Forwards Addl Info Re Deletion of Boron Injection Tank & Supporting Analysis Per 860522 Request.Results in FSAR & WCAP-9226 Remain Valid
ML20155K557
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 05/27/1986
From: Devincentis J
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To: Noonan V
Office of Nuclear Reactor Regulation
References
SBN-1067, NUDOCS 8605290005
Download: ML20155K557 (3)


Text

i SEABROOK STATION Engineering Office

,l Abac SeMee W New Hampshko Now Hompshire Yonkeo DMolen May 27, 1986 SBN-1067 T.F. B7.1.2

' United States Nuclear Regulatory Commission Washington, DC 205SS~

Attention:

Mr. Vince'nt S. Noonan, Project Director PWR Project Directorate No. 5

References:

(a) Construction Permits CPPR-135 and CPPR-136, Docket Nos. 50-443 and 50-444

Subject:

Request for Additional Information:

Deletion of the Boron Injection Tank

/

Dear Sir:

During discussions with the Staff on May 22, 1986, we were requested to provide udditional information regarding the deletion of the boron injection tank and the supporting analysis. This additional information is provided in Attac,hment 1.

If you have any further questions, do not hesitate to contact us.

Very truly yours, John DeVincentis Director of Engineering Enclosure cc: Atomic Safety and Licensing Board Service List A

\\

Fg

,e

... _.,ese,. 1o - 3,., _

Dicn3 Currca, Esquire Calvin A. Cannog Marmon & Weiss City Manager 2001 S. Street, N.W.

City Hall suite 430 126 Donlel Stredt Portsmouth, NH 03801 Washington, D.C.

20009 Sherwin E. Turk. Esq.

Stephen E. Merrill, Esquire 2

Office of the Executive Legal Director Attorney General U.S. Nuclear Regulatory Casumission George Dana Bisbee, Esquire Tenth Floor Assistant Attorney General Washington, DC 20555 office of the Attorney General 25 Capitol Street Robert A. Backus. Esquire Concord, MN 03301-6397 116 Lowell Streek

)

P.O. Box 516 Mr. J. F. Nadeau Manchester, MN 03105 Selectmen's Office 10 Central Road Philip Ahrens, Esquire Rye, NH 03870 Assistant Attormey General Department of The Attorney General Mr. Angle Machiros Statehouse Station M Chalman of the Board of Selectmen kugusta, NE 04333 Town of Newbury Newbury, MA 01950 Mrs. Sandra Cavutis chalman, Board of Selectmen Mr. Willian 8. Lord RFD 1 - Box 1154 Board of Selectmen Kennsington, NN 03827 Town Hall - Friend Street Amesbury, MA 01913 Carol S. Sneider Esquire Assistant Attorney General Senator Gordon J. Humphrey Department of the Attorney General 1 Pillsbury Street One Ashburton Place, 19th Floor Concord, NN 03301 Boston, RA 02108 (ATTN: Herb Boynton)

{

Senator Cordon J. Humphrey N. Joseph Flynn, Esquire U.S. Senate Office of General Counsel Washington, DC 20510 Federal Beersency Management Agencyg (ATTN: Tom Burack) 500 C Street SW Washington, DC 20472 Richard A. Hampe Esq.

Hampe and McNicholas Paul McEachern, Esquire 35 Pleasant Street Matthew T. Brock, Esquire Concord, NH 03301 Shatnes & McEachern 25 Maplewood Avenue Donald E. Chick P.O. Box 360 Town Manager Portsmouth, NH 03801 Town of Exeter 10 Front Street Cary W. Holmes, Esq.

Exeter, NH 03833 Holmes & Ells 47 Winnacunnet Road Brentwood Board of Selectmen Hampton, NH 03841 RFD Dalton Road Brentwood, NH 03833 Mr. Ed Thomas FEMA Jtegion I Peter J. Mathews, Mayor 442 John W. McCormack PO & Courthouse City Hall Bosto'n, MA 02109 Newburyport, MA 01950 Stanley W. Knowles, Chairman Board of Selectmen P.O. Box 710 North Hampton, NH 03862

SBN-1067 ATTACHMENT 1 Additional Information 1.

The Baron Injection Tank (BIT), although physically located inside the Primary Auxiliary Building, is not connected to any system (see FSAR Figure 6.3-1, Sheet 2, provided in Amendment 56). That is, we do not rely on closed valves to isolate the BIT.

2.

The analysis results in WCAP-9226 address two general categoties of steamline break analyses.

The first category addresses steamline breaks which occur while the reactor is critical and operating at power prior to reactor trip. Tube bundle uncovery is not predicted prior to reactor trip and the point of minimum DNBR during these transients and, therefore, there is no impact on the analysis results.

The second category addresses steamline breaks which occur while the reactor is in hot zero power condition with the most reactive rod stuck out of the core. These transients are also analyzed on a plant specific basis in the Seabrook Station FSAR. The analysis methodology used in these analyses conservatively force a delay in the tube bundle uncovery well past the predicted tube bundle uncovery point.

Therefore, a heat transfer rate is maintained in excess of the value which would be calculated with the combination of the predicted tube bundle uncovery and the superheated steam heat transfer. This is conservative since it maximizes the cooldown by the faulted steam generator and consequently maximizes the return to power. Therefore, the results presented in the Seabrook Station FSAR and WCAP-9226 remain valid.