Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138R378 + (ML20138R378)
- ML20138R379 + (ML20138R379)
- ML20138R380 + (ML20138R380)
- ML20138R381 + (ML20138R381)
- ML20138R383 + (ML20138R383)
- IR 05000309/1985035 + (ML20138R384)
- ML20138R385 + (ML20138R385)
- ML20138R386 + (ML20138R386)
- ML20138R387 + (ML20138R387)
- ML20138R389 + (ML20138R389)
- ML20138R390 + (ML20138R390)
- IR 05000263/1985025 + (ML20138R393)
- IR 05000346/1985033 + (ML20138R396)
- ML20138R397 + (ML20138R397)
- ML20138R398 + (ML20138R398)
- ML20138R399 + (ML20138R399)
- IR 05000272/1985029 + (ML20138R401)
- ML20138R403 + (ML20138R403)
- ML20138R404 + (ML20138R404)
- B11853, Submits Addl Info Re SER Confirmatory Item 66 Concerning Implementation of Program to Address NUREG-0737 Task Action Plan Item III.D.1.1.Hydrogen Recombiners Will Be Tested on Refueling Outage Basis.Two Preoperational Tests Performed + (ML20138R405)
- ML20138R406 + (ML20138R406)
- RBG-22602, Confirms Human Engineering Discrepancies Scheduled for Completion Prior to Exceeding 5% Rated Power Per + (ML20138R407)
- ML20138R408 + (ML20138R408)
- IR 05000354/1985053 + (ML20138R410)
- PNO-II-85-121, on 851221,safety Equipment in Southeast Diagonal Room of Reactor Bldg Flooded W/Torus Water.Caused by Open Flow Path Through Disassembled RHR Pump Suction Valve.Water Removed & Rooms Decontaminated + (ML20138R412)
- ML20138R413 + (ML20138R413)
- ML20138R414 + (ML20138R414)
- AECM-85-0414, Discusses License Condition 2.C.25(b) Requiring Util to Submit Evaluation & Actions on Tdi Owners Group Design Review & Quality Revalidation.Submittal Cited as Fulfilling Util Portion of License Condition + (ML20138R415)
- ML20138R416 + (ML20138R416)
- ML20138R417 + (ML20138R417)
- ML20138R419 + (ML20138R419)
- ML20138R420 + (ML20138R420)
- ML20138R422 + (ML20138R422)
- ML20138R425 + (ML20138R425)
- ML20138R426 + (ML20138R426)
- IR 05000454/1985046 + (ML20138R428)
- IR 05000295/1985038 + (ML20138R429)
- ML20138R430 + (ML20138R430)
- ML20138R431 + (ML20138R431)
- IR 05000346/1985035 + (ML20138R434)
- 05000259/LER-1985-014, :on 850405,19,22,0501 & 24,while in Refueling/ Maint Outage,Diesel Generator & Shutdown Board Battery Racks Found Unqualified.Caused by Installation Errors.Racks Modified & Design Drawings Revised + (ML20138R435)
- ML20138R437 + (ML20138R437)
- ML20138R439 + (ML20138R439)
- BECO-85-228, Forwards Rev 0 to Procedure 1.3.4-10, Writers Guide for Emergency Operating Procedures, Validation Procedure for Emergency Operating..., in Response to + (ML20138R440)
- ML20138R441 + (ML20138R441)
- ML20138R443 + (ML20138R443)
- RBG-22600, Notifies That Specific Analysis Re Conformance to Final Rule 10CFR50.44(c)(3)(vii) on Hydrogen Control Will Be Completed by 870331.Enhancements Will Be Implemented by End of First Refueling Outage + (ML20138R445)
- IR 05000324/1985033 + (ML20138R446)
- IR 05000919/2011018 + (ML20138R448)
- ML20138R449 + (ML20138R449)
- ML20138R450 + (ML20138R450)