ML20137G488
| ML20137G488 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 01/13/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Jeffery Griffin ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20137G493 | List: |
| References | |
| NUDOCS 8601210037 | |
| Download: ML20137G488 (2) | |
See also: IR 05000368/1985015
Text
r
.
-
e
&
In Reply Refer To:
,
Dockets:
50-368/85-15
g 13 gg;
Arkansas Power & Light Company
ATTN: John M. Griffin, Senior
Vice President - Energy Supply
P. O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Mr. J. I. Tapia of this office
during the period April 28-30 and October 28-30, 1985, of activities authorized
by NRC Operating License NPF-6 for Arkansas Nuclear One, Unit 2, and to the
discussion of our findings with members of your staff at the conclusion of the
inspection.
The area examined during the inspection covered the containment integrated
leakage rate test. Within this area, the inspection consisted of selective
examination of procedures and representative records, interviews with
personnel, and observations by the inspector.
These findings are documented in
the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
Two unresolved items are identified in paragraph 2 of the enclosed inspection
report.
We have also examined actions you have taken with regard to a previously
identified inspection finding.
The status of this item is identified in
paragraph 2 of the enclosed report.
RS8/OSkor/B
i
k
RIV:RSB/0S
RPB
RSB
RPB
JITapia
REIreltnd
DMHunn utt g DRHunter JEGag
'do
q
l/)0/86
i /16 /86
l/JO/86
0 / //o /86
1//)
I
9601210037 960113
- "
=
- R82"
gGo
I \\
i
.
-
.
.
. Arkansas Power & Light Company
-2-
We apologize for any inconvenience that may have been caused by the late
issuance of this report.
Should you have any questions concerning this
inspection, we will be pleased to discuss them with you.
Sincerely,
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosure:
Appendix - NRC Inspection Report
50-368/85-15
cc w/ enclosure:
J. M. Levine, General Manager
Arkansas Nuclear One
P. O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
i
'
- RPB
- Resident Inspector
R. D. Martin, RA
- R&SPB
- Section Chief (RSB/ES)
- D. Weiss, LFMB (AR-2015)
- RIV File
DRSP
- RSB
- MIS SYSTEM
- RSTS Operator
TAPIA
- w/766
.