NOV 181977 ENORANDUM FOR:
A. J. Mattson, Director Division of Systess Safety FROM:
R. L. Tedesco, Assistant Director for Plant Systems DSS
SUBJECT:
PRELIMINARY NOTIFICATION OF CATEGORY A TASK ACTION PLAN SCHEDULE AND SCOPE CHANGES 1
In our continuing effort to keep you infomed of the status of the Task Action Plans for which DSS has the Lead Resoonsibility, we are providing the following with relation to anticipatdd or known changes.
As soon as the change procedure is issued by the TASC we will initiate the necessary fomal requests.
StM ERY TABLE TAP Number Task Number A Schedule New Date Change A-8 1 through 5 3 months 7/3/78 completion A-19 1
3 months 1/1/80 cospletten A-23 1 through 4 7 weeks 2/17/78 completion A-30 1, 3 through 10 3 months 8/15/78 completion A-39 1.5,3.a.3.bM.a 3 months 1/7/77 start 2
2.a & 2.b 6 months 1/1/79 start 2.c 3 months 3/1/78 start TAP A Mart II Program The short tem program of this plan has been seriously impacted due to the Mark II anners group not providing information as originally scheduled. As a result, a major portion of the initiation of the plan 2
has been delayed accordingly. This delay is from the original date of
)
October 3,1977 to at least an optimistic December 9,1977. In addition, j
we are experiencing a problem with support review effort from the SEB uhich me are still trying to resolve. The cambination of these delays l
1s estimated to result in an overall three month delay in the short tem program. There appears to be no way em can recover this loss in time. This slip will affect the completion date for the short tem program by at least three months.
0604020234 060114 NRES 5-665 PDR i
x's N change i
Th s m
R. J. Mattson tion Syste 4/1/78me interval.
from to CarJputer Protec from 1/1/78entially the o
providereason of sa s bean delayedmilestones by essinformation to The basicthe ANO-2 re view A 19 Digital due le is beh nd scheduschedule duled.
1 of the plan ha of ble if theoriginally scheompletion TAP i
other the Taskwill affectupamay be possi view on the c
re i
i
- ~
as is the Th s inforwat on in 1
come Task m
l makesources Engineering syste.oviding critica
~~
is that w
me vie.
So outside OL re
~
for the delaythe Combu tionapplicant n t pred to during the will 4 co pletionTh s indicates s
o
~~ ~ -~ -
m i
we to originally agre Test ng
- 2. 3 andthe pla. find nchange the i
n o
to s
t.eak A 23 Containmen 11/16/77. Tasks can i
shown in We these for r the m thosew be 2/17/78The baserated as pe s
ompleted7 weeks frowill nTask 1. incorpo TAP o
c be I will of the plan ly be lost completingTASC and will slip approximate Task n
that completio the 11/8/77 ct ve dated Power Suppl %
ver the time is ith scheduleBranches.
We re discussed w i
reco DC ew Related i to Consittee's direSafety The proposed n5/15/78 will sl p ing we s
es duled. f the participat change most of these r the Comm acy of of A 30 Adequ is being res heorigin l compleThe bases forc o
date e
c chain tion concurrence TAP be in The Task planin thethe a
8/15/78. d will Dynamic ntly of TASC an Pool anticipate that curre date the Yalve (SRV)inme nts aniopt:misticdiscussed with11/8/77 Relieffor CWR ot providing Conta of ct1we dated with re&ctionmonths.
GE n Safety were Tamperature Limits to of be two to three he dire months delayedto probiens tion A 39 Deter ina be estimated six will m
nd are being slip will a
Task 2.c Loads dude ally schedule 4.a TAP b and cello tests.II owner's gro u s ast an dule le in Italy.
resultant scheby at Tasks 1.b. 3.a. 3. in i
t of the Mont test Mark be delayedCaorso orig as I and The informationdata. 2.b will from theto postponemen Mark test and data the by the Tasks 2.areceivingmonths duecontrolled due to delayed threeinfonmation is This x
N
r i
l l
R. J. Mattson '
TAP A Digital Casoputer Protection System Task 1 of the plan has been delayed fmm 1/1/78 to 4/1/78. This change will affect the other milestones by essentially the same interval.
Some make upamay be possible if the information to be provided from outside sources come in as originally scheduled. The basic reason for the delay is that Task 1 is the completion of the ANO-2 review of the Combustion Engineering system. This review is behind schedule due to the applicant not providing critical information on the schedule -
originally agreed to during the OL review.
TAP A-23 4tainment -teak -Testing Task I will be completed 11/16/77. Tasks 2, 3 and 4 cospletion will i
slip approximately 7 weeks from those shown in the plan. This indicates that completion of the plan will now be 2/17/78. We can find no way to recover the time lost completing Task 1.
The bases for these changes were discussed with the TASC and will be incorporated as per the Cosarittee's directive dated 11/8/77.
tap A Adequacy of Safety Related DC power Supplies The Task plan is being rescheduled. The proposed new schedule is currently in the concurrence chain of the participating Branches. We anticipate that the original completic.1 date of 5/15/78 will slip to anioptimistic date of 8/15/78. The bases for most of these changes were discussed with the TASC and will be incorporated as per the Committees directive dated 11/8/77.
TAP A Determination of Safety Relief Valve (SRV) pool Dynamic Loads and Temperature Limits for BWR Containments Tasks 1.b. 3.a. 3.b and 4.a are being delayed he to GE not providing information as originally scheduled due to problems with tw&ction of the test data. The resultant schedule slip will be tuo.to three months.
Tasks 2.a and 2.b uill be delayed by at least an estimated six months due to receiving data fram the Caorso test in Italy. Task 2.c will be delayed three months due to postponement of.the Monticello tests.
This information is controlled by the Mark I and Mark II owner's groups.
0 5
R. J. Mattson.
The schedules for Tasks 1 and 3 are trying to be maintained by the Task Manager.
duct slip of six months for Task 2 and two months for Task 4.The ot In addition, a scope change concerning GE Part 21 Notification and a change in Task Managers is being circulated for participating branches concurmnces.
- k. 1. M edesco ~ Assistant 11 rector for Plant Systems Division of Systems Safety j
cc:
F. Schmeder i
W. Minners l
T. Ippolito F. Rosa G. Lainas J. Shepaker
?
C. Anderson
?
T. Su R. Fitzpatrick L. Beltacchi J. Glynn C. Long DISTRIBtJTION:
. CENTRAL FILE NRR READING PS READING CLONG READING DSS:A3PS DSS,:ADPS CLong:51 RTedesco 11/18/77 11/ /77 e
-