed Notice.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room (PDR).
I
'
9812070327 981119
ADOCK 05000313
G
,
-
_
7
-
.
.
Entergy Operations, Inc.
-2-
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
E
.
J
l
'
'
Charles S. Marschall, Chief
Project Branch C
Division of Reactor Projects
Docket Nos.: 50-313
50-368
License Nos.: DPR-51
NPF-6
Enclosures:
1.
2.
NRC Inspection Roport
50-313/98-08;50-368/98-08
cc w/ enclosures:
Executive Vice President
& Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286
Manager, Washington Nuclear Operationc
ABB Combustion Engineering Nuclear
Power
12300 Twinbrook Parkway, Suite 330
Rockville, Maryland 20852
County Judge of Pope County
Pope County Courthouse
Russellville, Arkansas 72801
Winston & Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3502
.,
~
.=
. , _
.,
l
l
!
Entergy Operations, Inc.
-3-
David D. Sn'ellings, Jr., Director
- Division of Radiation Control and
,
.
Emergency Management
!
i
4815 West Markham Street, Mail Slot 30
Little Rock,' Arkansas 72205-3867
!
i
Manager
Rockville Nuclear Licensing
l
Framatome Technologies.
i
1700 Rockville Pike, Suite 525
i
Rockville, Maryland 20852
i
!
l
l
,
,
i
1
_ _
.
- __
_
. _ - -
.,
.-I
.
.
.-
.
..
.
.
. . -
'
'
.
.
.
.
<
!
Entergy Operations, Inc.
-4-
!
,
t
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
j
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
MIS System
Branch Chief (DRP/C)
RIV File
Project Engineer (DRP/C)
DRS-PSB
Branch Chief (DRP/TSS)
,
!
'
,
i
l
i
i
%
3
DOCUMENT NAME: R:\\_ANO\\AN808RP.KMK '
To receive copy of document, Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy
RIV:RI
RIV:RI
l
RI'/:RI
/
RIV: SRI
kA DRS
l
JDHanna*
KDWeaver*
SCBurtorf /
KMKennedy *'
PCGage*M*JA A1
p
11/2/98
11/2/98
11/2/98 M
11/2/98
11/
/98 '
PE:DRP/C
C:DRP/C &
,C:DRS%SB /.,
C:DRS/MSB
,
JFMelfi (tWi%9
CSMarscibTh43Murray /W DAPowers?
j
,
11/ 6/98 w<htm
11/\\3 /98
/
11//9/98 "
11/ /98
- previously concurred
OFFICIAL RECORD COPY
4
._-
.- .
..
._
.. - . . . ~ - - ~ . _ - -
. . - . . .
. .
. . ~ .
.
..
I-
.
-
o
o
,
4
' )
, - 1
,
l
Entergy Operations, Inc.
-4-
i
i
E-Mail report to T. Frye (TJF)
!
4
E-Mail report to D. Lange (DJL)
j
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
,
'
E Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
!
bec distrib. by RIV:
Regional Administrator
Resident inspector
1
DRP Director
MIS System
l
Branch Chief (DRP/C)
RIV File
r
Project Engineer (DRP/C)
DRS-PSB
Branch Chief (DRP/TSS)
<
,
I
l
i
l
l
l
l
I
I
i
<m
n,n(1O
~+a.
.
DOCUMENT NAME: R:\\_ANO\\AN808RP.KMK
To receive copy of document. Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures *N* = No copy
RIV:RI
RIV:RI
l
RIV:RI
RIV: SRI
lM DRS
l
JDHanna*
KDWeaver*
SCBurtorf
KMKennedy *
PCGage*45a W
t.
11/2/98
11/2/98
11/2/98 M
11/2/98
11/
/98 '
,C:DRSM)SB /.,
C:DRS/MSB
.
PE:DRP/C
C:DRP/C ;Ln,
JFMelfi t?.' 0'1
CSMarschaflJaDMurray 7M DAPowers*
'
11/ G /98 ..96
11/'6 /98
/
11//9/98
11/ /98
V
- previously concurred
OFFICIAL RECORD COPY