ML20195B245

From kanterella
Jump to navigation Jump to search
Forwards List of Submittals NRC Needs from TVA to Support NRC Decisions Re Heatup & Restart.Util Should Provide NRC W/ Expected Dates for Facility Heatup (Mode 4) & Restart (Mode 2) within 15 Days of Ltr Receipt
ML20195B245
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 06/14/1988
From: Black S
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8806210349
Download: ML20195B245 (3)


Text

.

? June 14,1%8 Docket No. 50-327 -Distribution A Docket: File, BDLiaw TVA-Rockville NRC PDR"* FMcCoy SQN Rdg. File Mr. S. A. White Local PDR MSinns Manager of Nuclear Power Projects Rdg. JDonohew Tennessee Valley Authority SEbneter JRutberg 6N 38A Loo <out Place JPartlow FMira 1101 Market Street JAxelrad ACRS(glia 10)

Chattanooga, Tennessee 37402-2801 SRichardson Edordan SBlack GPA/CA

Dear Mr. White:

SUBJECT:

SEQU0YAH UNIT 1 RESTART - SUBMITTALS NEEDED FROM TVA Re: Sequoyah Nuclear Plant, Unit 1 Enclosed is a list of the submittals the staff needs from TVA to support NRC decisions regarding Unit I heatup and restart. Any slippage in the target dates listed could adversely impact our review schedule. Thshe dates have been agreed to by OSP and your staff.

Our reviews may identify the need for additional irdormation to resolve the technical issues if your submittals are incomplete. We will notify you protoptly of these instances as they arise.

To assist the staff in providing resources for meeting the Unit i restart schedule and for work on TVA plants other than Sequoyah Unit 1, we request that you provide us with the expected dates for Sequoyah Unit I heatup (Mode 4) and restart (Mode 2). In addition, we request that you submit the heatup profile and the starter power ascension program for Unit 1. Please provide this information within 15 days of the receipt of this letter The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely.

Original Signed by Suzanne Black, Assistant Director for Projects TVA Projects Division 8806210349BB[oN27 ADOCW O Po9 Office of Special Projects PDR P

Enclosure:

Submittals Needed For Restart m I

cc w/ enclosure: ,

See next page -  %

OSP:TVA/LA 0 PM TVAlM/P  ;

MSintns jp// J w:as BDqiw{P _

SBlack 1 6/g/88'~ o 88 6/@/88 6/p./88 ,

L SUBMITTALS NEEDED FOR RESTART Submittal Target Date TS 88-10, Turbine Driven AFW Pump 6/06/88 TMI II.D.1, Relief Valves and 6/10/88 Safety Valves Testing Bulletin 85-01, Steam Binding 6/10/88 of AFW Pumps Unit 1 Hydrogen Analyzer Valves 6/15/83 ASME Code Relief Letter Stating TVA is Ready For 6/17/88 OSP System Quality Evaluation Inspection Fire Protection Calculations 6/17/88 Revision 9 TS 88-12, Corporate Reorganization 6/14/88 Response to Staff letter on 6/24/88 Silicone Rubber Insulated Cable Letter NRC Bulletin 88-03 Response 6/30/88 Restart Electrical Design Calculations 7/01/88 NRC Bulletin 88-01 Response 7/01/88 Letter Stating TVA Is Ready for the 7/11/88 OSP Fire Protection Inspection NRC Bulletin 88-04 Response 7/15/88 NRC Bulletin 88-05 Response 7/15/88 Unit 1 Environrr. ental Qualification 7/30/88 Letter Seismic Qualification of Cable Trays To Be Determined for Unit 1

Mr. S. A. White Tennessee Valley Authority Sequoyah t'uclear Plant cc:

General Counsel Regional Administrator, Pegion II Tannessee Valley Authority U.S. Nuclear Regulatory Comissicn 400 West Sumit Hill Drive 101 Marietta Street, N.W.

E11 B33 Atlanta, Georgia 30323 Knoxville, Tennessee 37902 Resident Inspector /Sequoyah NP Mr. R. L. Gridley c/o U.S. Nuclear Regulatory Comission Tennessee Valley Authority 2600 Igou Ferry Road SN 1578 Lookout Place Soddy Daisy, Tennessee 37379 Chattanooga, Tennessee 37402-2801 Mr. Richard King Mr. H. L. Abercrombie c/o U.S. GA0 Tennessee Valley Authority 1111 North Shore Drive Sequoyah Nuclear Plant Suite 225, Box 194 P.O. Box 2000 Knoxville, Tennessee 37919 Soddy Daisy, Tennessee 37379 Mr. M. R. Harding Mr. Michael H. Mobley, Director Tennessee Valley Authcrity Division of Radiological Health Sequoyah Nuclear Plant T.E.R.R.A. Building, 6th Floor P.O. Box 2000 150 9th Avenue North Soddy Daisy, Tennessee 37379 Nashville, Tennessee 37219-5404 Mr. D. L. Williams Dr. Henry Myers, Science Advisor Tennessee Valley Authority Comittee on Interior 400 West Sumit Hill Drive and Insular Affairs W10 885 U.S. House of Representatives -

Knoxville, Tennessee 37902 Washington, D.C. 20515 County Judge Hamilton County Courthouse Chattanooga, Tennessee 37402 1

i l .