Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NSD-NRC-98-5788, Forwards Formal Transmittal of Correspondence Previously Sent Informally Over Period of 980702-0826.Index of Encl Matl Provided + (ML20153C798)
- RBG-28573, Special Rept:On 880727,temp in Main Steam Tunnel Rose Above Tech Specs 3/4.7.8 Limit of 135 F for More than 8 H.Caused by Inoperable Unit Cooler Fan Due to Motor to Fan Connection Mechanical Failure.Unit Cooler Driver Repaired + (ML20153C799)
- ML20153C802 + (ML20153C802)
- ML20153C803 + (ML20153C803)
- ML20153C805 + (ML20153C805)
- ML20153C806 + (ML20153C806)
- ML20153C807 + (ML20153C807)
- ML20153C810 + (ML20153C810)
- 05000455/LER-1998-007-04, :on 980821,operator Selected Wrong Test Switch & Actuated Containment Spray Train a Valves.Caused by Failure to Implement peer-check Administrative Guidance. Pre-job Briefs Emphasized with Supervisor.With + (ML20153C812)
- 05000331/LER-1986-002, :on 860114,containment Atmosphere Dilution Hydrogen & Oxygen Analyzer Inoperable.Caused by Failed Bearing.Analyzer Motor & Pump Assembly Replaced & Returned to Svc + (ML20153C813)
- ML20153C814 + (ML20153C814)
- ML20153C817 + (ML20153C817)
- ML20153C818 + (ML20153C818)
- RBG-28572, Special Rept:On 880521,invalid Failure of Div II Diesel Generator Occurred During Performance of Surveillance Testing.Caused by Operator Error.Diesel Generator Successfully Retested + (ML20153C820)
- 05000265/LER-1986-002-02, :on 860117,Dec 1985 Monthly Grab Sample of Reactor Bldg Vent Stack Gaseous Effluent for Tritium Analysis Not Obtained.Caused by Personnel Error.Personnel Instructed + (ML20153C821)
- ML20153C823 + (ML20153C823)
- ML20153C824 + (ML20153C824)
- ML20153C828 + (ML20153C828)
- ML20153C832 + (ML20153C832)
- ML20153C833 + (ML20153C833)
- ML20153C836 + (ML20153C836)
- ML20153C839 + (ML20153C839)
- ML20153C840 + (ML20153C840)
- ML20153C842 + (ML20153C842)
- ML20153C843 + (ML20153C843)
- ML20153C846 + (ML20153C846)
- ML20153C847 + (ML20153C847)
- ML20153C849 + (ML20153C849)
- ML20153C850 + (ML20153C850)
- ML20153C851 + (ML20153C851)
- ML20153C852 + (ML20153C852)
- ML20153C853 + (ML20153C853)
- ML20153C855 + (ML20153C855)
- ML20153C857 + (ML20153C857)
- ML20153C860 + (ML20153C860)
- ML20153C862 + (ML20153C862)
- ML20153C863 + (ML20153C863)
- ML20153C865 + (ML20153C865)
- ML20153C866 + (ML20153C866)
- IA-88-104, Final Response to FOIA Request for Documents Re SECY-81-636. Forwards App B Documents Subj to Categories A-E & G of Request.Documents Also Available in PDR + (ML20153C868)
- ML20153C868 + (ML20153C868)
- ML20153C869 + (ML20153C869)
- ML20153C871 + (ML20153C871)
- 05000277/LER-1988-020-01, :on 880729,capacitors Which Connect 500 Kv Bus Tie to Phase a Potential Transformer Failed,Resulting in Fire in North Substation & Voltage Disturbance Resulting in ESF Actuations.Caused by Capacitor Failure + (ML20153C872)
- ML20153C874 + (ML20153C874)
- ML20153C875 + (ML20153C875)
- SNRC-1464, Forwards Comments W/Supporting Documentation Re post-NRC Written Operator Exams,To Assist in Evaluating Responses to Exam Questions + (ML20153C878)
- ML20153C879 + (ML20153C879)
- ML20153C881 + (ML20153C881)
- ML20153C886 + (ML20153C886)
- ML20153C887 + (ML20153C887)