Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20140G318 + (ML20140G318)
- ML20140G320 + (ML20140G320)
- ML20140G323 + (ML20140G323)
- ML20140G324 + (ML20140G324)
- ML20140G325 + (ML20140G325)
- ML20140G326 + (ML20140G326)
- 05000327/LER-1985-025, :on 850601,noble Gas Sample Not Taken at Required Frequency.Caused by Analyst Failure to Collect Sample Every 8 H.Analyst Counseled & Sample Taken + (ML20140G328)
- ML20140G329 + (ML20140G329)
- ML20140G330 + (ML20140G330)
- ML20140G331 + (ML20140G331)
- ML20140G333 + (ML20140G333)
- ML20140G334 + (ML20140G334)
- ML20140G335 + (ML20140G335)
- ML20140G336 + (ML20140G336)
- PNO-V-85-038, on 850626,press Conference Held to Announce That Nine People Charged W/Felony Sale of Drugs Offsite as Result of 8 Months Undercover Drug Investigation.No Licensee Employees Charged + (ML20140G338)
- ML20140G339 + (ML20140G339)
- ML20140G341 + (ML20140G341)
- ML20140G343 + (ML20140G343)
- HL-5418, Requests That Due Date of RAI Re SFP Regulatory Analysis Be Extended to 970623 + (ML20140G344)
- ML20140G345 + (ML20140G345)
- ML20140G347 + (ML20140G347)
- ML20140G348 + (ML20140G348)
- ML20140G349 + (ML20140G349)
- ML20140G350 + (ML20140G350)
- ML20140G351 + (ML20140G351)
- ML20140G352 + (ML20140G352)
- ML20140G354 + (ML20140G354)
- ML20140G355 + (ML20140G355)
- ML20140G356 + (ML20140G356)
- CY-97-058, Responds to NRC Re Violations Noted in Insp Rept 50-213/97-01.Corrective Actions:Counseled Individuals on Importance of Never Operating Red Tagged Equipment & Wrote Temporary Procedure Change to Wcm 2.1-2, Tr/Job Scoping + (ML20140G358)
- ML20140G360 + (ML20140G360)
- ML20140G361 + (ML20140G361)
- ML20140G362 + (ML20140G362)
- ML20140G363 + (ML20140G363)
- ML20140G364 + (ML20140G364)
- ML20140G366 + (ML20140G366)
- ML20140G367 + (ML20140G367)
- ML20140G368 + (ML20140G368)
- ML20140G369 + (ML20140G369)
- ML20140G370 + (ML20140G370)
- ML20140G372 + (ML20140G372)
- 05000346/LER-1985-007, :on 850323,auxiliary Feedwater Pump Did Not Meet 40 Response Time Requirement.Caused by Rate at Which Turbine Accelerated to Full Speed of 3,600 Rpm.Internal Speed Setting Bushing Replaced + (ML20140G373)
- ML20140G374 + (ML20140G374)
- ML20140G377 + (ML20140G377)
- ML20140G379 + (ML20140G379)
- ML20140G381 + (ML20140G381)
- ML20140G383 + (ML20140G383)
- ML20140G384 + (ML20140G384)
- NSD-NRC-97-5107, Forward Rev 12 to GW-GL-021, AP600 SSAR (Vols 1-11). Revised Tables of Contents,Change Page Instructions,List of Effective Pages,Document Cover Sheet & Change Roadmap Outlining Changes in Section Also Encl + (ML20140G390)
- ML20140G394 + (ML20140G394)
- ML20140G406 + (ML20140G406)