Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000213/LER-1997-010, :on 970410,SFP Cooling Pump Net Positive Suction Head Was Declared Inadequate.Caused by Deficiency in Original (Pre 1975) Design Basis.Confirmed That Existing Design Is Adequate + (ML20196G219)
- ML20196G221 + (ML20196G221)
- PNO-III-97-044, on 970505,underdosage in Ir-192 Treatment Occurred,During Treatment W/High Dose Rate After Loader. Licensee Notified Patient Referring Physician,Who Plans to Notify Patient of Underdose Administered During Treatment + (ML20196G223)
- ML20196G224 + (ML20196G224)
- ML20196G225 + (ML20196G225)
- NUREG-1609, Responds to Util 950627,960102 & 0216 Responses to GL 95-03 Re Circumferential Cracking of SG Tubes.Responses Acceptable + (ML20196G226)
- ML20196G227 + (ML20196G227)
- ML20196G228 + (ML20196G228)
- ML20196G229 + (ML20196G229)
- ML20196G231 + (ML20196G231)
- ML20196G232 + (ML20196G232)
- ML20196G233 + (ML20196G233)
- LIC-98-0139, Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59,description of Revs to USAR Other than Those Resulting from 10CFR50.59 Changes,Regulatory Commitment Changes & USAR Revs Covering Period of 980301-1031 + (ML20196G236)
- PNO-IV-97-027, on 970512,notified NRC Operations Ctr of Loss of Two 8 Uci Am-241 Static Eliminator Sources Contained in Lantrin Pod Targeting Device in Vaughn,Nm.Air Force Continuing Investigation of Event + (ML20196G237)
- ML20196G238 + (ML20196G238)
- ML20196G239 + (ML20196G239)
- 05000369/LER-1996-005-01, :on 961101,TS Required Shutdown of Both Units Due to Failed Surveillance Test of Vital Battery Evcc.Caused Is Unknown.Replaced & Retested Vital Battery Bank Evcc + (ML20196G240)
- ML20196G241 + (ML20196G241)
- ML20196G243 + (ML20196G243)
- ML20196G244 + (ML20196G244)
- ML20196G248 + (ML20196G248)
- PNO-IV-97-023B, on 970507,update to Nonradiation Worker Exposure in Agreement State Made.La Dept of Environ Quality Completing Investigation of Event & Plans to Publish Insp Rept When Review Complete.State of La Notified + (ML20196G250)
- ML20196G251 + (ML20196G251)
- ML20196G254 + (ML20196G254)
- ML20196G258 + (ML20196G258)
- ML20196G259 + (ML20196G259)
- ML20196G260 + (ML20196G260)
- ML20196G261 + (ML20196G261)
- ML20196G262 + (ML20196G262)
- ML20196G265 + (ML20196G265)
- 05000395/LER-1988-001, :on 880204,three Perimeter Cameras Lost Due to Circuit Breaker Trip.Caused by Electricians Crimping Electrical Lead While Replacing Distribution Panel Cover. Security Procedures Implemented + (ML20196G267)
- B16447, Application for Amend to License NPF-49,revising Shutdown Margin Requirements & Shutdown Margin Monitor Operability for Modes 3,4 & 5 + (ML20196G269)
- 05000424/LER-1988-003-01, :on 880201,feedwater Isolation Actuation Occurred Due to hi-hi Level in Steam Generator 1.Caused by Operator Opening Main Feedwater Isolation Valve W/Condensate & Feedwater Sys in Long Cycle Lineup + (ML20196G271)
- ML20196G275 + (ML20196G275)
- NUREG/CR-4991, Notification of CRGR Meeting 130 on 880309 to Review Proposed Draft Resolution for USI A-40 Seismic Design, & Discuss NUREG/CR-4991 Evaluation & Proposed Improvements to Effectiveness of NRC Generic Communications + (ML20196G276)
- ML20196G277 + (ML20196G277)
- IR 05000309/1998004 + (ML20196G281)
- ML20196G283 + (ML20196G283)
- ML20196G284 + (ML20196G284)
- ML20196G285 + (ML20196G285)
- IR 05000285/1988010 + (ML20196G287)
- ML20196G288 + (ML20196G288)
- LIC-97-0077, Forwards Revised REP Index,Rev 9 to REP Section 9 & EPIP Index Pp 1 & 2,rev 27 to EPIP-OSC-1 & Rev 2 to EPIP-EOF-21, IAW 10CFR50,App E,Part V & 10CFR50.4(b)(5)(iii) + (ML20196G289)
- ML20196G292 + (ML20196G292)
- IR 05000317/1998009 + (ML20196G295)
- ML20196G298 + (ML20196G298)
- ML20196G299 + (ML20196G299)
- ML20196G300 + (ML20196G300)
- PNO-V-88-017, on 880301,util Certified That All Prerequisites for non-nuclear Heatup of Plant to Normal Operating Test Temp & Pressure Completed.Reactor Criticality Scheduled for 880320 + (ML20196G303)
- ML20196G304 + (ML20196G304)
- ML20196G310 + (ML20196G310)