Provides Info Re Criteria Used in Evaluating short-term Piping Sys Acceptability When Discrepancies Found Between Design of Sys & as-built Configuration
ML20151Q295
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 07/29/1988
From: Musolf D
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8808110105
Download: ML20151Q295 (2)


Text

  • a Northern States Power Company 414 Neokt Mall Menneapoks. Minnesota 55401 Telephone. (612) 330-5500 July 29, 1988 Director of Nuclear Reactor Regulation U S Nuclear Regulatory Commission Attn:

Document Control Desk k'ashington, DC 20555 PRAIRIE ISIMD NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR 42 50-306 DPR-60 j

i Criteria for Determining Justification for Continued Operation k' hen Encountering "As.%ilt" Discrepancies k'hich Cause Significant Increases in Seismic Stresses The purpose of this letter is to provide information requested by Mr Dominic Dilanni, NRC Senior Project Manager, during a meeting on June 13, 1988 at the Prairie Island Nuclear Generating Plant related to criteria used in evaluating short-term piping system acceptability when discrepancies are found between the design of a system and its "as-built" configuration.

Draft criteria used as guidance in evaluations to justify continued operation of the affected unit were provided to NRC Region III on June 8, 1988.

The followinb information is submitted to clarify the use of the draft criteria:

1. The criteria will be used when necessary in evaluations to determine if contir.aed plant operation is justified until unit operating conditions permit modifications to be made.
2. The criteria will be used on a case-by-case basis during the continuing review and analysis process for compliance with IE i

Bulletin 79-14 acceptance criteria that have been agreed to and followed by the NRC Region III technical reviewers.

3. System operability is taken into consideration when evaluating justification for continued operation.
4. The proposed hanger / support criteria meet the base plate criteria established for lE Bulletin 79 02.

This criteria has been reviewed by the Region III technical reviewer.

O i o 8808110105 880729 PDR ADOCK 05000282 P

PNU

Director of NRR Northern States Power Company i

July 29, 1988 Page 2 Please contact us if you have any questions related to the information we have provided, 8

M w.

David Musolf Manager Nuclear Support Services c: Regional Administrator, Region III, NRC NRC Sr Resident Inspector NRC Project Manager G Charnoff

-