ML20138R443

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Procedure 1.3.4-10, Writers Guide for Emergency Operating Procedures, Validation Procedure for Emergency Operating..., in Response to 850219 Ltr
Date released: 05/31/2020 Download: ML20138R443


Emergency Operating Procedures Verification.
ML20138R460
Person / Time
Site: Pilgrim
Issue date: 10/26/1984
From: Mathis C
BOSTON EDISON CO.
To:
References
Download: ML20138R460 (13)
Validation Procedure for Emergency Operating Procedures.
ML20138R455
Person / Time
Site: Pilgrim
Issue date: 03/08/1984
From: Mathis C
BOSTON EDISON CO.
To:
References
Download: ML20138R455 (24)
Rev 0 to Procedure 1.3.4-10, Writers Guide for Emergency Operating Procedures.
ML20138R450
Person / Time
Site: Pilgrim
Issue date: 07/19/1985
From: Mathis C
BOSTON EDISON CO.
To:
References
Download: ML20138R450 (40)
Forwards Rev 0 to Procedure 1.3.4-10, Writers Guide for Emergency Operating Procedures, Validation Procedure for Emergency Operating..., in Response to 850219 Ltr
ML20138R440
Person / Time
Site: Pilgrim
Issue date: 12/26/1985
From: Harrington W
BOSTON EDISON CO.
To: ZWOLINSKI J A
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.C.1, TASK-TM
Download: ML20138R440 (13)