ML20137E839
| ML20137E839 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 03/24/1997 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Dugger C ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20137E844 | List: |
| References | |
| NUDOCS 9703280276 | |
| Download: ML20137E839 (4) | |
See also: IR 05000382/1997002
Text
. . . . - - .
- =
-.
. _ -
_
.- - -.
.
.
. - .
..
. _ .
. .- --~
'
.
,
g* MC%,I*
UNITED STATES
, _
[(.
'
,e
NUCLEAR REGULATORY COMMISSION
$
HEGloN Iv
h' V[;,[
'
'a
611 RYAN PLAZA DRIVE, SUITE 400
I
%9....*/
ARLINGTON, T E XAS 76011-8004
- -
'
MAR 2 41997
j
.
f
,
,-l
Charles M. Dugger, Vice President
)
Operations - Waterford 3
4
Entergy Operations, Inc.
2
l
P.O. Box B
i
Killona, Louisiana 70066
,
.
SUBJECT:
NRC INSPECTION REPORT 50-382/97-02 AND NOTICE OF VIOLATION
l
,
Dear Mr. Dugger:
e
An NRC inspection was conducted January 12 through February 22,1997, at your
Waterford Steam Electric Station, Unit 3 reactor f acility. The enclosed report presents the
scope and results of that inspection.
During the 6-week period covered by this inspection period, your conduct of activities at
Waterford 3 was generally characterized by good performance of operations, maintenance,
,
engineering and plant support. However, two violations of NRC requirements were
identified.
\\
4
The violations involve the failure to perform radiological surveys and label radioactive
material, respectively, and are of concern because they resuited from inadequate oversight
j
during movement of radioactive material between storage locations,
The violations are cited in the enclosed Notice of Violation (Notice) and the circumstances
Please note that
j
surrounding the violations are described in detail in the enclosed report.
you are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements.
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
l
,
its enclosurels), and your response will be placed in the NRC Public Document Room
i
(PDR). To the extent possible, your response should not include any personal privacy,
proprietary, or safeguards information so that it can be placed in the PDR without
redaction.
1
A0kO000
(
'
DR
,.,
eon
,
_
.
-
.
.
.
Entergy Operations, Inc.
-2-
)
Should you have any questions concerning this inspection, we will be pleased to discuss
'
thern with you.
Sincerely,
.
T. P. Gwynn, Director
Division of Reactor Projects
Docket No.: 50-382
License No.: NPF-38
Enclosures:
1
2. NRC Inspection Report
50-382/97-02
cc w/ enclosures:
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Vice President, Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Wise, Carter, Child & Caraway
P.O. Box 651
l
Jackson, Mississippi 39205
General Manager, Plant Operations
Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
Manager - Licensing Manager
Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
.
.,
Entergy Operations, Inc.
-3-
Chairman
Louisiana Public Service Commission
One American Place, Suite 1630
Baton Rouge, Louisiana 70825-1697
Director, Nuclear Safety &
Regulatory Affairs
Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
William H. Spell, Administrator
Louisiana Radiation Protection Division
P.O. Box 82135
Baton Rouge, Louisiana 70884-2135
Parish President
St. Charles Parish
P.O. Box 302
Hahnville, Louisiana 70057
Mr. William A. Cross
Bethesda Licensing Office
3 Metro Center
Suite 610
Bethesda, Maryland 20814
Winston & Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3502
.
.
- .
. _ - . - . .
. . - .._-
. _~
.-
..
.._ .
.
--
..
. . _
.
. .
MAR 2 41997
i
i
ii
.
!
Enter 0y Operations, Inc.
-4-
E-Mail report to T. Boycel (THB)
E-Mail report to NRR Eveit Tracking System (IPAS)
E-Mail report to Richard Correia (RPC)
E-Mail report to Don Taylor (DRT) .
,
bec to DtAS (IE01)'
bec distrib. by RIV:
l
E. Merschoff
Resident inspector J
DRP Director
DRS-PSB
Branch Chief (DRP/D)
MIS System
Project Engineer (DRP/D)g
RIV File
Branch Chief (DRP/TSS)
.
I
i
i
'
i
f
l
,
.
!
\\
DOCUMENT NAME: R:\\lWAT\\WT702RP.LAK
1
To recewe copy of 9 inep a bor c]cogweout g
er= copy we enciosurec,Y a No copy
RIV:S V 4 ; E
C;D M F
D:DRP \\lN \\!
I
I
LAKeper R7p(
PttH W '
TPGw ynn\\pU .'
,
02/273rT &
03/i@7
03/4//97
l 03/
/97
1
}
3
OFFIC;AL RECORD Col'Y
l
,
,
!
)
i
<
!
.
MAR 2 41997
i
i
t
.i
i
i
Entergy Operations, Inc.
-4-
E-Mail report to T. Boyce (THB)
E-Mail report to NRR Evelt Tracking System (IPAS)
E Mail report to Richard Correia (RPC)
E-Mail report to Don Taylor (DRT)
bec to DMB (IE01)
'
bec distrib. by RIV:
E. Merschoff
Resident inspector i
DRP Director
DRS-PSB
Branch Chief (DRP/D)
MIS System
Project Engineer (DRP/D)g
RIV File
Branch Chief (DRP/TSS)
-
i
i
l
'
i
,
'
i
i
i
'
i
,
I
!
.
.
\\
DOCUMENT NAME: R:\\lWAT\\WT702RP.LAK
(
To recewe copy or 9. h in tm:"C*jCep/wmout ej
F= Copy we enclosums,Y = No copy
'RIV:SFiV 4A
C{DFyqEk p
D:DRP \\fN \\l
l
I
'
LAKefer R7,( '
PttHM
TPGw ynnVJ . '
03/
/97
!
02/2 W \\~ (t'
03/ M7
03/Q//97
'
}
3
OFFICIAL RECORD Col'Y
l
,
,