December 17, 1985 Docket No. 50-302 DISTRIBUTION HSilver Docket File RWeller NRC PCR Ringram L PDR ACRS-10 Mr. Walter S. Wilgus PPD-6 Rdg Gray File Vice President, Nuclear Operations FMiraglia EBrach Florida Power Corporation OELD H0rnstein ATTN: Manager, Nuclear Licensing Edordan BMozafari
& Fuel Management BGrimes JPartlow P. O. Box 14042; M.A.C. H-3 St. Petersburg, Florida 33733
Dear Mr. Wilgus:
We have reviewed your submittal concerning the Safety Parameter Display System (SPDS) for Crystal River linit 3 dated August 30, 1984 It has been determined that additional information is needed to complete our evaluation of this matter. The requested information is contained in the enclosure.
Please provide the requested information within 30 days of receipt of this letter.
Sincerely, N;. ;::u:. u m 34 J v..n. ; w,
- John F. Stolz Ofrector PWR Project Directorate #6 l
l Division of PWR Licensing-B
Enclosure:
As Stated cc w/ enclosure:
See next page
))'Its d'
jfl.
PRD-6 PBl-6 PE D'-6
.u BMozafarincr.hr9Weller JStolz
!?//f/85 12/l7/85 1247 /85 0512310230 0D1217 l'DH ADOCK 05000302 F
PDH
I i
\\
l Mr. W. S. Wilgus Crystal River Unit No. 3 Nuclear Florida Power Corporation Generating Plant cc:
!!r. R. W. i!ciser State Planning and Cevelopment Senior Vice President Clearninghouse and General Counsel 4
Florida Power Corporation Office of Planning and Budget Executive Office of the Governor 1
j P. O. Box 14042 The Capitol Building St Petersburg, Florida 33733 Tallahassee, Florida 32301
/
Nuclear Plant Manager Mr. Wilbur langely, Chairman l
Florida Power Corporation Board of County Comissioners a
P. O. Box 219 Citrus County Crystal River, Florida 32629 Inverness,. Florida 36250 Mr. Robert B. Borsum Babcock & Wilcox t:uclear Pcwer Generation Pivisien Suite 220, 7910 Weodmont Avenue Bethesda, Maryland 20814 Resident inspector i
U.~S. Nuclear Regulatory Commission Route #3, Box 717 Crystal River, Florida 32629 Regional' Administrator, Revion !!
/
U.S. lluclear Regulatory Comission 101 Farietta Street, Suite 3100 j
Atlanta, Georgia 30303 i
Mr. Allan Schubert, Manager Public Health Physicist bepartment of Health and Rehabilitative Services 1323 Winewood Blvd.
Tallahassee, Florida 32301 Administrator r
Departnent of Environmental Pegulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Attorney General
{
Department of Legal Affairs t
The Capitol
(
Tallahassee, Florida 32304
~
I y
.j, REQUEST FOR ADDITIONAL INFORMATION i.
CONCERNING THE CRYSTAL RIVER UNIT 3 SAFETY PARAMETER DISPLAY SYSTEM i
Each operating reactor shall be provided with a Safety Parameter Display System (SPDS). The Comission approved requirements for an SPDS are defined in NUREG-0737, Supplenient 1.
In the Regional workshops on Ceneric Letter 82-33
}
held during March 1983, the NRC discussed these requirements and the staff's h
review of the SPDS.
The staff reviewed the SPDS safety analysis a'nd supplemental documents provided by Florida Power Corporation (Reference 1). The staff was unable to complete the review because of insufficient information. The following additional in-1 formation is required to continue and complete the review:
j f
INSTRUMENTATION AND CONTROL SYSTEMS BRANCH
!sokationDevices Provide the following:
I a.
For the type of device used to accomplish electrical isolation, describe ib the specific testing perfonned to demonstrate that the' device is accept-l
{
ableforitsapplication(s). This description should include elementary
)
diagrams when necessary to indicate the test configuration and how the maximum credible faults were applied to the devices.
u 5
j....
2 b.
Data to verify that the maximum credible faults applied during the test were the maximum voltage / current to which the device could be exposed,
(
and define how the maximum voltage / current was determined.
Data to verify that the maximum credible fault was applied to the output c.
ofthedeviceinthetransversemode(betweensignal.andreturn)and
. other faults were considered (f.o., open and short circuits).
d.
Define the pass / fail acceptance criteria for each type of device.
Provide a commitment that the isolation devices comply with the environ-e.
f ment qualifications (10CFR 50.49) and with the seismic. qualifications which were the basis for plant licensing.
f.
Provide a description of the measures taken to protect the safety systems from electrical interference (i.e., Electrostatic Coupling, EMI, Common Mode and Crosstalk) that may be generated by the SPOS.
c l
REFERENCE:
l 1.
Letter from G. R. Westafor (3F0884 08) to J. F. Stolz, dated August 30, 1984.
I l