Deficiency Rept DER 86-11 Re Skinner Solenoid Valves. Initially Reported on 860314.Submittal of Final Rept Delayed Due to Addl Investigation & Evaluation of Transportability & Root Cause
ML20155K560
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 05/07/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-36519-EEVB, ANPP-36519-EVB, DER-86-11, NUDOCS 8605290009
Download: ML20155K560 (2)


Text

--

tOw nECEl'IED NEC Arizona Nuclear Power Project 33 v'? 12 PM 12: 'il P O. Box 52034 e PHOENIX, ARIZONA 85072-2034 May 7, 1986 t

ANPP-36519-EEVB/LAS/DRL U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:

Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 Docket No. 50/530

Subject:

Time Extension For Report - DER 86-11 A 50.55(e) Potentially Reportable Deficiency Relating to Skinner Solenoid Valves File: 86-006-216; 86-056-026; D.4.33.2

Reference:

(A) Telephone Conversation between R. C. Sorenson and D. R. Larkin on March 14, 1986 (Initial Reportability - DER 86-11)

(B) ANPP-36087, dated April 14, 1986 (Interim Report - DER 86-11)

Dear Sir:

The NRC was notified of a Potentially Reportable Deficiency in Reference (A) and an Interim Report was issued by Reference (B). At that time it was estimated that a Final Report would be available by May 16, 1986.

Due to review comments indicating the need for additional investigation and eval-uation of the transportability and root cause, it is now expected that this infor-i mation will be finalized by June 2,1986, at which time a complete report will be submitted.

4 There is no new information or change to the Interim Report at this time.

Very truly you Qq e m L,

C, C t.A A.,_

nUd E. E. Van Brunt, Jr.

8605290009Og{h8530 Executive Vice President PDR ADOCK O PDR Project Director S-EEVB/DRL/1df Idf/001/TE8611 cc: See Page Two

? 0 YS]

,e.v -,, :- r: - -

e :; y

[ OL *7

[

DER 86 Time Extension-

'Mr.oD. F. Kirsch

Acting Director ANPP-36519-EEVB/LAS/DRL-92.11

.May 7, 1986 Page 2 cc:

J. M.' Taylor, Director.

Office of Inspection and Enforcement U.; S.-Nuclear Regulatory Commission Washington,-D. C. 20555 A. C. Gehr (4141) 1.

'R..P. Zimmerman- -(6295)

Records Center

~

Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 H

Atlanta, Gergia _30339 s

9 S

I

\\

ildf/009/ FORM-7