Physical Security Insp Repts 50-295/85-38 & 50-304/85-40 on 851028-1101 & 13.No Noncompliance Noted.Major Areas Inspected:Security Plan,Physical Barriers & Detection Aids. Details Withheld (Ref 10CFR73.21)
ML20138R429
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/23/1985
From: Creed J, Drouin B, Earnest A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20138R419 List:
References
50-295-85-38, 50-304-85-40, NUDOCS 8512310278
Download: ML20138R429 (2)


Text

. N U. S. NUCLEAR REGULATORY COMMISSION l

REGION III l l

Reports No. 50-295/85038(DRSS); 50-304/85040(DRSS)

Docket Nos. 50-295; 50-304 Safeguards Group IV Licenses No. DPR-39; DPR-48 Licensee: Commonwealth Edison Company P. O. Box 767 Chicago, IL 60690 Facility Name: Zion Nuclear Station, Units 1 and 2 Inspection At: Zion Station, Zion, IL

Inspection Conducted: October 28 through November 1, 1985, and

'

November 13, 1985 Date of Last Physical Security Inspection: July 22-25, 1985 Type of Inspection: Unannounced Physical Protection Inspection Inspectors: 9Ebhh B. Drouin t?)n \8i Date Physical Security Inspector gg. Q (A n\MI si A. B. Earnest Date Physical Security Inspector Approved By: p / /vfd3/8[

[J. R. Creed,-Chief Date'

' Safeguards Section Inspection Summary Inspection on October 28 through November 1 and November 13, 1985 (Reports No. 50-295/85036(ORSS); No. 50-304/85040(DRSS))

Areas Inspected: Included a review of the Security Plan and Implementing Procedures; Management Effectiveness; Security Organization; Records and Reports; Testing and Maintenance; Physical Barriers - Vital and Protected Areas; Lighting; Compensatory Measures; Assessment Aids; Access Control -

i Personnel, Packages, and Vehicles; and Detection Aids - Vital and Protected Areas. The inspectors reviewed licensee's actions relating to weaknesses identified in previous inspection reports and those weaknesses which were

"

Dbk$$djjj5 $?~ ' 3 PATI 0ll PDk U9 0n Scy;: rat lon This Page is Decontrolled

f~

. s identified as a result of the Region III Safeguards Analysis Program. The inspectors also reviewed allegations communicated to the Region III office on October 10, 1985 and allegations communicated during the course of this inspection. The inspection involved 76.5 inspector-hours by two NRC inspector Two inspector-hours were expended during back-shif Results: The licensee was found to be in compliance with NRC requirements within the fifteen areas examined during this inspectio One open item was noted regarding the design of the turbine building vent One unresolved item concerning assessment aids was identified and forwarded to HQ NRC for resolution. The allegations reviewed during this inspection were unsubstantiated. The results of the allegation review are enclosed in the non-safeguards information appendix. Concerns were developed in the areas of vital area barriers, compensatory measures, assessment aids, and personnel access control (Details: UNCLASSIFIED SAFEGUARDS INSPECTION)

Encle:uro Contafns hfEctgpOSINroaMATION