Text
D
(
\\
\\
c NOTE. T0:
D. Ziemann, Group Leader, Systematic Evaluation Prvjram FRO:l:
L. C. Shao. Chief. Engineering Branch, DDR 59BJECT : FMP0h'ER REQUIREMEliTS FOR SEP 1
Per your request, w nave reevaluated and sharply reduced the (nanpower requirement- 'or the SEP. The Engineering Branch's professional man years to sw irt the SEP have been r avised as shown below:
FY 76 FY 73 FY 30 FY 01 Total f
Excluding Seismic and Technical Activities 1
2
'2 2
7 7
4 20 Seis.:iic 3
c 4
8 9
6 27 Total This revisien of our previous nan-powr estimates for the SEP is based j
on a lessar scope of erk including deletion cf some parts of the original schedule for the EB program and an anticipated extension of the revict:
eleven older f acilities. It also does not include nan-power icr 1.1pi:;-
mentation of Technical Activites programs. This is included in our I
esticiate for those programs.
we strongly recoc.m nd that Since the above progra;os are plant spect 4,
the seismic portion of the SEP be accomplisheu Ly P.: personnel rather than by subletting portions (or possibly all of it) to outside contractors.
the program and avoid potential probicas.
This will allow better cuntrol cf L. C. Shao, Chief Engineering Branch c
Division of Operating Reactors l
CONNOR 87-054 PDR sc