Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151Q266 + (ML20151Q266)
- ML20151Q269 + (ML20151Q269)
- 05000219/LER-1988-006, :on 880325,four Isolation Condenser Pipe Break Sensors Tripped.Caused by Past Mod & Switch Problems. Switches Adjusted within Tech Spec Limits & Four Reactor Protection Sys Digital Sensors to Be Replaced + (ML20151Q270)
- PNO-I-88-080, on 880730,auto Struck State of Nj Worker W/ Portable Density Gauge.Leak Test Will Be Performed on Gauge. Gauge Will Be Sent to Troxler Electronic Lab for Repair + (ML20151Q275)
- ML20151Q279 + (ML20151Q279)
- 05000328/LER-1988-031, :on 880705,main Control Room Hydraulic Pressure Indicator Performed Irradically.On 880708,main Control Room Alarm Came On.Caused by Acceptance Criteria Not Clearly Stating Required Actions.Procedure Revised + (ML20151Q281)
- ML20151Q285 + (ML20151Q285)
- ML20151Q286 + (ML20151Q286)
- ML20151Q289 + (ML20151Q289)
- ML20151Q292 + (ML20151Q292)
- ML20151Q293 + (ML20151Q293)
- ML20151Q295 + (ML20151Q295)
- CEO-88-118, Requests Updating Svc List,Replacing R Moore & R Ruana W/L Houghtby + (ML20151Q296)
- ML20151Q298 + (ML20151Q298)
- TXX-1014, Discusses Engineering Contractor & Util Engineering Responsibilities & Organizational Structure + (ML20151Q302)
- ML20151Q308 + (ML20151Q308)
- ML20151Q309 + (ML20151Q309)
- ML20151Q311 + (ML20151Q311)
- ML20151Q317 + (ML20151Q317)
- ML20151Q319 + (ML20151Q319)
- ML20151Q322 + (ML20151Q322)
- ML20151Q325 + (ML20151Q325)
- ML20151Q328 + (ML20151Q328)
- ML20151Q333 + (ML20151Q333)
- ML20151Q335 + (ML20151Q335)
- ML20151Q338 + (ML20151Q338)
- TXX-8838, Final Deficiency Rept CP-88-29 Re Feedwater split-flow Bypass Valves (Fsbvs).Initially Reported on 880323. Westinghouse Requested to Perform Evaluation of Fsbv. Corrective Actions Scheduled for Completion by 881031 + (ML20151Q339)
- 05000366/LER-1988-009, :on 880321,local Leak Rate Test Missed Resulting in Condition Prohibited by Tech Specs.Caused by Personnel Error.Test Performed & Penetrations Declared Operable + (ML20151Q341)
- 05000341/LER-1988-014, :on 880320,Div I Emergency Diesel Generators Inadvertently Started.Caused by Procedural Error.Revs Issued Which Corrected Sequence of Steps + (ML20151Q343)
- ML20151Q344 + (ML20151Q344)
- 05000366/LER-1988-004, :on 880120,failure of Primary Containment Isolation Sys Penetrations & Hatches to Meet Tech Spec Leakage Requirements Determined.Caused by Normal Equipment Use & Wear.Affected Valves Replaced + (ML20151Q345)
- ML20151Q348 + (ML20151Q348)
- ST-HL-AE-2627, Discusses Highlights from 880405 Meeting Re as-built Reconciliation Program.Adequate Info Provided for NRC to Confirm That Design & Const Program Incorporated Features Per IE Bulletin 79-14 + (ML20151Q349)
- ML20151Q352 + (ML20151Q352)
- ML20151Q359 + (ML20151Q359)
- ML20151Q362 + (ML20151Q362)
- PNO-I-88-057D, on 880624,order Issued to Neutron Products Re Inadequate Monitoring of Workers Leaving Restricted Area.As of 880802,almost All Offsite Contamination Surveys Complete. Small Fixed Contamination Noted on Employee Mattress + (ML20151Q370)
- 05000344/LER-1988-022, :on 880704,Train a Safety Injection Initiated During Plant Heatup.Caused by Spurious Electronic Spike on One Pressurizer Pressure Channel Generated When Test Switch Placed in Test.Troubleshooting Conducted + (ML20151Q372)
- ML20151Q374 + (ML20151Q374)
- ML20151Q376 + (ML20151Q376)
- ML20151Q379 + (ML20151Q379)
- ML20151Q383 + (ML20151Q383)
- 05000327/LER-1987-001-01, Informs of Complete Implementation of Recurrence Control Commitment Re LER 87-001-01, Trip Setpoint for Acbs on Shutdown Boards That Feed Control & Auxiliary Bldg Vent Boards Incorrect Due to Design Error + (ML20151Q390)
- ML20151Q397 + (ML20151Q397)
- ML20151Q401 + (ML20151Q401)
- ML20151Q403 + (ML20151Q403)
- ML20151Q405 + (ML20151Q405)
- ST-HL-AE-2694, Submits Description of Rev to FSAR Section 14.2 on Initial Startup Test Program,Deleting Test 27, Static Rcca Drop & Rcca Below-Bank Position Measurement Test + (ML20151Q412)
- ML20151Q415 + (ML20151Q415)
- B12982, Responds to 880707 Request for Addl Info Re Spent Fuel Pool Capacity Expansion + (ML20151Q424)
- ML20151Q428 + (ML20151Q428)