Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000317/LER-1997-002, :on 970220,misread TS Requirements Resulted in Inadequate Test.Caused by Lack of Strict Adherence to Wording of Plants TS Requirements.Edgs 1B,2A & 2B Were Successfully Tested & Returned to Svc + (ML20137F085)
- ML20137F088 + (ML20137F088)
- ML20137F092 + (ML20137F092)
- ML20137F095 + (ML20137F095)
- ML20137F097 + (ML20137F097)
- ML20137F101 + (ML20137F101)
- 3F0397-10, Responds to NRC Re Violations Noted in Insp Rept 50-302/96-10.Corrective Actions:Effect of Lowering Fuel Assembly Upon Another Evaluated + (ML20137F102)
- ML20137F104 + (ML20137F104)
- NG-97-0499, Informs,As Required by 10CFR50.74,of Change in Operator License Status.G Kaegi Terminated Employment W/Ies Utils & Therefore No Longer Requires License + (ML20137F111)
- PY-CEI-NRR-0307, Forwards Addl Info Re Reg Guide 1.118 & Performance of Surveillance Testing,Per 850705 Request.Proposed Change to FSAR Table 1.8-1 Also Encl + (ML20137F112)
- ML20137F115 + (ML20137F115)
- U-600234, Submits Quarterly Update Re Const Schedule.Critical Path Schedule Analysis Indicates Limiting Sys Schedule for Leak Detection Sys,About 52 Days Behind.Scheduled Fuel Load Date Continues to Be 860103 + (ML20137F116)
- ML20137F119 + (ML20137F119)
- ML20137F120 + (ML20137F120)
- ML20137F124 + (ML20137F124)
- ST-HL-AE-1563, Requests Approval of Graded Radiological Emergency Exercise Scheduled to Begin in Feb 1987.Detailed Planning Schedule, Including Emergency Preparedness Appraisal in Fall 1986, Will Be Updated If Date Approved + (ML20137F125)
- ML20137F126 + (ML20137F126)
- ML20137F129 + (ML20137F129)
- ML20137F130 + (ML20137F130)
- IR 05000621/2009024 + (ML20137F131)
- ML20137F132 + (ML20137F132)
- ML20137F135 + (ML20137F135)
- PNO-II-97-019, on 970327,portable Filtration & Demineralization Unit from Chem-Nuclear Sys,Inc Missing Valve.Unknown How or Where Valve Dislodged.Nrc Region I & EPA Contacted + (ML20137F137)
- ML20137F138 + (ML20137F138)
- ML20137F139 + (ML20137F139)
- ML20137F142 + (ML20137F142)
- ML20137F144 + (ML20137F144)
- ST-HL-AE-5602, Provides Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves + (ML20137F146)
- ML20137F148 + (ML20137F148)
- B16358, Forwards Addl Info on Selected Items of Work Previously Performed by Util,Correction to Slide Presentation & Resumes for Contractor Selection for ICAVP + (ML20137F149)
- ML20137F155 + (ML20137F155)
- ML20137F156 + (ML20137F156)
- ML20137F157 + (ML20137F157)
- ML20137F166 + (ML20137F166)
- ML20137F167 + (ML20137F167)
- ML20137F170 + (ML20137F170)
- ML20137F171 + (ML20137F171)
- ML20137F177 + (ML20137F177)
- ML20137F182 + (ML20137F182)
- ML20137F188 + (ML20137F188)
- ML20137F189 + (ML20137F189)
- ML20137F190 + (ML20137F190)
- ML20137F194 + (ML20137F194)
- ML20137F200 + (ML20137F200)
- ML20137F204 + (ML20137F204)
- ML20137F206 + (ML20137F206)
- ML20137F208 + (ML20137F208)
- ML20137F210 + (ML20137F210)
- PNO-V-85-055, on 850820,initial Criticality Achieved W/Boron Concentration within Expected Acceptance Criteria for Estimated Critical Conditions.Low Power Physics Testing in Progress & Expected to Be Completed in 7 Days + (ML20137F211)
- ML20137F215 + (ML20137F215)
- ML20137F217 + (ML20137F217)