ML20137F177

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 85-24 Re Fractured Bolting on Diesel Generator Turbocharger.Initially Reported on 850610. Extension of Final Rept Due Date to 850918 Requested
ML20137F177
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/15/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-33205-TDS, DER-85-24, NUDOCS 8508260165
Download: ML20137F177 (2)


Text

,

yeJ*

RECEIVED NRC Arizorm Nuclear Power Project 1335 Aug I9 D5 P.O. BOX 5203e

  • PHOENIX, ARIZONA 85072-2034 August 15, 1985 REGION VfdE ANPP-33205 -TDS/TPS U. S. Nuclear Regulatory Comnission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. D. F. Kirsch, Acting Director Division of Reactor Safety & Projects

Subject:

Time Extension for Report - DER 85-24 A 50.55(e) Potentially Reportable Deficiency Relating To Fractured Bolting On Diesel Turbo Charger File:

85-019-026; D.4.33.2

Reference:

A) Telephone conversation between C. Sorenson and' T. Siegfried on June 10, 1985 B) ANPP-32974, dated July 10,1985 (Interim Report)

Dear Sir:

~

The NRC was notified of a potentially reportable deficiency in Refer-ence A and an Interim Report was transmitted by Reference B.

At that time, it was estimated that a Final Report would be available by August 14, 1985.

Due to the need for further evaluation of the root cause, it is n w

  • expected that this information will be finalized by September 18, 1985, at which time a cmplete report will be submitted.

There is no new information or change to the Interim Report at this tinu.

Very truly yours, b

OLLL GC E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/TPS/nj cc: See Page Two 8260165 850815 g

ADOCK 05000528 PDR o)0 M-A7

s,

[ g *;

August 13; 1985 Mr. D. F. Kirsch

- DER 85-24 Page 'No i

cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Cm mission Washington, D. C.

20555 D. B. Karner

-W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza i

D. E. Fowler T. D. Shriver C. N. Russo

{

J.'R. Bynum J.-M. Allen D. Canady A. C. Gehr G. A. Hierzer 4

W. G. Bingham 1

R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zinmerman M. L. Clyde B. T. Parker T. J. Bloom D. N. Stover J. D. Houchen J. E. Kirty Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339