Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-23721, Monthly Operating Rept for Apr 1986 + (ML20195B200)
- 05000352/LER-1999-003, Forwards LER 99-003-00,re Rps,Pcrvics Actuations.Ler Contains Special Rept Info for HPCI & Reactor Core Isolation Cooling Sys Injections Into Rv + (ML20195B202)
- ML20195B203 + (ML20195B203)
- ML20195B204 + (ML20195B204)
- ML20195B206 + (ML20195B206)
- 05000414/LER-1986-006-04, :on 860417,120-volt Ac Vital Instrumentation & Control Power Sys Inverter 2EIB Malfunctioned Resulting in Loss of Channel B Power.Caused by Burned Inductor. Inverter 2EIB Deenergized.Inductor Replaced + (ML20195B208)
- ML20195B210 + (ML20195B210)
- 05000352/LER-1999-003-01, :on 990420,RPS & PCRVICS Actuations Were Noted, Due to Loss of FW Transient.Caused by Spuriously Opening Breaker.Deep Bed Condensate Deminerlizer Sys Was Replaced + (ML20195B211)
- ML20195B212 + (ML20195B212)
- ML20195B213 + (ML20195B213)
- ML20195B215 + (ML20195B215)
- ML20195B217 + (ML20195B217)
- ML20195B218 + (ML20195B218)
- ML20195B219 + (ML20195B219)
- ML20195B221 + (ML20195B221)
- ML20195B224 + (ML20195B224)
- ML20195B225 + (ML20195B225)
- ML20195B226 + (ML20195B226)
- ML20195B227 + (ML20195B227)
- 05000325/LER-1988-021-02, :on 880926,Group 6 Isolation Occurred Due to Actuation of Logic Circuitry of Auxiliary Trip Unit of Reactor Bldg Ventilation Exhaust Monitor.Technicians Checked Battery of Instrumentation & Control Group + (ML20195B229)
- ML20195B230 + (ML20195B230)
- ML20195B231 + (ML20195B231)
- ML20195B232 + (ML20195B232)
- 05000354/LER-1986-008, :on 860424,during Initial Fuel Loading,Nrc Inspector Discovered 24 H Standby Liquid Control Sys Surveillances Not Current.Caused by Personnel Error.All Specified Readings to Be Recorded + (ML20195B234)
- CY-98-191, Provides Notification That Util Implemented Defueled Emergency Plan for HNP on 981001.Util Completed Annual Exercise Required by Subj Plan & 10CFR50.47 + (ML20195B235)
- ML20195B236 + (ML20195B236)
- IR 05000259/1988021 + (ML20195B237)
- ML20195B237 + (ML20195B237)
- ML20195B238 + (ML20195B238)
- ML20195B239 + (ML20195B239)
- LIC-98-0137, Informs That as Result of Final Resolution of Stated Issue, OPPD Is Rescinding Commitment in to Declare Valves HCV-150 & HCV-151 Inoperable When Closed &/Or to Revise Operating Procedures to Include Cycling of Valves + (ML20195B240)
- ML20195B241 + (ML20195B241)
- ML20195B242 + (ML20195B242)
- ML20195B243 + (ML20195B243)
- ML20195B244 + (ML20195B244)
- ML20195B245 + (ML20195B245)
- ML20195B246 + (ML20195B246)
- ML20195B247 + (ML20195B247)
- ML20195B248 + (ML20195B248)
- ML20195B249 + (ML20195B249)
- ML20195B250 + (ML20195B250)
- ML20195B252 + (ML20195B252)
- ML20195B253 + (ML20195B253)
- ML20195B254 + (ML20195B254)
- LR-N980485, Responds to NRC Re Violations Noted in Insp Repts 50-272/98-08 & 50-311/98-08.Corrective Actions:Completed TS Surveillance,Performed Comparison of Mmis Data to Design Calculation & Personnel Involved Were Held Accountable + (ML20195B255)
- 0CAN108812, Forwards SAR 10CFR50.59 Summaries,Per Util 881029 Submittal of Amend 6 to Sars.All Open Items That Were Potential Safety Concerns Have Been Dispositioned + (ML20195B256)
- ML20195B257 + (ML20195B257)
- ML20195B259 + (ML20195B259)
- ML20195B260 + (ML20195B260)
- ML20195B261 + (ML20195B261)
- ML20195B263 + (ML20195B263)