ML20153C849

From kanterella
Jump to navigation Jump to search
Ack Receipt of Ltr Re Plant.Coomission Decision Authorizing Low Power Testing & Fuel Loading First Step in Review. Earthquake-related Issues Will Be Addressed in Detail by Commission
ML20153C849
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/12/1981
From: Bradford P
NRC COMMISSION (OCM)
To: Stanners S
AFFILIATION NOT ASSIGNED
Shared Package
ML20151Y970 List: ... further results
References
FOIA-87-444 NUDOCS 8805090004
Download: ML20153C849 (1)


Text

.

-m_,

e

  1. o UNITED STATES NUCLEAR REGULATORY COMMISSION y

g W ASHIN GTON, D.C. 20Sf 5

{

g

%,...../

November 12, 1981 OPFCEOPTHE COMMISSIONER l

Ms. Susan Stanners 2722 Honolulu #11 l

Montrose, CA 91020

Dear Ms. Stanners:

Tnank you very much for your. letter regarding Diablo Canyon. The recent Cont,sion decision authorizing low-power testing and fuel loading i

is only the first step in Comission review of this plant. Specifically, i

the earthquake-related issues that distinguish Diablo Canyon from most I

other nuclear units have not yet been addressed in detail by the Commission.

1 They will be reviewed before operation above five percent power is authorized.

i While it may have some symbolic importance, a decision to authorize low-power testing poses very little danger to the public. The power level is so low that the operators have more than ample time to react to 4

any problems in the plant, and the amount of radioactivity existing in the core does not begin to build up until the plant has operated for l

i quite a while, i

j Sincerely, h/

Peter A. Bradford Comissioner 0

8805090004 000418 PDR FOIA HAMLIN87-444 PDR I

(

~