Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PY-CEI-NRR-0819, Responds to NRC Re Violations Noted in Insp Rept 50-440/87-13.Corrective Actions:Engineering Evaluations Performed for Each Concern Which Reverified Qualification of Subj Equipment.Civil Penalty Paid + (ML20148C027)
- ML20148C028 + (ML20148C028)
- ML20148C029 + (ML20148C029)
- ML20148C032 + (ML20148C032)
- ML20148C035 + (ML20148C035)
- ML20148C037 + (ML20148C037)
- ML20148C038 + (ML20148C038)
- ML20148C039 + (ML20148C039)
- ML20148C041 + (ML20148C041)
- ML20148C043 + (ML20148C043)
- ML20148C044 + (ML20148C044)
- ML20148C045 + (ML20148C045)
- ML20148C046 + (ML20148C046)
- ML20148C047 + (ML20148C047)
- ML20148C050 + (ML20148C050)
- ML20148C053 + (ML20148C053)
- ML20148C054 + (ML20148C054)
- ML20148C057 + (ML20148C057)
- ML20148C058 + (ML20148C058)
- ML20148C059 + (ML20148C059)
- ML20148C060 + (ML20148C060)
- ML20148C062 + (ML20148C062)
- ML20148C063 + (ML20148C063)
- ML20148C064 + (ML20148C064)
- ML20148C065 + (ML20148C065)
- ML20148C067 + (ML20148C067)
- ML20148C069 + (ML20148C069)
- ML20148C071 + (ML20148C071)
- ML20148C072 + (ML20148C072)
- ML20148C073 + (ML20148C073)
- IR 05000309/1997001 + (ML20148C074)
- ML20148C075 + (ML20148C075)
- ML20148C078 + (ML20148C078)
- ML20148C079 + (ML20148C079)
- ML20148C081 + (ML20148C081)
- ML20148C083 + (ML20148C083)
- PNO-I-87-108B, on 871118,FBI Arrested Six Individuals Accused of Drug Distribution at Plant.Based on Util Review of Info from trial,16 People Were Implicated.Util Terminated Four Employees & Intends to Terminate Seven Other Employees + (ML20148C084)
- ML20148C085 + (ML20148C085)
- ML20148C086 + (ML20148C086)
- ML20148C089 + (ML20148C089)
- ML20148C090 + (ML20148C090)
- B16418, Responds to 970411 NRC Ltr Re Violations Noted in Insp Repts 50-245/97-01,50-336/97-01 & 50-423/97-01.Corrective Actions: Implemented Steps to Reinforce Mgt Expectations Re RCA Entry,Protocol & Dosimetry Requirements at Unit 2 + (ML20148C091)
- ML20148C092 + (ML20148C092)
- ML20148C093 + (ML20148C093)
- ML20148C095 + (ML20148C095)
- 1CAN038805, Requests 60-day Extension to 880501 for Submittal of Addl Info Re Comparison of Design Liner Strains Versus Calculated Liner Strains at Elevated Reactor Bldg Temp + (ML20148C099)
- ML20148C100 + (ML20148C100)
- ML20148C101 + (ML20148C101)
- ML20148C102 + (ML20148C102)
- 05000457/LER-1988-007-01, :on 880216,reactor Vessel Flange Inner O-ring Leak Detection Manual Isolation Valve 2RC80698 Discovered Closed.Caused by Personnel Error.Sys Configuration Restored to Required Lineup + (ML20148C103)
- ML20148C104 + (ML20148C104)