Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20149D523 + (ML20149D523)
- TXX-8812, Final Deficiency Rept CP-88-23 Re Design Groundwater Elevation.Initially Reported on 880121.Analysis to Validate Design of Category I Structures Completed & Design Mods to Prevent or Mitigate Leakage Due to Surface Runoff Planned + (ML20149D524)
- IR 05000214/1955002 + (ML20149D526)
- 05000423/LER-1988-003, :on 880116,emergency Diesel Generator Train B Started Due to Bumped Relay Allowing Test Signal to Commence Emergency Load Sequencing.Caused by Relay Failure.Procedures Changed to Remove Dependency on Relay + (ML20149D527)
- IR 05000298/1987029 + (ML20149D530)
- PNO-V-93-016, on 930828,plant Restarted After Refueling Outage That Proceeded Tube Rupture Event on 930314.Cause of Tube Rupture Was Due to Intergranular Attack.Unit 3 Operating at 100% Power + (ML20149D533)
- ML20149D534 + (ML20149D534)
- IR 05000334/1993016 + (ML20149D536)
- ML20149D537 + (ML20149D537)
- ML20149D539 + (ML20149D539)
- ML20149D540 + (ML20149D540)
- ML20149D542 + (ML20149D542)
- ML20149D543 + (ML20149D543)
- RBG-27379, Advises That Util Will Provide Suppl 6 to Startup Rept Before 880215 + (ML20149D545)
- ML20149D547 + (ML20149D547)
- ML20149D548 + (ML20149D548)
- IR 05000344/1987042 + (ML20149D550)
- ML20149D551 + (ML20149D551)
- ML20149D553 + (ML20149D553)
- W3P88-0171, Forwards Payment of Indemnity Fee for 880209-890208,as Documented in Encl Invoice + (ML20149D557)
- ML20149D558 + (ML20149D558)
- IR 05000295/1993017 + (ML20149D560)
- ML20149D561 + (ML20149D561)
- 05000309/LER-1988-001, :on 880105,unscheduled Reactor Trip Occurred on Loss of Load Following Main Turbine Trip.Caused by Heater Drain Tank Low Level Switch Failure Due to Corrosion of Switch Float.Switch & Float Replaced on 880105 + (ML20149D564)
- PNO-V-87-085A, on 880104,State of Wa Reported That Contamination Caused by Vehicle Accident Cleaned Up & Stevens Highway Reopened on 871231.Contaminated Debris & Irradiated Hardware Being Repackaged by Us Ecology,Inc + (ML20149D565)
- ML20149D567 + (ML20149D567)
- ML20149D568 + (ML20149D568)
- ML20149D571 + (ML20149D571)
- PNO-III-93-052, on 930914,reactor Scram & Concurrent Loss of Offsite Power Occurred Caused by Failure of Station Auxiliary Transformer.Power Was Supplied & Two of Three Emergency Diesels Restored to Standby Condition + (ML20149D573)
- ML20149D576 + (ML20149D576)
- ML20149D579 + (ML20149D579)
- ML20149D582 + (ML20149D582)
- ML20149D583 + (ML20149D583)
- ML20149D585 + (ML20149D585)
- IR 05000293/1993014 + (ML20149D587)
- ML20149D588 + (ML20149D588)
- ML20149D589 + (ML20149D589)
- ML20149D591 + (ML20149D591)
- ML20149D593 + (ML20149D593)
- ML20149D596 + (ML20149D596)
- ML20149D597 + (ML20149D597)
- IR 05000333/1992099 + (ML20149D598)
- ML20149D599 + (ML20149D599)
- ML20149D603 + (ML20149D603)
- ML20149D605 + (ML20149D605)
- ML20149D606 + (ML20149D606)
- 05000498/LER-1987-022, :on 871206,control Room Toxic Gas Monitors Inoperable.Caused by Inadequate Training Program for Toxic Gas Monitoring Sys Operation & Channel Checks.Monitor Operation Training & Logging Procedure Planned + (ML20149D608)
- ML20149D609 + (ML20149D609)
- JAFP-88-0099, Responds to NRC Compliance Bulletin 87-002.All safety- Related & Nine non-safety Related Fasteners within Required Specs.Specs for Three non-safety Related Fasteners Not Met, Listed.Supporting Info Encl + (ML20149D611)
- PNO-I-88-002, on 880106,damage to Shielding of Irradiator Resulting in Small Radiation Beam (8 M/H) Occurred.Caused by Personnel Error.Radiation Beam Blocked W/Lead Brick + (ML20149D614)
- ML20149D615 + (ML20149D615)