OPERATING DNI'A REPORT DOCKET No. 50-348 DNIE 6M /88 COMPLETED BY D. N. Morey
'IEEPHONE (205)899-5156 OPERATING STA'IUS Notes
- 1. Unit Name:
Joseph M. Farley - Unit 1
- 2. Reporting Period:
May, 1988
- 1) Cumulative data since
- 3. Licensed Thermal Power (tMt):-
2,652 12-1-77, date of
- 4. Nameplate Rating (Gross MNe):
860 cormnercial operation
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross PMe):
852.6
- 7. Maximum Dependable Capacity (Net FMe):
812.6
- 8. If Changes occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net FMe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A
'1his Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 744 3,647 92,039
- 12. Number Of Hours Reactor Was Critical
~~~
279.3 2,320.1 67,536.8
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
- 14. Hours Generator On-Line 237.0 2,277.1 66,102.6 15.. Unit Reserva Shutdown Hours 0.0 0.0 0.0
- 16. Gross 'Ihermal Energy Generated (IMH) 388,449 5,788,940 168,212,259
- 17. Gross Electrical Energy Generated (IMH) 119,320 1,882,552 54,050,090-~
- 18. Net Electrical Energy Generated (FMH) 97,758 1,771,188 50,940,384
- 19. Unit Service Factor 31.9 62.4-71.8
- 20. Unit Availability Factor 31 9 -
6E4~
71.8
- 21. Unit Capacity Factor (Using MDC Net) 16. 2~~
59.8 68.7
- 22. Unit Capacity Factor (Using DER Net) 15.8 58.6_
66.8
- 23. Unit Forced Outage Rate 0.0 0.0 9.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 08/06/77 38/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 6 N Form 2/34 8806220158 880531 PDR ADOCK 05000348 R
a ',
~ DOCKET NO.
50-348 UNIT 1
DATE June 7, 1988 COMPLETED' BY J. D. Woodard TELEPHONE (205)899-5156 MOtInt May DAY AYERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)"
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 7
6 0
22 0
7 0
23 151
.8 0
24 198 9
0 25 393 10 0
26 710 11' 0
27 622 12 0
28 184 13 0
29 606 14 0
30 820 15 0
31 826 16 0
INSTRUCTIONS On this format, list the aver,99 daily unit power Jevel in IMe-Net for each day in l
the reporting month.
Comput-to the neatest whole megawatt.
Form 13/21 l
i
.-._.,..,__,..._,..-_,_.._____.,._..,7,._,
( - --
o UNIT SHUTDOWNS AND POWER REDUCTIONS DOC %ET NO.
50-348 UNIT NAME J.
M. FARLET - UNIT 1 DATE JUNE 7 1988 COMPLETED 'BT D.
N.
MORET REPeT. MONTH MAT TELEPHONE (205)S99-5156 l
l l
l l
l METHOD OF l LICENSEE l l
l CAUSE & CORRECTIVE l
l l
l l DURATION l l SHUTTING l EVENT l 57 STEM l COMPONENT l
ACTION TO l
lNO.
l EATE l TTPE l (HOURS) l REASON l DOWN REACTOR l REPORT 4 l COCE l COCE l
PREVENT RECURRENCE l
1 1
I i
l I
i i
l i
I l001 l 8305G1 lS l491.0 lC l
1
[ N/A l N/A l N/A l The Cycle 8-9 refueling outage continued l
I I
l l
l l
l l
l l from 3-26-88.
l i
i i
i l
i I
i I
l l002 l 88G522 lS l16.0 lB l
1 l N/A l N/A l N/A l The generator was taken off-line for the l
l l
l l
l l
l l
1 l turbine overspeed trip test.
l l
1 I
I I
I I
I I
i i
l003 l 830527 l5 l0.0 lB l
4 l N/A l TA l FCV l Power was reduced to transfer the l
l l
l l
l l
l l
l l turbine valves from single to sequential l
l l
l l
l l
l l
l l valve control.
l 1
1 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
1 I
I I
i i
I I
I I
I i
i i
l 1
i i
l i
I I
I I
I I
i I
I I
I i
i i
I I
I i
l I
i l
1 1
I I
I I
I I
I I
I I
I I
I I
i i
l i
i i
i I
I I
I I
I I
i l
I I
I I
I l
i I
I I
I I
I I
I I
I l
I I
i 1
F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Repo r t (
- EP. ) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative Exhibit I -Same Source G-operational Error (Explain)
(9/77)
H-Other (Explain)
M N IH1 N
m
.,-44
-=
h 4
e 0
4
,P ~ ~ m
/(
L
'3 ;
A*
<.o lQ
/'.,*
'N D
'N e
f,e. 'a,n'? gsO" h
4w g#
w,---e
- 4 v--
-w.
--a,ww r-r-, - -,, - - - -
-e
,.m,- - - - - -
g-
-,e
,.+---c.
-~
me--- - - -r,e,-
r e,
ffr
~
%11bama Power Company
~$
600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291-0400 Telephone 205 250-1837 W. G. Hairston, lil Vice President Nuclear Generation the southem electic.pem June 13, 1988 Docket No. 50-348 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C.
20555 Joseph M. Farley Nuclear Plant Unit 1 Monthly operating Data Report Attached are two (2) copies of the May 1988 Monthly operating Report for Joseph M. Farley Nuclear Plant Unit 1, required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Yours very truly,
/ N N(
W'. G Hairston, III WGH/JGS:mab/1.6 Attachments xc:
Dr. J. N. Grace 3
-. - ~.
-t l-
.V
-JOSEPH E FARLEY NUCLEAR PIN (f UNIT 1-NARRATIVE StkMARY OF OPERATIONS May, 1988 f
Re Cycle 8 9 refueling outage continued into the month' of May. Power operation began on May 21.-
n e generator was taken off line at 0022 on May
' 22 to perionn the turbine overspeed trip test anxi the turbine balancing.
The unit returned to power ope;ation at 1620 on May 22.-
4 On May 19, safety valve V0010A lifted and insnediately ' reseated. De valve was tested and the_setpoint was readjusted. The remainii.g sa <ty valves r
were tested and readjusted as necessary.
On May 27, there was a scheduled power reduction when the unit was ramp 3d down to transfer the turbine valves from single to sequential valve control.
%e following major safety-related maintenance was perfonned in the month of May:
- 1. The stay bolte in the charging pianp room coolers were replaced.
- 2. Motor-operated valve 3135 (service water to reactor coolant pump air coolers) was replaced because an acceptable seal could not be nede during local leak rate testing.
- 3. Corrective maintenance was perfonned on HV 3227B (main fctdwater to the IB steam generator) due to a body to bonnet leak.
- 4. Testing of motor-operated valves in response to NRC Bulletin 85-03 was completed.
- 5. Inspections of pole shafts in response to Nhc Bulletin 88-01 were completed.
- 6. Miscellanecus corrective and preventive naintenarce was performed on the diesel generators.