_ _ _ _
AUG 041988 Dennis L. Fadden Institute of Nuclear Power Operations Suite 1500, 1100 Circle 75 Parkway Atlanta, Georgia 30339-3064
Dear Mr. Fadden:
Enclosed for your information is our biweekly listing of generic comuni-
')
t cations being considered or under development by the NRC staff. These include Bulletins (type coded BL on the list)
Information Notices (IN) and Generic Letters (GL). This listing includes all proposed generic comunications that had been reported to us by August 1, 1988.
Sincerely, Original Sign;d ;j t
Carl H. Bulinger Carl H. Berlinger, Chief Generic Comunications Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation
Enclosure:
As stated DISTRIBUTION w/ enclosure All NRC Division Directors All NRC Branch Chiefs CERossi. NRR CHBerlinger, NRR DCKirkpatrick, NRR PDR Central Files DCS 00EA R/F OGCB R/F DKirkpatrick R/F i
[)cf
/'f/]
OGCB:DOEA:NRR C/0GCB:DOEA:NRR s
20, h'D DCKi kpatrick CHBerlinger 0$/ /88 03///88 pro) 1 g
p f
g*688"7 ASlii@p
- $ jg' pP y
t 3
- 08/04/88 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP ORIGIN.
SUBJECT CONTACT PHONE ISSUE OFFICE DATE IN NRR/DRIS ENVIRONMENTAL QUALIFICATION Steve (301) 09/30/88 RVIB OF LIMITOROUE MOV ACTUATOR Alexander 492-0995 TERMINAL BLOCKS & MARATHON 1600 TERMINAL BLKS f
IN NRR/ DEST RECENT EVENTS CONCERNING Vern Hodge (301) 08/16/88 SPLB CONTROL ROOM HABITABILITY.
492-1169 GL REGION HEAT EXCHANGER FOULING.
Verr Hodge (301) 09/01/88 II 492-1169 IN NRR/DOEA BWR VESSEL OVERFILL EVENTS.
Pat (301) 08/15/88 EAB Baranowski 492-1156 IN NRR/ DEST ERRORS IN CALIBRATION OF Joe Joyce (301) 10/01/88 SICB LEAD / LAG AND RATE CIRCUITS IN 492-3265 REACTOR PROTECTION SYSTEMS.
IN NRR/ DEST UNINTENTIONAL FUEL POOL Vern Hodge (301) 08/16/88 SPLB DRAINAGES.
492-1169 GL NRR/DLPO SAFETY PARAMETER DISPLAY Dick (301) 09/15/88 SYSTEM - ACCEPTABLE METHODS Eckenrode 492-1014 OF IMPLEMENTING REQUIREMENTS GL RES/DE SAFETY RELATED MOTOR OPERATED Owen (301) 10/01/88 EIB VALVE TESTING AND INSPECTION Rothberg 492-3815 GL NRR/ DEST INSTRUMENT AIR SYSTEM William (301) 08/16/88 SPLB PROBLEMS AFFECTING SAFETY Lefave 492-0062 RELATED EQUIPMENT IN RES/EME LIMITOROUE SMA SPRING Jerry (301) 09/03/88 DEFORMATION Weidenhamer 492-3839 IN NRR/DOEA CHANGE IN FORMAT FOR NRC Vern Hodge (301) 10/01/88 OGCB GENERIC COMMUNICATIONS 492-1169 GL RES/DE SIPPLEMENT TO GENERIC LETTER John (301) 12/01/88 SSEB 87-11 DEALING WITH ARBITRARY O'Brien 492-3928 INTERMEDIATE PIPE RUPTURE REQUIREMENTS GL NRR/ DEST REQUIREMENTS FOR RESOLUTION W C Lyon (301) 08/31/88 SRXB OF GI99 FOR OPERATION WITH 492-0891 LOWERED RCS INVENTORY AND FOR RELATED ISSUES
Pcg3 No.
2 f
08/04/88 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP ORIGIN.
SUBJECT CONTACT PHONE ISSUE OFFICE DATE i
d f
4 CL NRR/ DEST INSERVICE INSPECTION OF WS (301) 01/30/89 ENTB PRESSURE RETAINING WELDS IN Hazelton 492-0911 THE REACTOR VESSEL t
l GL AEOD LICENSEE COMMITMENTS FOR John (301) 08/30/88 EMERGENCY RESPONSE DATA Hickman 492-4155 i
SYSTEM (ERDS) IMPLEMENTATION GL NRR/ DEST NRR RECOMMENDATION ON ISI 0F Chen P Tan (301) 12/30/08 ESGB MARK I L !! STEEL 492-0829 l
CONTAINMENTS, REFUELING CAVITIES & ASSOC DRAINAGE SYS f
IN NRR/DREP HIGH RADIATION HAZARDS FROM Charles (301) 09/01/88 RPB INCORE DETECTORS Hinson 492-3148 GL RES/DRPS INDIVIDUAL PLANT EXAMINATION Farouk (301) 08/15/08 RHFB FOR SEVERE ACCIDENT Eltawila 492-3543 VULNERABILITIES - 10 CFR 50.54 GL NRR/ DEST RESOLUTION OF GENERIC ISSUE Om P Chopra (301) 10/30/88 i
I SELB B-56, DIESEL RELIABILITY 492-0835 l
i GL NRR/ DEST INSERVICE TESTING 50R PUMPS Ted (301) 09/03/88 l
EMEB AND VALVES Sullivan 492-0901 I
IN AEOD TESTING PRESSURIZER SAFETY Mary S (301) 08/12/88 l
VALVES WITH LOOP SEAL FILLED Wegner 492-7818 USING AN HYDRAULIC ASSIST DEVICE l
i i
GL NRR/DOEA LINE ITEM TECHNICAL Tom Dunning (301) 08/08/08 l
j OTSB SPECIFICATION IMPROVEMENT -
492-1189 REMOVAL OF FIRE PROTECTION
}
REQUIREMENTS j
i GL NRR/DOEA LINE ITEM TECHNICAL Tom Dunning (301) 09/01/88 j
OTSB SPECIFICATION IMPROVEMENT -
492-1189 j
REMOVAL OF CYCLE SPECIFIC t
PARAMETER LIMITS t
c GL NRR/DOEA LINE ITEM TECH SPEC Wayne (301) 09/15/08 j
OTSB IMPROVEMENT-RELOCATION OF Meinke 492-3152 RADIOLOGICAL EFFLUENT REQUIREMENTS TO OFFSITE DOSE CALCULATION MANUAL
]-
I GL NRR/DOEA LINE ITEM TECHNICAL Tom Dunning (301) 10/15/88 I
OTSB SPECIFICATION IMPROVEMENT -
492-1189 I
{
REMOVAL OF COMPONENT LISTS I
~ - -
Pcg3 N3.
3 08/04/88 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP ORIGIN.
SUBJECT CONTACT PHONE ISSUE OFFICE DATE 7
IN NMSS/AB EVALUATION OF EXTERNAL Harriet (301) 09/01/88 EXPOSURE READINGS OF LICENSEE Karagiannis 492-0633 i
PERSONNEL DOSIMETERS IN REO!ON V FIRE IN PENETRATION SEALS Vern Hodge (301) 08/16/88 492-1169 IN NRR/DRIS INADEQUATE FIRE DAMPER Joe (301) 09/30/88 VIB OPERABIL'TY TESTS UNDER AIR Petrosino 492-0979 FLOW CONDITIONS IN NRR/DRIS POTENTIAL MANUFACTURER Joe (301) 10/30/88 VIB DEFECTS IN CUTLER HAMMER E-30 Petrosino 492-0979 v
SWITCHES PANUFACTURED PRIOR TO A CERTAIN DATE IN NRR/ DEST RECENT DISCOVERY OF Jack (301) 09/01/88 SPLB PHENOMENON NOT PREVIOUSLY Kudrick 492-0871 CONSIDERED IN THE DESIGN OF SECONDARY CONTAINMENT PRESSURE CONTROL IN REGION FAILURE OF AMP-KYNAR SPLICES A. S.
(312) 08/15/08 III AND THOMAS & BETTS NYLON WIRE Gautam 790-5523 CAPS DURING EQUIPMENT OUALIFICATION TESTING IN NRR/DREP IMPROPER USE OF FLASHING Tom Essig (301) 08/23/88 RPB LIGHTS FOR HIGH RADIATION 492-1146 AREA CONTROLS SL NRR/ DEST MINIMUM EDGE DISTANCE FOR J Ma & R (301) 11/01/88 ESGB INSTALLATION OF ANCHORS IN Lipinski 492-1376 CONCRETE IN NRR/ DEST PROBLEMS IN VARIOUS EJ (301) 09/01/88 EMEB LICENSEE'S CHECK VALVE Sullivan 492-0901 TESTING PROGRAMS o
IN NRR/ DEST THERMAL STRATIFICATION P T Kuo (301) 08/30/88 EMEB INDUCED OVERSTRESS CONDITION 492-0907 OF SURGE LINE PIPING AT e
TROJAN IN NRR/ DEST WATERFORD MSIV PROBLEMS DUE Ken Dempsey (301) 08/15/08 MEB TO FAILED GUIDE RAIL BOLTS 492-0918 IN NRR/DRIS SUPP TO IN 87-33: 10CFR PART JJ (301) 09/30/88 VIB/PDRI 21 ISSUES REGARDING Petrosino 492-0979 S
INADEOUATELY PERFORMED EVALUATIONS OF DEVIATIONS &
NONCONFORMANCES
Pcgo No.
4 08/04/88 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP ORIGIN.
SUBJECT CONTACT PHONE ISSUE l
OFFICE DATE IN NRR/DRIS VALVE FRICTION FORCE JJ (301) 10/30/88
(
VIB/PDRIS CALCULATION METHODS IN REGARD Petrosino 492-0979 c.
TO VALVE OPERATOR SIZING IN NRR/ DEST DIRECTION DEPENDENT LEAK James (301) 08/15/88 SPLB CHARACTERISTICS OF Pulsipher 492-0877 l
CONTAINMENT PURGE VAtVES IN NRR/DRIS DEFECTIVE MOTOR SHAFT KEYS IN Jeff (301) 08/15/88 RVIB LIMITOROUE MOTOR ACTUATORS Jacobson 492-0996 i
IN AEOD THE REPORTING OF SAFETY VALVE Mary S.
(301) 09/08/88 AND SAFETY-RELIEF VALVE Wegner 492-7818 EVENTS PURSUANT TO 10 CFR l
50.73 GL NRR/DREP CHANGE IN THE REGULATORY John (301) 10/03/88 PRPB LIMIT FOR OCCUPATIONAL Buchanan 492-1097 EXPOSURE OF THE SKIN TO BETA RADIATION FROM HOT PARTICLES l
IN NMSS ACTIONS TAKEN TO DATE ON Michael (301) 10/01/88 DLLWD/TB TOPICAL REPORTS ON LOW LEVEL Tokar 492-0590 l
WASTE FORMS AND HIGH INTEGRITY CONTAINERS j
IN NRR/DRIS MAPTON INSULATION USED IN Richard C.
(301) 08/31/88 VIB ELECTRICAL CONTAINMENT Wilson 492-0997 PENETRATION CIRCUITS GL NRR/DLPG OPERATOR LICENSING John Hannon (301) 08/12/88 I
OLB EXAMINATION SCHEDULING 492-1031 IN NMSS INDUSTRIAL RADIOGRAPHY M.
Lamastra (301) 08/15/88 IMNS INSPECTION AND ENFORCEMENT 492-3416 I
IN NMSS SHIPMENT OF CONTAMINATED A.
W.
(301) 11/15/08 SGTR/DB EQUIPMENT BETWEEN NUCLEAR Grella 492-3381
(
POWER STATIONS 4
1 19fl961911 Ijy))}cElktictssak}$10;svcs h
g;ggcas i
g/r P1-122