ML20196G232
ML20196G232 | |
Person / Time | |
---|---|
Issue date: | 02/29/1988 |
From: | Shao L NRC |
To: | Ziemann D NRC |
Shared Package | |
ML20196F442 | List:
|
References | |
FOIA-87-854 NUDOCS 8803070223 | |
Download: ML20196G232 (1) | |
Text
. . ._
D
, ( -
\
\ l c
NOTE. T0:
D. Ziemann, Group Leader, Systematic Evaluation Prvjram FRO:l: L. C. Shao. Chief. Engineering Branch, DDR l
59BJECT : FMP0h'ER REQUIREMEliTS FOR SEP 1 Per your request, w nave reevaluated and sharply reduced the (nanpower requirement- 'or the SEP. The Engineering Branch's professional man
- years to sw irt the SEP have been r avised as shown below:
' FY 76 FY 73 FY 30 FY 01 Total f Excluding Seismic and '2 2 7 2 l
. Technical Activities 1 c 7 4 20 ,
3 Seis.:iic !
8 9 6 27 4
Total j
This revisien of our previous nan-powr estimates for the SEP is based
' on a lessar scope of erk including deletion cf some parts of the original EB program and an anticipated extension of the revict: schedule for the l
eleven older f acilities. It also does not include nan-power icr 1.1pi:;- l mentation of Technical Activites programs. This is included in our I l
esticiate for those programs. l Since the above progra;os are plant spect 4 , we strongly recoc.m nd that the seismic portion of the SEP be accomplisheu Ly P.: personnel rather than by subletting portions (or possibly all of it) to outside contractors.
This will allow better cuntrol cf the program and avoid potential probicas.
l L. C. Shao, Chief -
, I c Engineering Branch l
< Division of Operating Reactors l
,_ l 8803070223 080229 PDR FOIA l sc CONNOR 87-054 PDR ,
,A {[!
-. .