Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000498/LER-1988-057, :on 881004,during Maint Outage,Train a ESF Load Sequencer Actuated,Initiating Short Circuit Which Caused Cascading Failure & Malfunctions of Sequencer Components. Caused by Personnel Error.Module Replaced + (ML20195E515)
- ML20195E516 + (ML20195E516)
- ML20195E517 + (ML20195E517)
- ML20195E519 + (ML20195E519)
- NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With + (ML20195E521)
- ML20195E522 + (ML20195E522)
- ML20195E523 + (ML20195E523)
- ML20195E524 + (ML20195E524)
- ML20195E527 + (ML20195E527)
- ML20195E528 + (ML20195E528)
- ML20195E531 + (ML20195E531)
- ML20195E532 + (ML20195E532)
- ML20195E534 + (ML20195E534)
- AECM-86-0128, Withdraws Apr 1982 Commitment to Add Four motor-operated Valves to Msiv,Rhr & LPCS Instrument Lines,Deferred to Second Refueling Outage by Dec 1985 Request.Withdrawal Based on Results of Encl Engineering Analysis & Evaluation + (ML20195E535)
- ML20195E536 + (ML20195E536)
- ML20195E537 + (ML20195E537)
- 05000338/LER-1998-007-01, :on 981015,3B Casing Cooling Pump Failed to Develop Discharge Pressure & Recirculation.Caused by Air Binding.Subject Pump Was Vented of Air,Started & Tested Satisfactorily.With + (ML20195E539)
- ML20195E540 + (ML20195E540)
- ML20195E541 + (ML20195E541)
- ML20195E542 + (ML20195E542)
- ML20195E543 + (ML20195E543)
- ML20195E544 + (ML20195E544)
- ML20195E545 + (ML20195E545)
- ML20195E546 + (ML20195E546)
- ML20195E547 + (ML20195E547)
- ML20195E548 + (ML20195E548)
- ML20195E549 + (ML20195E549)
- ML20195E551 + (ML20195E551)
- ML20195E552 + (ML20195E552)
- ML20195E553 + (ML20195E553)
- 0CAN068601, Responds to Generic Ltr 86-04 & 860213 Request Re Plans Concerning Mods to Shift Technical Advisor Program in Light of Policy Statement on Engineering Expertise on Shift. Program Described + (ML20195E554)
- ML20195E556 + (ML20195E556)
- 05000285/LER-1988-023, :on 880928,3 of 10 MSIVs Failed to Lift in Violation of Tech Spec Operability Requirements.Valves Shipped to Independent Testing Lab for Testing & Possible Refurbishment + (ML20195E558)
- ML20195E561 + (ML20195E561)
- L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with + (ML20195E563)
- ML20195E564 + (ML20195E564)
- ML20195E569 + (ML20195E569)
- ML20195E570 + (ML20195E570)
- ML20195E573 + (ML20195E573)
- ML20195E574 + (ML20195E574)
- ML20195E576 + (ML20195E576)
- ML20195E577 + (ML20195E577)
- IR 05000259/1988004 + (ML20195E578)
- ML20195E581 + (ML20195E581)
- ML20195E583 + (ML20195E583)
- ML20195E584 + (ML20195E584)
- ML20195E585 + (ML20195E585)
- IR 05000334/1988025 + (ML20195E586)
- ML20195E588 + (ML20195E588)
- ML20195E590 + (ML20195E590)
- ML20195E591 + (ML20195E591)