Submits Anticipated or Known Changes to Listed Task Action plans.Short-term Program of Task Action Plan A-8, Mark II Program, Delayed Due to Mark II Owners Group Not Providing Info on Schedule
ML20140G372
Person / Time
Issue date: 11/18/1977
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Mattson R
Office of Nuclear Reactor Regulation
Shared Package
ML20140F372 List: ... further results
References
FOIA-85-665, REF-GTECI-A-08, REF-GTECI-A-19, REF-GTECI-A-23, REF-GTECI-A-30, REF-GTECI-A-39, REF-GTECI-CO, REF-GTECI-EL, REF-GTECI-IS, TASK-A-08, TASK-A-19, TASK-A-23, TASK-A-30, TASK-A-39, TASK-A-8, TASK-OR NUDOCS 8604020234
Download: ML20140G372 (3)


Text

1 1

l l

NOV 181977 ENORANDUM FOR: A. J. Mattson, Director Division of Systess Safety FROM: R. L. Tedesco, Assistant Director for Plant Systems DSS

SUBJECT:

PRELIMINARY NOTIFICATION OF CATEGORY A TASK ACTION PLAN SCHEDULE AND SCOPE CHANGES 1

In our continuing effort to keep you infomed of the status of the Task Action Plans for which DSS has the Lead Resoonsibility, we are providing the following with relation to anticipatdd or known changes.

As soon as the change procedure is issued by the TASC we will initiate the necessary fomal requests.

StM ERY TABLE TAP Number Task Number A Schedule New Date

' Change A-8 1 through 5 3 months 7/3/78 completion A-19 1 3 months 1/1/80 cospletten A-23 1 through 4 7 weeks 2/17/78 completion A-30 1, 3 through 10 3 months 8/15/78 completion A-39 1.5,3.a.3.bM.a 2 3 months 1/7/77 start 2.a & 2.b 6 months 1/1/79 start 2.c 3 months 3/1/78 start l TAP A Mart II Program The short tem program of this plan has been seriously impacted due to l the Mark II anners group not providing information as originally

! scheduled. As a result, a major portion of the initiation of the plan 2

has been delayed accordingly. This delay is from the original date of )

October 3,1977 to at least an optimistic December 9,1977. In addition, j we are experiencing a problem with support review effort from the SEB  ; '

.! uhich me are still trying to resolve. The cambination of these delays -

l l

1s estimated to result in an overall three month delay in the short tem program. There appears to be no way em can recover this loss in time. This slip will affect the completion date for the short tem program by at least three months.

0604020234 060114 NRES 5-665 PDR i .

x's N change m Thi s tion Syste R. J. Mattson to 4/1/78me sa interval.

o from CarJputer Protec from 1/1/78entially providereason the of Digital view le due A 19 s bean delayedmilestones duled.of The basicthe byANO-2 essinformation re to TAP 1 of the plan hable if theoriginally the other c is beh i scheompletion review i on the nd scheduschedule

- ~

Taskwill affectupamay in as 1 be Th possi i

come Task is the m l s inforwat on

~~

Some makesources isEngineering that syste view .

.oviding- critica ~

outside OL re n twill o the for the delaythe Combu- tionapplicant s ~~ ~ -~ -

4 com pletionTh i pred wes to to during indicates to the Testing n o s originally agre t .eak i

2. 3 andthecan pla . find nchange for these We shown in r the A 23 Containmen 11/16/77.

m thosew o

Tasks s be 2/17/78The baserated as pe TAP ompleted7 weeks frowill nTask 1. incorpo be c ly Task I will of the plan be lost completingTASC and will slip approximate n that completioith the 11/8/77 ver the time Power Suppl % is We reco re discussed w ct ve dated i

DC ew scheduleBranches. i to we Related ing s es Consittee'sacydire of Safety The proposed duled. f the participat n5/15/78 change will sl p of A 30 Adequ c o chain tion date most of e these r the Com TAP The Task is being res heorigin l compleThe bases forc planin concurrence thethe a

be in ntly of 8/15/78. d will Dynamic Pool curre anticipate that date the TASC an nts aniopt:misticdiscussed with11/8/77 YalveConta (SRV)inme ot providingof were ct1we dated Safety Relieffor CWRto GE n dire of he with re&ctionmonths.

m Tamperaturedelayedto tion Limits be probiens two tomonths three be Deter ina and are being TAP A 39 Loads 4.a dude slip will estimated Task 2.c six willus b andally schedule dule le ast an in Italy. cello tests.II owner's gro i

orig resultant schebytest at Tasks 1.b. as The 3.a. 3. in t ofI the be delayedCaorso and Mont Mark informationdata.

test and data 2.b fromwilltheto postponemen by the Mark the Tasks 2.areceivingmonths duecontrolled due to is delayed threeinfonmation This x N

r i

l I

l l

l R. J. Mattson I 1

TAP A Digital Casoputer Protection System Task 1 of the plan has been delayed fmm 1/1/78 to 4/1/78. This change will affect the other milestones by essentially the same interval.

Some make upamay be possible if the information to be provided from outside sources come in as originally scheduled. The basic reason for the delay is that Task 1 is the completion of the ANO-2 review of the Combustion Engineering system. This review is behind schedule due to the applicant not providing critical information on the schedule -

originally agreed to during the OL review.

TAP A-23 4tainment -teak -Testing Task I will be completed 11/16/77. Tasks 2, 3 and 4 cospletion will i slip approximately 7 weeks from those shown in the plan. This indicates -

that completion of the plan will now be 2/17/78. We can find no way to recover the time lost completing Task 1. The bases for these changes were discussed with the TASC and will be incorporated as per the Cosarittee's directive dated 11/8/77.

tap A Adequacy of Safety Related DC power Supplies The Task plan is being rescheduled. The proposed new schedule is currently in the concurrence chain of the participating Branches. We anticipate that the original completic.1 date of 5/15/78 will slip to anioptimistic date of 8/15/78. The bases for most of these changes were discussed with the TASC and will be incorporated as per the Committees directive dated 11/8/77.

TAP A Determination of Safety Relief Valve (SRV) pool Dynamic Loads and Temperature Limits for BWR Containments Tasks 1.b. 3.a. 3.b and 4.a are being delayed he to GE not providing information as originally scheduled due to problems with tw&ction of the test data. The resultant schedule slip will be tuo.to three months.

Tasks 2.a and 2.b uill be delayed by at least an estimated six months due to receiving data fram the Caorso test in Italy. Task 2.c will be delayed three months due to postponement of .the Monticello tests.

This information is controlled by the Mark I and Mark II owner's groups.

l 0

5 l

R. J. Mattson .

The schedules Task Manager. for Tasks 1 and 3 are trying to be maintained by the duct slip of six months for Task 2 and two months for Task 4.The ot In addition, a scope change concerning GE Part 21 Notification and a change concurmnces. in Task Managers is being circulated for participating branches

k. 1. M edesco ~ Assistant 11 rector for Plant Systems Division of Systems Safety j cc: F. Schmeder i

W. Minners T. Ippolito l F. Rosa G. Lainas J. Shepaker

?

C. Anderson

? T. Su R. Fitzpatrick L. Beltacchi

, J. Glynn C. Long DISTRIBtJTION:

. CENTRAL FILE NRR READING PS READING CLONG READING DSS:A3PS DSS,:ADPS CLong:51 RTedesco 11/18/77 11/ /77 .

e

.. .. -