Notifies That Manpower Requirements for SEP Sharply Reduced, Following Requested Review.Accomplishment of Seismic Portion of SEP by NRC Personnel,As Opposed to Outside Contractors, Strongly Recommended
ML20196G232
Person / Time
Issue date: 02/29/1988
From: Shao L
NRC
To: Ziemann D
NRC
Shared Package
ML20196F442 List:
References
FOIA-87-854 NUDOCS 8803070223
Download: ML20196G232 (1)


Text

. . ._

D

, ( -

\

\ l c

NOTE. T0:

D. Ziemann, Group Leader, Systematic Evaluation Prvjram FRO:l: L. C. Shao. Chief. Engineering Branch, DDR l

59BJECT : FMP0h'ER REQUIREMEliTS FOR SEP 1 Per your request, w nave reevaluated and sharply reduced the (nanpower requirement- 'or the SEP. The Engineering Branch's professional man

- years to sw irt the SEP have been r avised as shown below:

' FY 76 FY 73 FY 30 FY 01 Total f Excluding Seismic and '2 2 7 2 l

. Technical Activities 1 c 7 4 20 ,

3 Seis.:iic  !

8 9 6 27 4

Total j

This revisien of our previous nan-powr estimates for the SEP is based

' on a lessar scope of erk including deletion cf some parts of the original EB program and an anticipated extension of the revict: schedule for the l

eleven older f acilities. It also does not include nan-power icr 1.1pi:;- l mentation of Technical Activites programs. This is included in our I l

esticiate for those programs. l Since the above progra;os are plant spect 4 , we strongly recoc.m nd that the seismic portion of the SEP be accomplisheu Ly P.: personnel rather than by subletting portions (or possibly all of it) to outside contractors.

This will allow better cuntrol cf the program and avoid potential probicas.

l L. C. Shao, Chief -

, I c Engineering Branch l

< Division of Operating Reactors l

,_ l 8803070223 080229 PDR FOIA l sc CONNOR 87-054 PDR ,