Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20150B091 + (ML20150B091)
- ML20150B092 + (ML20150B092)
- ML20150B093 + (ML20150B093)
- ML20150B095 + (ML20150B095)
- ML20150B096 + (ML20150B096)
- ML20150B100 + (ML20150B100)
- IR 05000155/1988002 + (ML20150B103)
- ML20150B104 + (ML20150B104)
- ML20150B106 + (ML20150B106)
- TXX-8827, Final Deficiency Rept CP-87-91 Re Overload Capacity of Startup Transformers.Initially Reported on 870903.Corrective Actions Described in 880111 Rept Will Be Completed by 880129 for Unit 1 & by Hot Functional Testing for Unit 2 + (ML20150B109)
- ML20150B111 + (ML20150B111)
- ML20150B116 + (ML20150B116)
- ML20150B118 + (ML20150B118)
- AECM-88-0110, Application for Amend to License NPF-29,requesting Extension of Implementation Date for Neutron Flux Monitoring Until Fourth Refueling Outage for Installation of Incore Sys to Meet Reg Guide 1.97.Fee Paid + (ML20150B119)
- ML20150B122 + (ML20150B122)
- ML20150B123 + (ML20150B123)
- ML20150B127 + (ML20150B127)
- ML20150B130 + (ML20150B130)
- ML20150B133 + (ML20150B133)
- ML20150B137 + (ML20150B137)
- ML20150B140 + (ML20150B140)
- ML20150B142 + (ML20150B142)
- ML20150B145 + (ML20150B145)
- ML20150B147 + (ML20150B147)
- ML20150B149 + (ML20150B149)
- ML20150B150 + (ML20150B150)
- ML20150B153 + (ML20150B153)
- ML20150B158 + (ML20150B158)
- ML20150B161 + (ML20150B161)
- ML20150B163 + (ML20150B163)
- ML20150B164 + (ML20150B164)
- ML20150B166 + (ML20150B166)
- 05000457/LER-1988-006, :on 880210,auxiliary Feedwater Pump 2A Auto Started.Caused by Personnel Error.Exit Procedure & Pump Initial Conditions re-established & Operator Retrained in Correct volt-Ohm Meter Application + (ML20150B168)
- CEO-88-080, Forwards Presentation Matl Provided to NRC During 880701 Meeting Re Power Ascension Program Status + (ML20150B169)
- NL-88-704, Forwards Endorsements 1 to ANI Policy X88157 & Maelu Policy XTA5261 + (ML20150B178)
- ML20150B182 + (ML20150B182)
- ML20150B183 + (ML20150B183)
- NL-88-291, Forwards Updated Schedule for NRC Open Item Closure + (ML20150B186)
- ML20150B190 + (ML20150B190)
- ML20150B191 + (ML20150B191)
- 05000344/LER-1988-001, :on 880108,reactor Trip Occurred Due to Spurious Overpowered Delta Temp Trip Signal on One Channel. Caused by Failed Transistor in Channel lead-lag Amplifier. Transistor Replaced & Instrumentation Calibr + (ML20150B192)
- PNO-IV-88-054, on 880705,reactor Shut Down to Commence 99-day Planned Outage to Replace Fasteners Associated W/Helium Circulators.Licensee Schedule Calls for Return to Operations on 881007.Region IV Prepared to Respond to Media Inquiries + (ML20150B196)
- ML20150B197 + (ML20150B197)
- ML20150B202 + (ML20150B202)
- ML20150B203 + (ML20150B203)
- ML20150B204 + (ML20150B204)
- ML20150B205 + (ML20150B205)
- ML20150B206 + (ML20150B206)
- ML20150B210 + (ML20150B210)
- ML20150B212 + (ML20150B212)
- ML20150B213 + (ML20150B213)