Text
g(N jh+
,
-
n
,
y[(
-
.
'
OCT 261988
-
,
-Docket:No. 50-295.
Docket No. 50-304
Commonwealth Edist.1 Company-
ATTN: Mr. Cordell Reed
Senior Vice President
>
'
Post-Office Box 767
Chicago, IL : 60690
Gentlemen:
-
't
This refers to the routine safety inspection conducted by Mr. T. Ploski and
,
others of this office on September 27-29, 1988, of activities at.tne Zion
'
Nuclear Generating Station Units 1 and 2, authorized by NRC Operating Licenses
No. DPR-39.and No. DPR-48, and to the discussion of wr findings with
Mr. G. P11m1 and others of your staff on September 29, 1988. As additional
'
records were provided for my staff's evaluation following the September 29th
. exit -intoniew, another discussion of our findings with Mr. G. Plimi and
-
others of your staff took place on October 14, 1988.
!
> -
The enclosed copy of our inspection report identifies areas examined dt. ring
the inspection. Within these areas, the inspection consisted of a selective
a
examination of procedures and representative records, observations, and
interviews with persor nel.
No violations of NRC requirements were identified during the course of this
,
'
inspection. However, Exercise Weaknesses were identified, as sumarized in
t
the Appendix to this letter. As required by 10 CFR Part 50, Appendix E(IV.F),
any identified weaknesses must be corrected. Accordingly, you are requested
t
.
to advise us within 30 days of the date of this letter of the corrective
actions you have taken or plan to take, showing the estimated date of
1
completion for each weakness,
t
One weakness was the inadequate overall response to the Transportation
,
5
Accident that involved personnei injuries with and without contamination
complications. As discur. sed and agreed to in the October 14 teleconference
between our respective staffs, another demonstration of response capabili'.ies
to such a situation, rather than our observation of remedial classroom training
activities or training records review, is needed.
Based on the Zion Stati(n's
outage schedule, weather considerations, and allowing reasonable time to
complete corrective activities, the demonstration
!
4
,/
I
, .
h
!
8811020401 881026
-
ADOCK 05000295
i
-
O
l
i
!
- .:
-
_
'
i
t
,
Comonwealth Edison Company
2 0CT 2 61988
of response capabilities should be scheduled not later than the May 1989
exercise. We expect that your staff will keep us informed of the
demonstration's scope and schedule.
Sincerely,
50ricinal stened h v.p. Sh fer"
g Charles E. Norelius, Director
U Division of Radiation Safety
and Safeguards
Enclosures:
1.
Appendix A - Exercise
Weaknesses
2.
Inspection Reports
No. 50-295/88018(DRSS);
No. 50-304/88018(DRSS)
cc w/ enclosures:
T. J. Maiman, 'vice President,
PWR Operations
H. Bliss, Nuclear
Licensing Manager
G. J. Plim1, Station Manager
Jan Norris, Project Manager, NRR
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
Mayor, City of Zion
W. Travers, EPB, NRR
W. Weaver, FEMA, RV
yet
yet
yer
u
RI!! )
RIII
RIII
RIII
RIII
RI!
tJ4S/*
tot +
WM
- u.uA
5
Ploski/ jaw
Y,attrson
Snell
inds
fe
d
, MAS
).3
i,A./a s
s"
..lviss
.o
.-
._ _ _ _ _ _ _ - _ - - _ _ _ _ _ _ _ _ _ _ _ _ _
- _ - _ _ .
_
__
. _ _ _ _ .
__
_ _ _ .
_ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _
.
.-
,
APPENDIX A
EXERCISE WEAKNESSES
1.
Neither Control Room nor Technical Support Center staff adequately
informed State officials of the Transportation Accident situation.
They failed to utilize the "IESDA Hazardous Materials Radiological
Questionnaire" that had been developed for such situations and
incorporated into the Emergency Plan.
(No. 50-295/88018-01)
(Section Sa)
2.
Onshift personnel failed to recognize, in a timely manner, that
degraded plant conditions warranted a Site Area Emergency declaration.
(No. 50-295/88018-02) (Section Sa)
3.
Technical Support Center and Emergency Operations Facility staffs failed
to provide the NRC with adequately detailed and accurate information
regarding conditions existent at the times of the Site Area and General
Emergency declarations.
(No. 50-295/88018-03) (Section 5b)
4.
The overall response to the Transportation Accident, which also involved
'
several simulated injuries with and without contamination complications,
was inadequate.
(No. 50-295/88018-04) (Section Sc)
,
,
'
l
i
.
_ _ -
- - _ .