Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20155K548 + (ML20155K548)
- ML20155K549 + (ML20155K549)
- 05000259/LER-1986-013-01, :on 860422,Tech Spec Requirements for Secondary Containment Integrity in Refuel Zone Not Fully Met.Caused by Personnel Error Resulting in Improper Tagging of Damper Air Isolation Valves.Personnel Counseled + (ML20155K550)
- ML20155K551 + (ML20155K551)
- 05000416/LER-1998-003-04, :on 980507,core Shroud Insp Tool Theta Drive Ring Became Partially Disconnected from Strongback.Caused by Air Bubbles Vented Into Vessel.Secured Ring Temporarily While Recovery Plan Was Developed.With + (ML20155K552)
- 05000483/LER-1986-015, :on 860423,auxiliary Feedwater Actuation Sys & Steam Generator Blowdown Isolation Occurred.Caused by Radwaste Technician Unintentionally Opening Dc Fused Disconnect Switch.Incident Reviewed W/Staff + (ML20155K553)
- IR 05000320/1988007 + (ML20155K555)
- B17524, Informs of Util Determination That There No Longer Exists Need to Maintain Mnps,Unit 3 Operator License for Wh Small, License OP-10426-2,effective 981027 + (ML20155K556)
- ML20155K557 + (ML20155K557)
- ML20155K558 + (ML20155K558)
- PNO-I-98-051, on 981112,licensee Shutdown Seabrook Station, After Visual Insp Indicated Damage to Main Generator a Phase Output bus.One-week Outage Planned to Troubleshoot & Repair Bus Ductwork.Licensee Did Not Issue Press Release + (ML20155K559)
- ML20155K560 + (ML20155K560)
- ML20155K561 + (ML20155K561)
- ML20155K562 + (ML20155K562)
- ML20155K563 + (ML20155K563)
- ML20155K564 + (ML20155K564)
- PNO-III-98-055, on 981113,licensee Shut Unit Down to Repair Steam Leak from Reactor Feedwater Check Valve.Valve Is SR & Would Provide Containment Isolation Function Under Accident Conditions + (ML20155K565)
- 05000369/LER-1986-008-01, :on 860415,high Makeup Rate to Vol Control Tank Indicated Unidentified RCS Leakage at Rate of 9 Gpm.Caused by Failure of Two 1/2-inch Tubing Compression Fittings on Pzr Level Impulse Lines.Fittings Replaced + (ML20155K566)
- ML20155K567 + (ML20155K567)
- ML20155K568 + (ML20155K568)
- ML20155K571 + (ML20155K571)
- ML20155K572 + (ML20155K572)
- ML20155K573 + (ML20155K573)
- ML20155K575 + (ML20155K575)
- ML20155K578 + (ML20155K578)
- ML20155K579 + (ML20155K579)
- LIC-98-0153, Forwards Copy of Annual Audit for Period of 970701-980630,as Required by Decommissioning Funding Plan Trust Agreement. Without Encl + (ML20155K581)
- ML20155K583 + (ML20155K583)
- ML20155K584 + (ML20155K584)
- ML20155K589 + (ML20155K589)
- ML20155K590 + (ML20155K590)
- ML20155K591 + (ML20155K591)
- ML20155K592 + (ML20155K592)
- ML20155K593 + (ML20155K593)
- ML20155K594 + (ML20155K594)
- ML20155K597 + (ML20155K597)
- ML20155K599 + (ML20155K599)
- ML20155K602 + (ML20155K602)
- ML20155K605 + (ML20155K605)
- ML20155K607 + (ML20155K607)
- ML20155K609 + (ML20155K609)
- ML20155K610 + (ML20155K610)
- 05000254/LER-1998-023, :on 981008,discovered That Air Filtration Unit (Afu) Airflow & Afu Differential Pressure Exceeded TS Limits.Caused by Inaccuracy of CREVS Afu Airflow Instrument. Licensee Adjusted Afu Airflow Rate to Meet TS Requirements + (ML20155K611)
- ML20155K613 + (ML20155K613)
- ML20155K614 + (ML20155K614)
- ML20155K615 + (ML20155K615)
- ML20155K617 + (ML20155K617)
- ML20155K618 + (ML20155K618)
- ML20155K619 + (ML20155K619)
- ML20155K622 + (ML20155K622)
- ML20155K626 + (ML20155K626)