Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137Z664 + (ML20137Z664)
- ML20137Z667 + (ML20137Z667)
- ML20137Z668 + (ML20137Z668)
- ML20137Z669 + (ML20137Z669)
- ML20137Z671 + (ML20137Z671)
- ML20137Z672 + (ML20137Z672)
- 05000322/LER-1985-053, :on 851107,w/mode Switch in Shutdown & All Rods Inserted in Core,Determination Made That Temporary Procedure Change Notice Not Approved by Plant Manager within 14 Days. Notices Will Be Administratively Expedited + (ML20137Z675)
- ML20137Z677 + (ML20137Z677)
- ML20137Z678 + (ML20137Z678)
- ML20137Z679 + (ML20137Z679)
- ML20137Z680 + (ML20137Z680)
- ML20137Z683 + (ML20137Z683)
- ML20137Z684 + (ML20137Z684)
- ML20137Z685 + (ML20137Z685)
- ML20137Z686 + (ML20137Z686)
- ML20137Z688 + (ML20137Z688)
- ML20137Z689 + (ML20137Z689)
- IR 05000454/1986008 + (ML20137Z690)
- ML20137Z692 + (ML20137Z692)
- ML20137Z693 + (ML20137Z693)
- 05000250/LER-1985-025, :on 850827 & 30,during App R Safe Shutdown Review,Addl Circuits That May Require Protection,Rerouting or Circuit Mods Identified.Caused by Addl NRC Guidance.Fire Watch Expanded + (ML20137Z694)
- ML20137Z695 + (ML20137Z695)
- ML20137Z697 + (ML20137Z697)
- ML20137Z698 + (ML20137Z698)
- PNO-IV-85-061, on 851206,scheduled Maint Outage Will Begin. Replacement of Expansion Joint in Feedwater Heater & Repair of Main Generator Cooling Sys Hydrogen Leak Will Be Completed.Restart Scheduled for 851211 + (ML20137Z700)
- ML20137Z701 + (ML20137Z701)
- ML20137Z702 + (ML20137Z702)
- ML20137Z704 + (ML20137Z704)
- ST-HL-AE-1369, Clarifies That Stainless Steel Piping Will Be Used for ECCS Piping in Contact W/Borated Piping.Carbon Steel Piping May Be Used for Portions of ECCS Containing Nonborated Piping + (ML20137Z706)
- ML20137Z707 + (ML20137Z707)
- ML20137Z710 + (ML20137Z710)
- ML20137Z711 + (ML20137Z711)
- ML20137Z712 + (ML20137Z712)
- ML20137Z713 + (ML20137Z713)
- ML20137Z714 + (ML20137Z714)
- ML20137Z716 + (ML20137Z716)
- ML20137Z717 + (ML20137Z717)
- ML20137Z718 + (ML20137Z718)
- ML20137Z719 + (ML20137Z719)
- ML20137Z723 + (ML20137Z723)
- ML20137Z724 + (ML20137Z724)
- ML20137Z726 + (ML20137Z726)
- 05000029/LER-1983-013, :on 830413,due to Shifts in App G Curve, Determined That Events as Postulated in Original Design Basis Could Potentially Exceed Pressure Restrictions of Revised Curve.Caused by Personnel Error + (ML20137Z727)
- ML20137Z728 + (ML20137Z728)
- ML20137Z729 + (ML20137Z729)
- PNO-I-85-092, on 851205,PUC of State of PA Voted 3.2 Billion Dollar Cost Cap.Unit About 30% Complete.Restart of Const Planned in Jan 1986 Pending Board of Directors Approval.Fuel Load Planned for Early 1990 + (ML20137Z731)
- ML20137Z733 + (ML20137Z733)
- ML20137Z734 + (ML20137Z734)
- ML20137Z736 + (ML20137Z736)
- 05000416/LER-1985-042, :on 851102 & 23,ESF Bus Trips Occurred.Caused by Incorrect Wiring Configuration.Configurations Corrected + (ML20137Z737)
- ML20137Z739 + (ML20137Z739)