Advises That Revised Tech Specs,Reflecting Results of Surveillance Matls Testing & Fracture Toughness Analysis Tentatively Scheduled for Submittal by 860109 Via Util Ltr SL-161
ML20137F188
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 01/06/1986
From: Gucwa L
GEORGIA POWER CO.
To: Muller D
Office of Nuclear Reactor Regulation
References
2401N, SL-104, TAC-60542, NUDOCS 8601170467
Download: ML20137F188 (2)


Text

. - - .- --

Georgia Power Company 333 Piedmont Avenue

.. l Telephone 404 526 6526 Mamng Address.

Post Off;ce Box 4545 At anta, Georg:a 30302 b Georgia Power L. T. Gucwa w soomero mrrc wem i Manager Nuclear Engineer,ng and Chief Nuchar Eng neer SL-104 240lN Jamary 6,1986 Director of N2 clear Reactor Regulation Attention: Mr. D. Miller, Project Director BWR Project Directorate No. 2 Division of Boiling Water Reactor Licensing U. S. N2 clear Regulatory (bmission Washington, D. C. 20555 NRC DOO(ET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HA'IUI NUCLEAR PLANT UNIT 1 SURVEILLANCE MATERIAIS TESTING AND FRACIURE 'IOUGNESS ANALYSIS Gentlemen:

During the 1984 maintenance / refueling outage at Hatch Unit 1, one of the surveillance materials capsules was removed from the reactor pressure vessel for testing in accordance with the req 2irements of 10 CFR 50 Appendices G and H. %e remlts of the testing were received by Georgia Power (bmpany (GPC) from the vendor one year to the day after the capsule withdrawal. As a result, GPC was unable to mbmit the mmary technical report to the NRC within the one year time frame from capsule withdrawal specified in 10 CFR 50 Appendix H, Section III.A.

%e reason for the inability to mbmit the sumary technical report within the req 2 ired time frame was dismssed with the Hatch NRC licensing project manager, Mr. G. Rivenbark, daring a telephone conversation on December 9,1985 with Messrs. J. A. Edwards and J. D. Heidt of GPC. %e aforementioned GPC staff personnel indicated to Mr. Rivenbark that because of the necessity to perform an in-depth review of the test results, GPC would mbmit the realired sumary technical report to NRC within two (2) months, i.e. , by February 9,1986. It was further indicated that changes to the Hatch Unit 1 Technical Specifications would be req 2 ired as a result of the testing and that these proposed changes would be submitted to NRC under separate cover. GPC anticipated that these Technical Specification changes would be mbmitted in early Jamary 1986.

,\o S601170467 960106 ~

PDR ADOCM 05000321-

.P pm

GeorgiaPower A Director of N1 clear Reactor Regulation Attention: Mr. D. Miller, Project Director BWR Project Directorate No. 2

- Jamary 6,1986  ;

Page ' bro l

'Ihe revised 'Dechnical Specifications are tentatitrely schediled to be albmitted via GPC letter SL-161 by January 9,1986. Nineteen (19) copies of General Electric topical report NEDC-30997, "Edwin I. Hatch Riclear Power Plant, Unit 1, Reactor Presaire Vessel Surveillance Materials 'Desting and Fract11re 'Doughness Analysis," October 1985, which alpport.s this req 2est are also tentatively sched11ed for transmittal by Jamary 9,1986.

Should you have any glestions in this regard, please contact this office at your earliest convenience.

Sincerely yours, C

. T. G1 cwa JAE/mb xc: Mr. J. T. Beckham, Jr.

Mr. H. C. Nix, Jr.

Dr. J. N. Grace (NRC-Region II)

Senior. Resident Inspector uns