._______ _
lI I
- D ke (buer Compey 1u R h eer PO Bmt31)$$
Mce Proidrat e
Charlotte, N C !$242
.% clear Produc twa (701L1?IlUl DUKEPOWER October 27, 1988 U. S. Nuc1 car Regulatory Cocraission Washington, D. C.
20555 Attention: Document Control Desk
Subject:
Catawba Nucicar Station Docket Nos. 50-413 and 50-414 McGuire Nuclear Station Docket Nos. 50-369 and 50-370 Safety Parameter Display System Gentlemen:
On February 18, 1988, Duke submitted the implementation dates for the upgrade to the Safety Parameter Display System (SPDS) at the Catawba and McGuire Nuclear Stations. To ensure the modifications are completed on each station's unit at approximstely the same time, the implementation dates for each unit have been revised. The new implementation dates are as follows:
McGuire 1 - End of Cycle 6 [ Currently scheduled for 2/8/90 - 4/9/90)
McCuire 2 - End of Cycle 5 [ Currently scheduled for 7/1/89 - 8/25/89]
Catawba 1 - December 8, 1989 Catawba 2 - December 8, 1989 Please note the Catawba 2 implementation date is dependent upon a License Candition amendment request submitted September 14, 1988.
Very truly yours, x
Ital B. Tucker ICL/
xc: M. L. Ernrt, Acting Regional Administrator U. S. Nuclear Regulatory Corraission Region II 101 Marietta Street, NW, Suite 2900
[
Atlanta, Georgia 30323 9
Mr. W. T. Orders Mr. P. K. Van Doorn NRC Resident Inspector NRC Resident inspector Catawba Nuclear Station McGuire Nuclear Station 8911020392 891027 PDR ADOCK 05000369 P