Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137G445 + (ML20137G445)
- ML20137G446 + (ML20137G446)
- ML20137G450 + (ML20137G450)
- PNO-IV-97-017, on 970324,Arkansas Nuclear One Initiated Loading of Third VSC-24 Canister for Storage of Spent Fuel at Plant Isfsi.Licensee Initiated Repair of Crack by Grinding Out Defective Area + (ML20137G452)
- ML20137G455 + (ML20137G455)
- ML20137G456 + (ML20137G456)
- ML20137G459 + (ML20137G459)
- ML20137G460 + (ML20137G460)
- PNO-IV-86-002D, on 860110,NRC Response Team Met W/Vendor to Discuss Plans for Decontamination of Ruptured Cylinder.Doe Expects Aerial Radiation Surveys to Be Completed by 860125 + (ML20137G461)
- ML20137G465 + (ML20137G465)
- ML20137G467 + (ML20137G467)
- ML20137G469 + (ML20137G469)
- ML20137G471 + (ML20137G471)
- ML20137G472 + (ML20137G472)
- ML20137G477 + (ML20137G477)
- ML20137G478 + (ML20137G478)
- ML20137G479 + (ML20137G479)
- ML20137G481 + (ML20137G481)
- ML20137G483 + (ML20137G483)
- ML20137G484 + (ML20137G484)
- ML20137G487 + (ML20137G487)
- ML20137G488 + (ML20137G488)
- ML20137G490 + (ML20137G490)
- ML20137G492 + (ML20137G492)
- ML20137G493 + (ML20137G493)
- ML20137G494 + (ML20137G494)
- IR 05000368/1985015 + (ML20137G495)
- ML20137G498 + (ML20137G498)
- ML20137G503 + (ML20137G503)
- ML20137G504 + (ML20137G504)
- ML20137G505 + (ML20137G505)
- ML20137G507 + (ML20137G507)
- ML20137G508 + (ML20137G508)
- ML20137G510 + (ML20137G510)
- ML20137G512 + (ML20137G512)
- ML20137G514 + (ML20137G514)
- ML20137G518 + (ML20137G518)
- 05000304/LER-1985-025-05, :on 851023,three Steam Generator D narrow-range Level Transmitters Found Out of Tolerance,Due to Instrument Drift Refueling Calibr.Transmitters Replaced Under Mod M22-1(2)-85-21 + (ML20137G519)
- ML20137G522 + (ML20137G522)
- ML20137G524 + (ML20137G524)
- B16307, Provides Response to Violations Noted in Insp Repts 50-245/96-13,50-336/96-13 & 50-423/96-13.Corrective Actions: Steam Tunnel Will Not Be Isolated from Reactor Bldg Since No Potential Exists for HELB Event to Ensure Compliance + (ML20137G525)
- ML20137G527 + (ML20137G527)
- ML20137G530 + (ML20137G530)
- PNO-I-86-002, on 860109,fire Protection Deluge Sys for Auxiliary Transformer Manually Actuated by Unknown Person at Local Fire Box.Caused by Intentional Act of Tampering or Harassment.Addl Security Patrols Instituted + (ML20137G531)
- 3F0397-19, Forwards Sys Readiness Review Plan & Schedule for Completion of Plan,Per Request + (ML20137G532)
- ML20137G536 + (ML20137G536)
- ML20137G537 + (ML20137G537)
- ML20137G540 + (ML20137G540)
- ML20137G541 + (ML20137G541)
- ML20137G545 + (ML20137G545)
- U-600359, Forwards Details Re Termination of Seismic Interaction Program Initiated in Response to Noncompliance Noted in Insp Rept 50-461/80-17 & FSAR Meb Item 3 + (ML20137G548)