Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137E815 + (ML20137E815)
- ML20137E818 + (ML20137E818)
- ML20137E820 + (ML20137E820)
- ML20137E821 + (ML20137E821)
- ML20137E828 + (ML20137E828)
- ML20137E829 + (ML20137E829)
- ML20137E833 + (ML20137E833)
- ML20137E839 + (ML20137E839)
- ML20137E844 + (ML20137E844)
- ML20137E848 + (ML20137E848)
- ML20137E849 + (ML20137E849)
- ML20137E851 + (ML20137E851)
- ML20137E852 + (ML20137E852)
- ML20137E853 + (ML20137E853)
- ML20137E854 + (ML20137E854)
- ML20137E858 + (ML20137E858)
- 05000295/LER-1997-004, Forwards LER 97-004-00 Re Failure to Start Pump in Required Time & Led to Declaring 1C Containment Spray Pump Inoperable + (ML20137E859)
- 05000316/LER-1985-034-01, :on 851024 & 30,high Alarms Received on Lower Containment Airborne Particulate Radiation Monitor Train B, Resulting in ESF Actuation Signal.Caused by Monitor Trending Upward.Setpoints Readjusted + (ML20137E863)
- ML20137E864 + (ML20137E864)
- ML20137E867 + (ML20137E867)
- B11939, Forwards Response to Request for Addl Info Re Isap Topic 1.19, Integrated Structural Analysis. Info Demonstrated Adequacy of Turbine Bldg Foundation to Resist SSE Loadings + (ML20137E870)
- ML20137E871 + (ML20137E871)
- ML20137E873 + (ML20137E873)
- ML20137E875 + (ML20137E875)
- 05000254/LER-1985-020-07, :on 851210,auto-start Signal Sent to Standby Gas Treatment Sys Due to Bypass of Fuel Pool Radiation Monitor 1A & Downscale Spike of Monitor 1B.Caused by Electronic Interference.Cable Rerouted + (ML20137E876)
- ML20137E881 + (ML20137E881)
- ML20137E882 + (ML20137E882)
- ML20137E887 + (ML20137E887)
- ML20137E888 + (ML20137E888)
- ML20137E889 + (ML20137E889)
- ML20137E890 + (ML20137E890)
- ML20137E893 + (ML20137E893)
- ML20137E897 + (ML20137E897)
- ML20137E901 + (ML20137E901)
- 05000295/LER-1997-004-04, :on 970221,identified Failure to Start Pump in Required Time & Led to Declaring 1C Containment Spray Inoperable.Caused by Clogged Fuel Filter & Defective components.1C Containment Spray Pump Fuel Drained & Flushed + (ML20137E905)
- ML20137E906 + (ML20137E906)
- B11655, Advises That Proposed Change to Axial Offsite Limits Will Be Requested for Cycle 14 to Allow 3-loop Operation at All Times During Cycle.Vendor Evaluation Indicated 4-loop Axial Offset Limits Not Always Conservative + (ML20137E909)
- A03410, Suppls Response to IE Bulletin 83-07 Re Apparently Fraudulent Products Sold by Ray Miller,Inc.Six Fittings Acceptable Per ANSI B16.3 & B16.5 Stds.Access to Remaining Three Fittings Dangerous But Fittings Determined Acceptable + (ML20137E911)
- 3F0397-15, Revises Completion Date for EOPs at Crystal River Unit 3 from 970331 to 970829.Completion of EOP Enhancements Required to Support Operating Crew Training + (ML20137E915)
- ML20137E916 + (ML20137E916)
- B11653, Submits Addl Info Re Methodology Used in Calculations of Drywell to Wetwell Vacuum Breaker Valve Dynamics in Response to Generic Ltr 83-08,per NRC Request.Further Calculations Found Vacuum Breakers Acceptable as Built + (ML20137E919)
- ML20137E920 + (ML20137E920)
- 05000423/LER-1997-022, :on 970218,improper Survillance Testing of CR Emergency Air Filtration Sys Filters Occurred.Caused by Lack of Trigger Mechanisms within Applicable Maintenance Procedures.Cr Air Filtration Sys Will Be Revised by 970315 + (ML20137E922)
- ML20137E923 + (ML20137E923)
- ML20137E926 + (ML20137E926)
- ML20137E931 + (ML20137E931)
- ML20137E932 + (ML20137E932)
- ML20137E933 + (ML20137E933)
- IR 05000415/2006027 + (ML20137E936)
- ML20137E937 + (ML20137E937)
- ML20137E938 + (ML20137E938)