Forwards Insp Rept 50-368/85-15 on 850428-30 & 1028-30.No Violation or Deviation Noted.Two Unresolved Items Listed in Insp Rept
ML20137G488
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/13/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Jeffery Griffin
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20137G493 List:
References
NUDOCS 8601210037
Download: ML20137G488 (2)


See also: IR 05000368/1985015

Text

r

.

-

e

&

In Reply Refer To: ,

Dockets: 50-368/85-15 g 13 gg;

Arkansas Power & Light Company

ATTN: John M. Griffin, Senior

Vice President - Energy Supply

P. O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Mr. J. I. Tapia of this office

during the period April 28-30 and October 28-30, 1985, of activities authorized

by NRC Operating License NPF-6 for Arkansas Nuclear One, Unit 2, and to the

discussion of our findings with members of your staff at the conclusion of the

inspection.

The area examined during the inspection covered the containment integrated

leakage rate test. Within this area, the inspection consisted of selective

examination of procedures and representative records, interviews with

personnel, and observations by the inspector. These findings are documented in

the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

Two unresolved items are identified in paragraph 2 of the enclosed inspection

report.

We have also examined actions you have taken with regard to a previously

identified inspection finding. The status of this item is identified in

paragraph 2 of the enclosed report.

RIV:RSB/0S

JITapia

RS8/OSkor/B

REIreltnd

RPB RSB i RPB k

DMHunn utt g DRHunter JEGag 'do

q l/)0/86 i /16 /86 l/JO/86 0 / //o /86 1//) I

9601210037 960113

" = ** R82"

gGo

I \

i

IT

.

-

.

.

. Arkansas Power & Light Company -2-

We apologize for any inconvenience that may have been caused by the late

issuance of this report. Should you have any questions concerning this

inspection, we will be pleased to discuss them with you.

Sincerely,

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosure:

Appendix - NRC Inspection Report

50-368/85-15

cc w/ enclosure:

J. M. Levine, General Manager

Arkansas Nuclear One

P. O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV: i

'

  • RPB * Resident Inspector R. D. Martin, RA
  • R&SPB *Section Chief (RSB/ES) *D. Weiss, LFMB (AR-2015)
  • RIV File DRSP *RSB
  • MIS SYSTEM *RSTS Operator TAPIA
  • w/766

.