ML20153C803

From kanterella
Jump to navigation Jump to search
Notice of Consideration of Issuance of Amend to License DPR-72,revising Tech Specs to Provide Specific Actions to Be Taken When One Battery Supplying Dc Control Power to 230 Kv Switchyard Breakers Inoperable & Revising Time Limit
ML20153C803
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/22/1988
From: Silver H
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20153C776 List:
References
NUDOCS 8805060322
Download: ML20153C803 (2)


Text

' '..

1 7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION FLORIDA POWER CORPORATION DOCKET NO. 50-302 NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE l

The U.S. Nuclear Regulatory Comission (the Commission) has issued Amendment No. 106 to Facility Operating License No. ORP-72 to the Florida Power Corporation (the licensee), which revised the Technical Specifications for operation of the Crystal River 3 Nuclear Generating Plant, located in Citrus County, Florida.

The amendment was effective as of the date of its i

issuance.

The amendment revised the Technical Specifications to provide specific i

actions to be taken when ore of the batteries supplying D.C. control power to t

the 230 kv switchyard breakers is inoperable, and revised the time the plant may operate with one inoperable battery.

The amendment also more explicitly defined the surveillances to be performed in Modes 5 and 6.

The application for amendment complies with the standards and require-ments of the Atomic Ene'gy Act of 1954, as amended (the Act), and the Comission's rules and regulations.

The Comicsion has made appropriate findings as required by the Act and the Comission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.

Notice of Consideration of issuance of Amendment and Opportunity for Hearing in connection with this action was published in the FEDERAL REGISTER on March 22, 1988 (53 FR 9386).

8805060322 880422 PDR ADOCK 05000302 P

PDR

\\

te 1

2 Also in conneci:fon with this action, the Comission prepared an Environ-mental Assessment and Finding of No Significant impact, which was published in the FEDERAL REGISTER on April 19, 1988 (53 FR 12836).

For further details with respect to the action, see (1) the application for arendment dated January 20,1988,(2) Amendment No.105 to License No. DPR-72, and (3) the Comission's related Safety Evaluation.

All of these items are available for public inspection at the Comission's Public Dor.ument Room,1717 H Street, N.W., Washington, D.C., and at the Crystal River Public Library, 668 N.W., First Avenue, Crystal River, Florida 32529.

Dated at Rockville, Maryland this 22nd day of April

,1988.

FOR THE NUC AR REGULATORY COMMIS? ION

/

Harle ect Manager Proje Directorate li-2 Division of Reactor Projects.I/Ti Office of Nuclear Reactor Regulation

.