ML20137G505

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1985. Related Correspondence
ML20137G505
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/30/1985
From: Smith P, Vandenberg D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC
References
CON-#186-516 OL, NUDOCS 8601210058
Download: ML20137G505 (5)


Text

__

t OPERATING DATA REPORT DOCKET NO 50-255 DATE 12-10-85 COMPLETED BY PASmith TELEPHONE (616)764-8913 OPERATING STATUS NOTES 1.

Unit Name: Palisades 2.

Reporting Period:

851101-851130 3.

Licensed Thermal Power (MWt):

2530 4.

Nameplate Rating (Gross MWe):

811.7 5.

Design Electrical Rating (Net MWe):

805 6.

Maximum Dependable Capacity (Gross MWe): **770 7.

Maximum Dependable Capacity (Net MWe):

    • 730 8.

If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:

9.

Power Level to Which Restricted, if any (Net MWe):

10.

Reasons for Restrictions, if any:

This Month Yr-to-Date Cumulative 11.

Ilours In Reporting Period 720 8,016 122,295 12.

Number of Hours Reactor Was Critical 709.1 7,490.2 68,299.9 13.

Reactor Reserve Shutdown Hours 14.

liours Generator On-Line 705.5 7344.4 64,958.7 15.

Unit Reserve Shutdown Hours 135,602,040 16.

Gross Thermal Energy Generated (MWH) 1,744,224 11,519,088 17.

Gross Electrical Energy Generated (MWH) 564,310 5,599,610 42,217,400 18.

Net Electrical Energy Generated (MWH) 535,440 5,301,797 39,741,360 19.

Unit Service Factor 98.0 91.6 53.1 20.

Unit Availability Factor 98.0 91.6 53.1 21.

Unit Capacity Factor (Using MDC Net) 101.9

  • 101.6~
  • 51.0 22.

Unit Capacity Factor (Using DER Net) 92.3 82.2 40.4 23.

Unit Forced Outage Rate 2.0 8.4 31.4 24.

Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):

25.

If Shut Down at End of Report Period, Estimated Date of Start Up: February 10,1985 26.

Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

OC0185-0001B-0P03 9601210059 851130 PDR ADOCK 05000255 R

PDR

4 i

AVERAGE DAILY UNIT POWER LEVEL i

1 DOCKET NO 50-255 UNIT Palisades I

DATE 12-10-85 COMPLETED BY PASmith TELEPHONE (616)764-8913 i

MONTH November 1985 e

i DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net)

I 1

753 17 762 2

765 18 756 i

3 766 19 752 4

763 20 765 5

762 21 767 1

6 765 22 768 7

765 23 767

)

8 757 24 768 i

j 9

765 25 768 t

10 767 26 766 11 765 27 766 12 767 28 767 13 760 29 768 14 759 30 171 4

15 759 16 761 INSTRUCTIONS:

l On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

OC0185-0001C-0F03

DOCKET NO.

50-255 UNIT SIRTIDOWNS AND POWER REDUCTIONS UNIT NAE Palisades DATE 12-10-85 COMPLETED BY PASmith REPORT MONTH November 1985 TELEPHONE (616)-764-8913 e

1 2

No.

Date Type Duration Reason Method of Licensee Systga Compogent Cause & Corrective (Hours)

Shuting Event Code Code Action to 3

Down Reactor Report #

Prevent Recurrence

+

15 113085 S

14.5 C

1 1.

2.

3.

4 5.

F: Forced Reason:

Method:

Exhibit C - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Re fueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)

(NUREC-0161)

E-Operator Training & License Examination F-Administrative C-Operational Error (Explain)

H-Other (Explain)

OC0185-0001D-OP03

s e a

SUMMARY

OF OPERATING EXPERIENCE FOR NOVEMBER 1985 The plant operated at essentially 98 percent power through November 29.

Cycle 6 was completed on November 30 when the plant was taken of f line at 0930 hours0.0108 days <br />0.258 hours <br />0.00154 weeks <br />3.53865e-4 months <br /> to perform a scheduled refueling outage.

i OC0185-0001E-OP03

Slb RELATED CORRESPONDENCE i

. Consumers Power

,,,y.

Company V

'85 DEC 16 All 57 Pa!4sades Nuclear Plant 27780 Blue Star Memorial Highway. Covert. MI 49043 December 10, 1985 j,,

US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 CC -

Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of November 1985.

\\f, 4

~

Dewey VanDenBerg Reactor Engineer CC: KMHaas, Palisades CHCoralski, Palisades JCKeppler, USNRC JRSchepers, Palisades KWBerry, P24-614B RAFenech, Palisades Resident Inspector, Palisades DLHackett, P11-228B LABrown, P21-317 GWBruckmann, Div of Radiological Health Services, Lansing, Michigan SMierzwa, Michigan Dept of Labor RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades EWRaciborski, P26-204A Document Control, 950*22*35*10/L GHG85-048 OC0185-0001A-OP03-OP06