DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO.
R-86-004 DATE RAY 5, 1980 COMPLETED BY A.O. Fredieu I TITLE Asst. Ops supv TELEPHONE 635-6094 X2557 MONTH April 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
0 17.
310 2.
0 18.
146 3.
0 19.
0 4.
0 20.
63 5.
0 21.
411 6.
0 22.
568 7.
0 23.
401 8.
0 24.
0 9.
0 25.
0 10.
0 26.
140 11.
0 27.
0 12.
0 28.
435 13.
0 29, 551 14.
105 30.
592 15, 212 31.
16, 302 Based on GSU dispatch.
8605290103 060430 PDR ADOCK 05000450 R
PDR 4
h, d '
y
[
I UNIT SHUTDOWNS AND POWER REDUCTIONS I
I' TIME TIME q
START REC 0VER I
OF FROM DURATION TYPE REASON METHOD DCCURANCE OCCURANCE (HOURS)
NOTE (1)
NOTE (2)
NOTE (3)
CORRECTIVE ACTIONS /C0fe4ENTS j
g DATE NO I
I I
04/01 0000 0758 320 S
B 3
Continued from previous month MSIV 1
f 4/14 Isolation Startup Test.
I I
2 04/18 1252 1800 53 F
A 1
Investigate and correct problems g
g g
g g
with the "B" Recirc pump vibration 4/20 monitor.
g g
g I
I I
I I
l Master feedwater level 04/23 1740 2358 54 F
H 3
3 I
I failing to respond while in auto.
4/25 g
g g
I I
I 4
04/26 1342 2336 34 F
H 3
Spikes on APRM B&F with 1/2 on I
I
! channel "C".
Resulted in full RX 4/27 I
! Scram.
SUFW4ARY:
g i
I I NOTE (1) TYPE OF OCCURANCE: ENTER CODE DOCKET NO. 50/458 I
F: FORCEO RIVER BEND STATION UNIT 1 I
5: SCHEDULED I
REPORT N0. R-86-004 NOTE (2) REASON FOR OCCURANCE: ENTER CODE I
A: EQUIPMENT FAILURE (EXPLAIN IN CORRECTIVE ACTIONS /C009 TENTS)
REPORT MONTH April 30, 1986 B: MAINTENANCE OR TEST I
C: REFUELING DATE May 5, 1986 I
D: REGULATORY RESTRICTION I
E: OPERATOR TRAINING AND LICENSE EXAMINATION A.O. Fredieu F: ADMINISTRATIVE COMPLtitU BY (PRINT)
G: OPERATIONAL ERROR (EXPLAIN IN CORRECTIVE ACTIONS /C009 TENTS)
\\
H: OTHER (EXPLAIN IN CORRECTIVE ACTIONS /C0094ENTS)
O U,-
V cf SI8flATJRE j
NOTE (3) METHOD OF SHUTTING DOWN REACTOR OR REDUCING POWER: ENTER CODE v
1: MANUAL Asst. Operations Supervisor 2: MANUAL SCRAM TITLE 3: AUTOMATIC SCRAM 4: OTHER (EXPLAIN IN CORRECTIVE ACTIONS /C009 TENTS)
TELEPHONE 635-6094 X2557 tum-gam-024 i
DOCKET NO.
50/458 RIVER BEND STATION UNIT 1 REPORT No.
a-86-004 DATE s-2-as COMPLETED BY t-u u mn 134.M TITLE Ranctor Engin6er TELEPHONE (5041635-6094 ext. 2354 Attachment III page 1 of 2 OPERATING STATUS 0000 2400 1.
REPORTING PERIOD:
a-t-as/4-30-86 GROSS HOURS IN REPORTING PERIOD:
720 2.
CURRENTLY AtTTHORIZED POWER LEVEL (Hwt):
2a94 MAX.
DEPEND. CAPACITY (MWe-Net):
0 DESIGN ELECTRICAL RATING (MWe Net):
936 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
N/A 4.
REASONS FOR RESTRICTION (IT ANY):
THIS YR TO CUMU-MONTH DATE LATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL... 291.9 1522.1 2599.2 6.
REACTOR RESERVE SHUTDOWN HOURS..........
n 0
0 7.
HOURS GENERATOR ON LINE................ g 1147.7 1303.8 8.
UNIT RESERVE SHtTTDOWN HOURS............
n 0
0 9.
GROSS THERMAL ENERGY GENERATED (MWH)....M5 E ll 1381439 10.
GROSS EI.ECTRICAL ENERGY GENERATED (MWM)._1,1.nJ2.1 1218.97.0 346257.0 11.
NET ELECTRICAL ENERGY GENERATED (MWH)..._1111g.47.7 282245.3 299745.3 s
DOCEET NO.
50/458 RIVER BEND STATION UNIT 1 REPORT NO.
n_n -naa PAGE 2
0F 2
OPERATING STATUS
^""**
"" III THIS YR TO CUMU-MON'llt.
DATE LATIVE 12.
REACTOR SERVICE FACTOR........... vfi s/A N/A 13.
REACTOR AVAILABILITY FACTOR...... N/A N/A N/A 14.
UNIT SERVICE FACTOR.............. N/A N/A N/A 15.
UNIT AVAILABILITY FACTOR......... N/A N/A N/A 16.
UNIT CAPACITY FACTOR (Using MDC).. w/A N/A N/A 17.
UNIT CAPACITY FACTOR (Using Design MWe)
...................... n/A N/A N/A 18.
UNIT FORCED OUTAGE RATE...........
M /A N/A N/A 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, A.W DURATION OF EACH):
20.
IF SHLTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
y/A 21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)
FORECAST ACHIEVED INITIAL CRITICALITY v/i 10-31-85 0037 INITIAL EI.ECTRICITY n /1 12-03-85 0344 COMMERCIAL OPERATION N/A
- !.atest expected completion of 100 percent power testing - June 1986.
Supplementary information for April 1986 Monthly Report On 3/20/86 at 0957 hours0.0111 days <br />0.266 hours <br />0.00158 weeks <br />3.641385e-4 months <br /> during the performance of ST-25B (MSIV full closure) at 72 percent reactor
- power, Safety Relief Valves (SRVs) B21*RVF051C and *RVF051D were actuated as pressure relief valves to control reactor pressure.
At the time of the initial relief valve actuations described
- above, test observers saw indications that B21*RVF041C opened briefly.
There is no evidence that *RVF041C was actuated as a
pressure relief valve.
Therefore it was determined that a spring actuation in the conservative direction had occurred.
SRV B21*RVF041C will be included in the group of valves scheduled to be tested for set pressure and Icakage.during the next refueling outage.
t 1
T ~
4 GULF STATES UTILITIES COMPANY nutn eenc sunen esto m co no sr mcisvuuov.s.= mm AAEA CODE 604 635 6094 346 865t May 15, 1986 RBG-23721 File Nos. G9.5, G9.25.1.5 Mr. Ronald M. Scroggins Director, Office. of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Scroggins:
River Bend Station - Unit 1 Docket No. 50-458 Enclosed is Gulf States Utilities Company's Monthly Operating Report for April 1986 for River Bend Station (RBS).
This report is submitted in accordance with RBS Technical Specification 6.9.1.6.
Sincerel fe J.
E. Booker Manager-Engineering Nuclear Fuels & Licensing River Bend Nuclear Group JEB/kR/ ERG /BYI/je Enclosure cc:
Regional Administrator U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 U.S. NBC Document Control Desk 3R@2:W_g*
)
MAY 2 Iq86 L u._
t
- +...,..
h'b t