Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154H995 + (ML20154H995)
- RBG-23245, Forwards Rept Containing Brief Description of Changes to Initial Test Program & Summary of Safety Evaluation for Each Change + (ML20154H997)
- A07194, Responds to NRC Re Violations Noted in Insp Rept 50-423/88-05.Corrective Actions:Valve 3FWA*V2 Locked Open, Listed Valve Lineup Performed on Trains a & B & Description of Event & Caution to Verify Valves Distributed to Shifts + (ML20154H999)
- ML20154J000 + (ML20154J000)
- ML20154J001 + (ML20154J001)
- ML20154J005 + (ML20154J005)
- ML20154J006 + (ML20154J006)
- ML20154J007 + (ML20154J007)
- HBL-88-077, Requests Exemption from Provisions of 10CFR70.51(d) Re Annual Physical Inventory of Spent Fuel.Conducting Physical Inventory Not Necessary to Achieve Underlying Purpose of Rule.Performance of Annual Inventory Satisfies Requirement + (ML20154J008)
- ML20154J010 + (ML20154J010)
- ML20154J012 + (ML20154J012)
- U-601163, Proposed Tech Spec Tables 2.2.1-1, Reactor Protection Sys Instrumentation Setpoints & 3.3.2-2, Containment & Reactor Vessel Isolation Control Sys + (ML20154J013)
- ML20154J014 + (ML20154J014)
- ML20154J015 + (ML20154J015)
- ML20154J017 + (ML20154J017)
- ML20154J018 + (ML20154J018)
- ML20154J019 + (ML20154J019)
- ML20154J020 + (ML20154J020)
- A05442, Submits Addl Info Re Compliance W/Atws Rule Schedule,Per 10CFR50.62,in Context of Isap.Isap Review Will Be Submitted by 860625.Request for Permanent Exemption Will Be Submitted by 860530 + (ML20154J021)
- ML20154J022 + (ML20154J022)
- PLA-2605, Forwards Design Description Rept to Assist in Review of 860210 Proposed Tech Spec Changes Re Incorporation of Fifth Diesel Generator Into Design.Rept Includes Design Approach, Physical Description & Mechanical Equipment Design + (ML20154J024)
- ML20154J025 + (ML20154J025)
- ML20154J027 + (ML20154J027)
- ML20154J028 + (ML20154J028)
- BECO-86-023, Application for Amend to License DPR-35,consisting of Proposed Change 86-05,deleting Tech Spec 6.15 to Remove 820630 Implementation Date for Final Qualification of safety-related Electrical Equipment.Fee Paid + (ML20154J029)
- ML20154J031 + (ML20154J031)
- IR 05000324/1988019 + (ML20154J032)
- ML20154J033 + (ML20154J033)
- ML20154J035 + (ML20154J035)
- ML20154J036 + (ML20154J036)
- ML20154J037 + (ML20154J037)
- ML20154J043 + (ML20154J043)
- 0CAN028607, Ack Receipt of 860203 Invitation to Attend 860319 Meeting of Region IV Utils & Request for Confirmation of Attendance. Proposed Meeting Worthwhile & Beneficial.Meeting Will Be Attended by Author & J Griffin + (ML20154J045)
- ML20154J046 + (ML20154J046)
- A05481, Forwards Addl Info Re Main Steam Line Support Failures, Including Drawings & Figures of Main Steam Lines,Associated Supports & Monitoring Instrumentation Recently Installed. Failure Believed to Be Result of Operating Transient + (ML20154J048)
- ML20154J050 + (ML20154J050)
- ML20154J052 + (ML20154J052)
- ML20154J054 + (ML20154J054)
- ML20154J055 + (ML20154J055)
- ML20154J056 + (ML20154J056)
- ML20154J057 + (ML20154J057)
- ML20154J059 + (ML20154J059)
- ML20154J060 + (ML20154J060)
- U-600472, Responds to Unresolved Item Re Pump & Valve Operability Qualification Identified by Pump & Valve Operability Review Team During 860128-29 Technical Session.Vendor Selected 100 Impact Tests to Meet Spec K-2873A Requirements + (ML20154J062)
- IR 05000454/1985054 + (ML20154J065)
- ML20154J066 + (ML20154J066)
- ML20154J067 + (ML20154J067)
- RBG-27871, Responds to Violations Noted in Insp Rept 50-458/87-21 on 871102-06.Corrective Actions:Upon Identification of Lack of Specific Similarity Analysis for V-splice,util Performed & Documented Analysis Requested by NRC Inspectors + (ML20154J068)
- ML20154J069 + (ML20154J069)
- ML20154J071 + (ML20154J071)
- ML20154J075 + (ML20154J075)