ML20195E522

From kanterella
Jump to navigation Jump to search
Confirms Util Intention to Visually Inspect Emergency Diesel Generator 13 Thrust Bearing During First Refueling Outage
ML20195E522
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/29/1986
From: Agosti F
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
VP-86-0058, VP-86-58, NUDOCS 8606090115
Download: ML20195E522 (1)


Text

e t'Jaiter Nuclear Operations Detroit 7*

r.,-in Edison E?I9F'***

May 29, 1986 VP-86-0058 PRIORITY ROUTING k

$h gr-Mr. J. G. Keppler Regional Administration tmg/vI(Vj[

d5-1 U. S. Nuclear Regulatory Commission

  1. 4 rm qC Region III a

a PM 799 Roosevelt Road FIllbu*

Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Reference:

1)

Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43 2)

Detroit Edison Letter to NRC, " Revision of Emergency Diesel Generator Crankshaft Bearing Reliability Demonstration Test Program", VP-86-0025, dated March 18, 1906

Subject:

Clarification of EDG 13 Thrust Bearing Special Inspection In Reference 1, Enclosure 1,Section VIII.3, "Special Inspection of EDG 13 Thrust Bearing", Detroit Edison committed to perform a special visual inspection of this bearing at the next 18-month Technical Specification surveillance inspection.

At the time the commitment was made, the next 18-month Technical Specification surveillance inspection was scheduled to be performed during the first refueling outage.

It is still our intent to visually inspect the EDG 13 upper top half thrust bearing during the first refueling outage.

If you have any questions in this matter, please contact Mr. R. L. Woolley at (313) 586-4211.

Sincerely,

<f cc:

Mr. M. D. Lynch Mr. W._G.

Rogers Mr. G. C. Wright USNRC Document Control Desk Washington, D.C.

20555 8606090115 860529 PDR ADOCK 05000341 G

PDR JUN 4 1986 g\\

Y\\\\9