Forwards Summary of Beaver Valley Unit 2 IST Program Changes Which Have Been Incorporated in Rev 16.Determination That Rev 16 IST Program Changes Do Not Require NRC Approval Prior to Implementation,Listed
ML20196G299
Person / Time
Site: Beaver Valley
Issue date: 04/30/1997
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20196G306 List:
References
GL-89-04, GL-89-4, NUDOCS 9705160031
Download: ML20196G299 (2)


Text

.

O ee ver Valley Power Station Shippingport. PA 15077 0004

'; k ? ~

V SUSHIL C.c%IN (412) 393 5512 DMalon Vice President Fax (412) 643-8069 Nuclear Services Nuclear Power Division April 30, 1997 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 i

Subject:

Beaver Valley Power Station, Unit No. 2 Dockv No. 50-412, License No. NPF-73 Updated Inservice Testing Program, Issue 1, Revision 16 The purpose of this submittal is to provide the Nuclear Regulatory Commission 1

(NRC) with an infonnational copy of revisions to the Beaver Valley Power Station Unit

(]

2 (BVPS-2) Inservice Testing (IST) Program. provides a summary of the IST program changes which have been incorporated into Revision 16.

! is issue 1, Revision 16 of the BVPS-2 IST Program It has been determined that the Revision 16 IST program changes do not require NRC ap to implementation. This detennination was made because all of the changes as e either:

editorial in nature, or

[/f in compliance with the 1983 Edition through Summer 1983 Addenda of the ASME Boiler and Pressure Vessel Code,Section XI, or compliance with the positions delineated in Attachment 1 or Supplement I of Generic Letter No. 89-04, " Guidance on Developing Acceptable Inservice Testing Programs."

9705160031 970430 PDR ADOCK 05000412 P

PDR

{7 DEllVERING ll.ll l.li' l.li, I.lllll, il.lil.li ll nnin

. _. - _. _ _ -. _ _.. ~. - _ _ _ _ _. - _..

. ~ - - _. _ -

f L

. Beaver Valley Power Station, Unit No. 2

)

Updated Inservice Testing Program, Issue 1, Revision 16 I

Page 2 i

l If you have any questions regarding this submittal, please contact Mr. J. Arias, j

Director, Safety & Licensing at (412) 393-5203.

I r

Sincerely, l

Sushil C. Jain l

c:

Mr. D. M. Kern, Sr. Resident Inspector Mr.11. J. Miller, NRC Region 1 Administrator Mr. D. S. Brinkman, Sr. Project Manager i