Text
e t'Jaiter Nuclear Operations Detroit 7*
r.,-in Edison E?I9F'***
May 29, 1986 VP-86-0058 PRIORITY ROUTING k
$h gr-Mr. J. G. Keppler Regional Administration tmg/vI(Vj[
d5-1 U. S. Nuclear Regulatory Commission
- 4 rm qC Region III a
a PM 799 Roosevelt Road FIllbu*
Glen Ellyn, Illinois 60137
Dear Mr. Keppler:
Reference:
1)
Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43 2)
Detroit Edison Letter to NRC, " Revision of Emergency Diesel Generator Crankshaft Bearing Reliability Demonstration Test Program", VP-86-0025, dated March 18, 1906
Subject:
Clarification of EDG 13 Thrust Bearing Special Inspection In Reference 1, Enclosure 1,Section VIII.3, "Special Inspection of EDG 13 Thrust Bearing", Detroit Edison committed to perform a special visual inspection of this bearing at the next 18-month Technical Specification surveillance inspection.
At the time the commitment was made, the next 18-month Technical Specification surveillance inspection was scheduled to be performed during the first refueling outage.
It is still our intent to visually inspect the EDG 13 upper top half thrust bearing during the first refueling outage.
If you have any questions in this matter, please contact Mr. R. L. Woolley at (313) 586-4211.
Sincerely,