ML20138R413

From kanterella
Jump to navigation Jump to search
Commits to Modify Traversing in-core Probe Nitrogen Purge Line Design to Comply W/Gdc 56.Formal Exemption Request & Amend to License NPF-43 for Interim Mod to Enhance Isolation Capability Will Be Submitted During Wk of 860106
ML20138R413
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/20/1985
From: Jens W
DETROIT EDISON CO.
To: Adensam E
NRC
References
VP-85-0238, VP-85-238, NUDOCS 8512310268
Download: ML20138R413 (2)


Text

..

Wayne H.Jena s

b' Vce Presgjent N

Nuclear Operatons j

Detroit

,e,r.m 6400 North Ome Highway W8tM Nuclear

( )

Operations December 20, 1985 VP-85-0238 Director of Nuclear Reactor Regulation Attn:

Ms. Elinor G. Adensam, Chief Licensing Branch No. 1 Division of Licensing U..S.

Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Ms. Adensam:

Reference:

1)

Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43 2)

NRC Letter to Detroit Edison, " Isolation Requirements for Primary Containment 4

Penetration X-35G", dated November 21, 1985 3)

Detroit Edison Letter to NRC, " Primary i

Containment Penetration X-35G", VP-85-0222, dated December 3, 1985 i

Subject:

TIP Purge Line Submittal In Reference 2 the NRC had identified a concern with the design of traversing in-core probe'(TIP) nitrogen purge line.

The NRC had indicated that the current design did not meet the requirements of General Design Criterion (GDC) 56.

Detroit Edison has reviewed the design of this line and commits to modify it prior to restart from the first scheduled refueling outage to provide compliance with GDC 56.

An interim modification will be implemented prior J

to restart from the current outage to attain an enhanced isolation capability for this line to allow continued startup and operation of Fermi 2 through the first fuel cycle.

Because this interim modification will not provide full compliance with GDC 56 Detroit Edison will provide both a formal exemption request and an amendment to Operating Lic ense NPF-43 in a' submittal which will be.

provided to the NRC the week of January 6, 1986.

B512310268 851220 (LIAW)

PDR ADOCK 00000341 h

' EB PSB (L. 181LMAN)

P PDR EICSB (SRINIVASAN)

RSS (ACTING) 0 F08 (VASSAL 14)

AD - G. LAINAS (Ltr only)

Ms. Elinor G. Adensan December 20, 1985 VP-85-0238 Page 2 Please direct any questions to Mr. Robert L.

Woolley at (313) 586-4211.

Sincerely, k