Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195C154 + (ML20195C154)
- ML20195C157 + (ML20195C157)
- ML20195C158 + (ML20195C158)
- ML20195C159 + (ML20195C159)
- ML20195C160 + (ML20195C160)
- ML20195C161 + (ML20195C161)
- ML20195C162 + (ML20195C162)
- ML20195C163 + (ML20195C163)
- ML20195C164 + (ML20195C164)
- ML20195C165 + (ML20195C165)
- B12092, Forwards Addl Analysis of Loss of 120-volt Vital Ac Events Re Summary Rept on Probabilistic Safety Study Submitted in Jul 1985.Attachment 1 Provides Loss of Ac Criteria & Attechment 2 Thermal Hydraulic Bases Criteria.W/O Encl + (ML20195C166)
- ML20195C169 + (ML20195C169)
- ML20195C170 + (ML20195C170)
- ML20195C171 + (ML20195C171)
- ML20195C172 + (ML20195C172)
- IR 05000298/1986028 + (ML20195C173)
- ML20195C173 + (ML20195C173)
- ML20195C174 + (ML20195C174)
- ML20195C175 + (ML20195C175)
- ML20195C176 + (ML20195C176)
- ML20195C177 + (ML20195C177)
- ML20195C178 + (ML20195C178)
- ML20195C181 + (ML20195C181)
- ML20195C182 + (ML20195C182)
- 05000304/LER-1988-006-09, :on 880929,improper Installation of Auxiliary Feedwater Pump Motor 2B Noticed.Caused by Inadequate Design Review of Impingement Plate.Shield Plate Reinstalled Correctly Per Change Notice Z-885-26.W/undated Ltr + (ML20195C183)
- ML20195C187 + (ML20195C187)
- ML20195C188 + (ML20195C188)
- ML20195C189 + (ML20195C189)
- ML20195C191 + (ML20195C191)
- ML20195C192 + (ML20195C192)
- ML20195C193 + (ML20195C193)
- ML20195C195 + (ML20195C195)
- ML20195C196 + (ML20195C196)
- ML20195C199 + (ML20195C199)
- 05000293/LER-1988-016, :on 880517,unexpected Actuation of Inboard Portion of Reactor Bldg Isolation Control Sys Occurred, Resulting in Closure of Train a Isolation Dampers.Caused by Personnel Error.Work Process Revised + (ML20195C200)
- BECO-86-068, Application for Amend to License DPR-35,consisting of Proposed Change 86-07,deleting Tech Spec Sections 3.6.H & 4.6.H,Table 4.6.2 & Bases 3.6.H & 4.6.H,due to Completion of Mods Described in 730827 FSAR Suppl 34.Fee Paid + (ML20195C201)
- ML20195C203 + (ML20195C203)
- ML20195C205 + (ML20195C205)
- IR 05000320/1986005 + (ML20195C207)
- IR 05000295/1988018 + (ML20195C209)
- BECO-86-069, Part 21 Rept Re Ges RHR Min Flow Protection Logic Not Meeting Single Failure Design Criteria.Initially Reported on 860519.GES Performing Analysis.Final Rept Will Be Submitted Upon Completion of Corrective Actions + (ML20195C214)
- ML20195C215 + (ML20195C215)
- ML20195C216 + (ML20195C216)
- ML20195C217 + (ML20195C217)
- ML20195C218 + (ML20195C218)
- PY-CEI-NRR-0872, Monthly Operating Rept for May 1988 for Perry Nuclear Power Plant,Unit 1 + (ML20195C221)
- ML20195C222 + (ML20195C222)
- ML20195C224 + (ML20195C224)
- IR 05000498/1988025 + (ML20195C225)
- IR 05000458/1986003 + (ML20195C226)
- ML20195C229 + (ML20195C229)